X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394102301020

Well Details

Well ID: 0394102301020
Loading map...
Location: 02/01-23-039-10W4/0
Location Alias: 02/01-23-39-10 W4M
Location Alias 2: 02/01-23-039-10 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 10
Section: 23
County/Municipality: County of Paintearth No. 18
Well Name: CLEO ENERGY PROVOST 1-23-39-10
Operator Name: Cleo Energy Corp.
License Number: 0151796
License Date: 1992-02-21
License Status: Suspension
Spud Date: 1992-02-24
Final Drill Date: 1992-02-27
Well Total Depth: 1035.00 m
Surface Hole Latitude: 52.362330
Surface Hole Longitude: -111.329538

For data sources see[1][2]

Well History

Date Event
1992-02-21 Obtained License
1992-02-25 Direction Drilling Operation Performed - Deviate
1992-02-25 Surface Casing Operation Performed
1992-02-27 Finished Drilling
1992-02-27 Well Log Performed
1992-02-27 Well Mode changed to Drilled and Cased
1992-02-28 Production Casing Operation Performed
1992-02-28 Rig Released
1992-02-28 Well Log Performed
1992-03-02 Well Log Performed
1992-03-06 Perforation Treatment Performed - Jet Perforation
1992-03-06 Well Log Performed
1992-03-11 Well Began Production
1992-03-11 Well Fluid changed to Crude Oil
1992-03-11 Well Mode changed to Pumping
2010-12-09 Well Fluid changed to Crude Oil
2010-12-09 Well Mode changed to Suspended
2013-03-17 Well Log Performed
2013-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-18 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-02-25 205.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-03-06 Perforation 996.50 997.20 14
1992-03-06 Perforation 997.80 1000.00 14
1992-03-06 Perforation 1000.50 1002.00 14
2013-03-18 Cement Squeeze 996.50 1002.00 0
2013-03-18 Packing Device Capped w/Cement 987.00 990.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 6985 0.0 0.0 0.0
1993 8432 0.0 0.0 0.0
1994 8531 0.0 0.0 0.0
1995 8206 0.0 0.0 0.0
1996 8183 0.0 0.0 0.0
1997 8316 0.0 0.0 0.0
1998 8721 0.0 0.0 0.0
1999 8682 0.0 0.0 0.0
2000 8684 0.0 0.0 0.0
2001 8713 0.0 0.0 0.0
2002 8216 0.0 0.0 0.0
2003 8527 0.0 0.0 0.0
2004 8305 0.0 0.0 0.0
2005 7642 0.0 0.0 0.0
2006 7566 0.0 0.0 0.0
2007 6559 0.0 0.0 0.0
2008 6548 0.0 0.0 0.0
2009 4366 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-19 No Incident Encountered 0.00 0.00

For data sources see[7]

References