If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394102303A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.36198,"lon":-111.337444,"icon":""}]} |
| Location: A0/03-23-039-10W4/0 | |
| Location Alias: A0/03-23-39-10 W4M | |
| Location Alias 2: A0/03-23-039-10 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 10 | |
| Section: 23 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: CLEO ENERGY PROVOST 3-23-39-10 | |
| Operator Name: Cleo Energy Corp. | |
| License Number: 0152331 | |
| License Date: 1992-04-28 | |
| License Status: Suspension | |
| Spud Date: 1992-05-05 | |
| Final Drill Date: 1992-05-07 | |
| Well Total Depth: 1007.00 m | |
| Surface Hole Latitude: 52.361980 | |
| Surface Hole Longitude: -111.337444 |
| Date | Event |
|---|---|
| 1992-04-28 | Obtained License |
| 1992-05-06 | Surface Casing Operation Performed |
| 1992-05-07 | Finished Drilling |
| 1992-05-07 | Well Mode changed to Drilled and Cased |
| 1992-05-08 | Production Casing Operation Performed |
| 1992-05-08 | Rig Released |
| 1992-05-08 | Well Log Performed |
| 1992-05-11 | Perforation Treatment Performed - Jet Perforation |
| 1992-05-13 | Perforation Treatment Performed - Jet Perforation |
| 1992-05-20 | Well Began Production |
| 1992-05-20 | Well Fluid changed to Crude Oil |
| 1992-05-20 | Well Mode changed to Pumping |
| 2007-04-24 | Well Fluid changed to Crude Oil |
| 2007-04-24 | Well Mode changed to Suspended |
| 2007-11-03 | Well Fluid changed to Crude Oil |
| 2007-11-03 | Well Mode changed to Pumping |
| 2010-12-10 | Well Fluid changed to Crude Oil |
| 2010-12-10 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1992-05-11 | Perforation | 965.00 | 967.00 | 13 |
| 1992-05-13 | Perforation | 969.50 | 972.30 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1992 | 5272 | 0.0 | 0.0 | 0.0 |
| 1993 | 8701 | 0.0 | 0.0 | 0.0 |
| 1994 | 8658 | 0.0 | 0.0 | 0.0 |
| 1995 | 8414 | 0.0 | 0.0 | 0.0 |
| 1996 | 7899 | 0.0 | 0.0 | 0.0 |
| 1997 | 8069 | 0.0 | 0.0 | 0.0 |
| 1998 | 8743 | 0.0 | 0.0 | 0.0 |
| 1999 | 8702 | 0.0 | 0.0 | 0.0 |
| 2000 | 8747 | 0.0 | 0.0 | 0.0 |
| 2001 | 8606 | 0.0 | 0.0 | 0.0 |
| 2002 | 8390 | 0.0 | 0.0 | 0.0 |
| 2003 | 8602 | 0.0 | 0.0 | 0.0 |
| 2004 | 4432 | 0.0 | 0.0 | 0.0 |
| 2005 | 4624 | 0.0 | 0.0 | 0.0 |
| 2006 | 4991 | 0.0 | 0.0 | 0.0 |
| 2007 | 1126 | 0.0 | 0.0 | 0.0 |
| 2008 | 6106 | 0.0 | 0.0 | 0.0 |
| 2009 | 3224 | 0.0 | 0.0 | 0.0 |
For data sources see[5]