If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394100212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.328351,"lon":-111.347519,"icon":""}]} |
Location: 00/12-02-039-10W4/0 | |
Location Alias: 00/12-02-39-10 W4M | |
Location Alias 2: 00/12-02-039-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 10 | |
Section: 02 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: CLEO ENERGY PROVOST 12-2-39-10 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0141282 | |
License Date: 1989-10-12 | |
License Status: Issued | |
Spud Date: 1989-10-18 | |
Final Drill Date: 1989-10-21 | |
Well Total Depth: 1032.00 m | |
Surface Hole Latitude: 52.328351 | |
Surface Hole Longitude: -111.347519 |
Date | Event |
---|---|
1989-10-12 | Obtained License |
1989-10-19 | Surface Casing Operation Performed |
1989-10-21 | Finished Drilling |
1989-10-21 | Well Log Performed |
1989-10-21 | Well Mode changed to Drilled and Cased |
1989-10-22 | Production Casing Operation Performed |
1989-10-22 | Rig Released |
1989-11-14 | Well Log Performed |
1989-11-16 | Perforation Treatment Performed - Jet Perforation |
1989-11-16 | Well Log Performed |
1989-11-25 | Well Began Production |
1989-11-25 | Well Fluid changed to Crude Oil |
1989-11-25 | Well Mode changed to Pumping |
1990-06-19 | Perforation Treatment Performed - Chemical Squeeze |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-11-16 | Perforation | 964.70 | 967.50 | 10 |
1989-11-16 | Perforation | 968.30 | 969.40 | 10 |
1990-06-19 | Chemical Squeeze | 964.70 | 969.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 809 | 0.0 | 0.0 | 0.0 |
1990 | 8047 | 0.0 | 0.0 | 0.0 |
1991 | 6807 | 0.0 | 0.0 | 0.0 |
1992 | 6440 | 0.0 | 0.0 | 0.0 |
1993 | 8088 | 0.0 | 0.0 | 0.0 |
1994 | 3233 | 0.0 | 0.0 | 0.0 |
1995 | 2892 | 0.0 | 0.0 | 0.0 |
1996 | 8004 | 0.0 | 0.0 | 0.0 |
1997 | 8419 | 0.0 | 0.0 | 0.0 |
1998 | 8394 | 0.0 | 0.0 | 0.0 |
1999 | 8638 | 0.0 | 0.0 | 0.0 |
2000 | 8720 | 0.0 | 0.0 | 0.0 |
2001 | 7946 | 0.0 | 0.0 | 0.0 |
2002 | 8269 | 0.0 | 0.0 | 0.0 |
2003 | 8604 | 0.0 | 0.0 | 0.0 |
2004 | 8353 | 0.0 | 0.0 | 0.0 |
2005 | 8077 | 0.0 | 0.0 | 0.0 |
2006 | 8498 | 0.0 | 0.0 | 0.0 |
2007 | 8426 | 0.0 | 0.0 | 0.0 |
2008 | 8085 | 0.0 | 0.0 | 0.0 |
2009 | 8591 | 0.0 | 0.0 | 0.0 |
2010 | 8434 | 0.0 | 0.0 | 0.0 |
2011 | 5626 | 0.0 | 0.0 | 0.0 |
2012 | 7694 | 0.0 | 0.0 | 0.0 |
2013 | 6795 | 0.0 | 0.0 | 0.0 |
2014 | 5453 | 0.0 | 0.0 | 0.0 |
2015 | 5619 | 0.0 | 0.0 | 0.0 |
2016 | 6961 | 0.0 | 0.0 | 0.0 |
2017 | 7526 | 0.0 | 0.0 | 0.0 |
2018 | 7955 | 0.0 | 0.0 | 0.0 |
2019 | 8702 | 0.0 | 0.0 | 0.0 |
2020 | 2149 | 0.0 | 0.0 | 0.0 |
For data sources see[5]