If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394101114020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.342468,"lon":-111.334856,"icon":""}]} |
| Location: 02/14-11-039-10W4/0 | |
| Location Alias: 02/14-11-39-10 W4M | |
| Location Alias 2: 02/14-11-039-10 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 10 | |
| Section: 11 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: CLEO ENERGY PROVOST 14-11-39-10 | |
| Operator Name: Cleo Energy Corp. | |
| License Number: 0285990 | |
| License Date: 2003-04-16 | |
| License Status: Amended | |
| Spud Date: 2003-08-04 | |
| Final Drill Date: 2003-08-07 | |
| Well Total Depth: 1088.00 m | |
| Surface Hole Latitude: 52.342468 | |
| Surface Hole Longitude: -111.334856 |
| Date | Event |
|---|---|
| 2003-04-16 | Obtained License |
| 2003-08-04 | Surface Casing Operation Performed |
| 2003-08-05 | Direction Drilling Operation Performed - Deviate |
| 2003-08-07 | Finished Drilling |
| 2003-08-07 | Well Log Performed |
| 2003-08-07 | Well Mode changed to Drilled and Cased |
| 2003-08-08 | Production Casing Operation Performed |
| 2003-08-08 | Rig Released |
| 2003-09-20 | Well Log Performed |
| 2003-09-21 | Perforation Treatment Performed - Jet Perforation |
| 2003-09-26 | Well Began Production |
| 2003-09-26 | Well Fluid changed to Crude Oil |
| 2003-09-26 | Well Mode changed to Pumping |
| 2018-11-10 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2003-08-05 | 220.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2003-09-21 | Perforation | 1025.00 | 1028.00 | 7 |
| 2018-11-10 | Perforation | 1019.00 | 1022.00 | 17 |
| 2018-11-10 | Perforation | 1023.00 | 1028.00 | 17 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2003 | 2185 | 0.0 | 0.0 | 0.0 |
| 2004 | 8363 | 0.0 | 0.0 | 0.0 |
| 2005 | 8590 | 0.0 | 0.0 | 0.0 |
| 2006 | 8502 | 0.0 | 0.0 | 0.0 |
| 2007 | 7894 | 0.0 | 0.0 | 0.0 |
| 2008 | 8193 | 0.0 | 0.0 | 0.0 |
| 2009 | 8396 | 0.0 | 0.0 | 0.0 |
| 2010 | 7265 | 0.0 | 0.0 | 0.0 |
| 2011 | 8745 | 0.0 | 0.0 | 0.0 |
| 2012 | 8199 | 0.0 | 0.0 | 0.0 |
| 2013 | 8101 | 0.0 | 0.0 | 0.0 |
| 2014 | 7797 | 0.0 | 0.0 | 0.0 |
| 2015 | 7736 | 0.0 | 0.0 | 0.0 |
| 2016 | 5938 | 0.0 | 0.0 | 0.0 |
| 2017 | 8169 | 0.0 | 0.0 | 0.0 |
| 2018 | 7900 | 0.0 | 0.0 | 0.0 |
| 2019 | 8450 | 0.0 | 0.0 | 0.0 |
| 2020 | 2057 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-11-07 | No Incident Encountered | 0.00 | 0.00 |
| 2018-11-08 | No Incident Encountered | 0.00 | 0.00 |
| 2018-11-09 | No Incident Encountered | 0.00 | 0.00 |
| 2018-11-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]