If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394100307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.32284,"lon":-111.354918,"icon":""}]} |
Location: 00/07-03-039-10W4/0 | |
Location Alias: 00/07-03-39-10 W4M | |
Location Alias 2: 00/07-03-039-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 10 | |
Section: 03 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: 1994450AB PROVOST 7-3-39-10 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0177602 | |
License Date: 1995-04-26 | |
License Status: Abandoned | |
Spud Date: 1995-05-10 | |
Final Drill Date: 1995-05-12 | |
Well Total Depth: 1023.00 m | |
Surface Hole Latitude: 52.322840 | |
Surface Hole Longitude: -111.354918 |
Date | Event |
---|---|
1995-04-26 | Obtained License |
1995-05-11 | Surface Casing Operation Performed |
1995-05-12 | Finished Drilling |
1995-05-12 | Well Log Performed |
1995-05-12 | Well Mode changed to Drilled and Cased |
1995-05-13 | Drill Stem Test Performed |
1995-05-13 | Production Casing Operation Performed |
1995-05-14 | Rig Released |
1995-05-18 | Perforation Treatment Performed - Jet Perforation |
1995-05-18 | Well Log Performed |
1995-05-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-05-23 | Well Began Production |
1995-05-23 | Well Fluid changed to Crude Oil |
1995-05-23 | Well Mode changed to Pumping |
2000-01-04 | Perforation Treatment Performed - Jet Perforation |
2000-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-01-06 | Plug Back Performed |
2000-01-06 | Well Fluid changed to Crude Oil |
2000-01-06 | Well Mode changed to Abandoned Zone |
2000-06-01 | Well Fluid changed to Crude Oil |
2000-06-01 | Well Mode changed to Abandoned |
2006-06-01 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-05-18 | Perforation | 964.80 | 966.50 | 13 |
1995-05-18 | Perforation | 968.30 | 969.30 | 13 |
1995-05-20 | Acid Treatment | 964.80 | 969.30 | 0 |
2000-01-04 | Perforation | 963.00 | 965.00 | 13 |
2000-01-06 | Packing Device Capped w/Cement | 953.00 | 961.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 4910 | 0.0 | 0.0 | 0.0 |
1996 | 4896 | 0.0 | 0.0 | 0.0 |
1997 | 8291 | 0.0 | 0.0 | 0.0 |
1998 | 8497 | 0.0 | 0.0 | 0.0 |
1999 | 7852 | 0.0 | 0.0 | 0.0 |
For data sources see[5]