X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394101415020

Well Details

Well ID: 0394101415020
Loading map...
Location: 02/15-14-039-10W4/0
Location Alias: 02/15-14-39-10 W4M
Location Alias 2: 02/15-14-039-10 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 10
Section: 14
County/Municipality: County of Paintearth No. 18
Well Name: CLEO ENERGY PROVOST 15-14-39-10
Operator Name: Cleo Energy Corp.
License Number: 0148083
License Date: 1991-02-22
License Status: Suspension
Spud Date: 1991-03-02
Final Drill Date: 1991-03-06
Well Total Depth: 1060.00 m
Surface Hole Latitude: 52.359110
Surface Hole Longitude: -111.337229

For data sources see[1][2]

Well History

Date Event
1991-02-22 Obtained License
1991-03-03 Surface Casing Operation Performed
1991-03-04 Direction Drilling Operation Performed - Deviate
1991-03-06 Finished Drilling
1991-03-06 Well Mode changed to Drilled and Cased
1991-03-07 Well Log Performed
1991-03-08 Production Casing Operation Performed
1991-03-08 Rig Released
1991-03-10 Well Log Performed
1991-03-11 Well Log Performed
1991-03-12 Perforation Treatment Performed - Jet Perforation
1991-03-12 Well Log Performed
1991-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-16 Well Began Production
1991-03-16 Well Fluid changed to Crude Oil
1991-03-16 Well Mode changed to Pumping
1994-01-01 Well Fluid changed to Crude Oil
1994-01-01 Well Mode changed to Suspended
2001-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-09 Plug Back Performed
2001-01-09 Well Fluid changed to Crude Oil
2001-01-09 Well Log Performed
2001-01-09 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-03-04 241.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-03-12 Perforation 1008.00 1012.00 14
1991-03-15 Acid Treatment 1008.00 1012.00 0
2001-01-09 Packing Device Capped w/Cement 995.00 1004.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 6686 0.0 0.0 0.0
1992 2806 0.0 0.0 0.0

For data sources see[6]

References