X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394101112000

Well Details

Well ID: 0394101112000
Loading map...
Location: 00/12-11-039-10W4/0
Location Alias: 00/12-11-39-10 W4M
Location Alias 2: 00/12-11-039-10 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 10
Section: 11
County/Municipality: County of Paintearth No. 18
Well Name: CLEO ENERGY PROVOST 12-11-39-10
Operator Name: Cleo Energy Corp.
License Number: 0141414
License Date: 1989-10-20
License Status: Issued
Spud Date: 1989-10-27
Final Drill Date: 1989-10-30
Well Total Depth: 1032.00 m
Surface Hole Latitude: 52.342599
Surface Hole Longitude: -111.347516

For data sources see[1][2]

Well History

Date Event
1989-10-20 Obtained License
1989-10-28 Surface Casing Operation Performed
1989-10-30 Finished Drilling
1989-10-30 Well Log Performed
1989-10-30 Well Mode changed to Drilled and Cased
1989-10-31 Production Casing Operation Performed
1989-10-31 Rig Released
1989-11-08 Well Log Performed
1989-11-10 Perforation Treatment Performed - Jet Perforation
1989-11-10 Well Log Performed
1989-11-11 Perforation Treatment Performed - Jet Perforation
1989-11-11 Well Log Performed
1989-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-16 Well Began Production
1989-11-16 Well Fluid changed to Crude Oil
1989-11-16 Well Mode changed to Pumping
1990-06-18 Perforation Treatment Performed - Fractured
1990-07-04 Well Fluid changed to Crude Oil
1990-07-04 Well Mode changed to Suspended
1993-08-06 Well Log Performed
1993-08-07 Perforation Treatment Performed - Jet Perforation
1995-01-30 Well Log Performed
1995-02-03 Well Began Injection
1995-02-03 Well Fluid changed to Water
1995-02-03 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-11-10 Perforation 960.00 961.40 10
1989-11-11 Perforation 960.00 961.40 10
1989-11-12 Acid Treatment 960.00 961.40 0
1990-06-18 Fracture 960.00 961.40 0
1993-08-07 Perforation 964.40 967.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1053 0.0 0.0 0.0
1990 3813 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References