X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394101004000

Well Details

Well ID: 0394101004000
Loading map...
Location: 00/04-10-039-10W4/0
Location Alias: 00/04-10-39-10 W4M
Location Alias 2: 00/04-10-039-10 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 10
Section: 10
County/Municipality: County of Paintearth No. 18
Well Name: CLEO ENERGY PROVOST 4-10-39-10
Operator Name: Cleo Energy Corp.
License Number: 0149097
License Date: 1991-06-07
License Status: Issued
Spud Date: 1991-06-11
Final Drill Date: 1991-06-15
Well Total Depth: 1003.00 m
Surface Hole Latitude: 52.334228
Surface Hole Longitude: -111.370976

For data sources see[1][2]

Well History

Date Event
1991-06-07 Obtained License
1991-06-12 Surface Casing Operation Performed
1991-06-15 Finished Drilling
1991-06-15 Well Log Performed
1991-06-15 Well Mode changed to Drilled and Cased
1991-06-16 Drill Stem Test Performed
1991-06-18 Production Casing Operation Performed
1991-06-18 Rig Released
1991-06-21 Well Log Performed
1991-06-24 Perforation Treatment Performed - Jet Perforation
1991-07-05 Well Began Production
1991-07-05 Well Fluid changed to Crude Oil
1991-07-05 Well Mode changed to Pumping
1997-05-31 Well Fluid changed to Crude Oil
1997-05-31 Well Mode changed to Suspended
2001-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-10 Plug Back Performed
2001-01-10 Well Fluid changed to Crude Oil
2001-01-10 Well Log Performed
2001-01-10 Well Mode changed to Abandoned Zone
2003-06-30 Perforation Treatment Performed - Jet Perforation
2003-06-30 Well Log Performed
2003-07-03 Well Log Performed
2003-07-05 Well Log Performed
2003-07-06 Well Log Performed
2003-09-22 Well Began Injection
2003-09-22 Well Fluid changed to Water
2003-09-22 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-06-24 Perforation 964.50 966.80 13
1991-06-24 Perforation 968.30 969.50 13
2001-01-10 Packing Device Capped w/Cement 952.00 960.00 0
2003-06-30 Perforation 971.00 974.00 17
2003-06-30 Perforation 965.00 970.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 4298 0.0 0.0 0.0
1992 8673 0.0 0.0 0.0
1993 8548 0.0 0.0 0.0
1994 3797 0.0 0.0 0.0
1995 7027 0.0 0.0 0.0
1997 336 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References