If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394101115000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.345642,"lon":-111.335704,"icon":""}]} |
Location: 00/15-11-039-10W4/0 | |
Location Alias: 00/15-11-39-10 W4M | |
Location Alias 2: 00/15-11-039-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 10 | |
Section: 11 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: CLEO ENERGY PROVOST 15-11-39-10 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0332524 | |
License Date: 2005-06-09 | |
License Status: Suspension | |
Spud Date: 2005-06-24 | |
Final Drill Date: 2005-06-27 | |
Well Total Depth: 1027.00 m | |
Surface Hole Latitude: 52.345642 | |
Surface Hole Longitude: -111.335704 |
Date | Event |
---|---|
2005-06-09 | Obtained License |
2005-06-25 | Surface Casing Operation Performed |
2005-06-27 | Finished Drilling |
2005-06-27 | Well Log Performed |
2005-06-27 | Well Mode changed to Drilled and Cased |
2005-06-28 | Production Casing Operation Performed |
2005-06-28 | Rig Released |
2005-07-08 | Well Log Performed |
2005-07-09 | Perforation Treatment Performed - Jet Perforation |
2005-07-11 | Perforation Treatment Performed - Jet Perforation |
2005-07-11 | Well Log Performed |
2005-11-22 | Well Began Production |
2005-11-22 | Well Fluid changed to Crude Oil |
2005-11-22 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-07-09 | Perforation | 955.00 | 957.00 | 20 |
2005-07-11 | Perforation | 949.50 | 952.50 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 804 | 0.0 | 0.0 | 0.0 |
2006 | 8346 | 0.0 | 0.0 | 0.0 |
2007 | 8589 | 0.0 | 0.0 | 0.0 |
2008 | 8633 | 0.0 | 0.0 | 0.0 |
2009 | 8578 | 0.0 | 0.0 | 0.0 |
2010 | 8493 | 0.0 | 0.0 | 0.0 |
2011 | 8722 | 0.0 | 0.0 | 0.0 |
2012 | 8628 | 0.0 | 0.0 | 0.0 |
2013 | 8510 | 0.0 | 0.0 | 0.0 |
2014 | 8040 | 0.0 | 0.0 | 0.0 |
2015 | 7218 | 0.0 | 0.0 | 0.0 |
2016 | 6926 | 0.0 | 0.0 | 0.0 |
2017 | 8020 | 0.0 | 0.0 | 0.0 |
2018 | 1633 | 0.0 | 0.0 | 0.0 |
For data sources see[5]