If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394102309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.36962,"lon":-111.327691,"icon":""}]} |
Location: 00/09-23-039-10W4/0 | |
Location Alias: 00/09-23-39-10 W4M | |
Location Alias 2: 00/09-23-039-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 10 | |
Section: 23 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: CLEO ENERGY PROVOST 9-23-39-10 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0383960 | |
License Date: 2007-10-30 | |
License Status: Suspension | |
Spud Date: 2007-11-20 | |
Final Drill Date: 2007-11-23 | |
Well Total Depth: 1035.00 m | |
Surface Hole Latitude: 52.369620 | |
Surface Hole Longitude: -111.327691 |
Date | Event |
---|---|
2007-10-30 | Obtained License |
2007-11-21 | Direction Drilling Operation Performed - Deviate |
2007-11-21 | Surface Casing Operation Performed |
2007-11-23 | Finished Drilling |
2007-11-23 | Well Log Performed |
2007-11-23 | Well Mode changed to Drilled and Cased |
2007-11-24 | Production Casing Operation Performed |
2007-11-25 | Rig Released |
2008-01-16 | Perforation Treatment Performed - Jet Perforation |
2008-01-18 | Perforation Treatment Performed - Cement Squeeze |
2008-01-23 | Perforation Treatment Performed - Jet Perforation |
2008-01-23 | Well Log Performed |
2008-02-15 | Well Began Production |
2008-02-15 | Well Fluid changed to Crude Oil |
2008-02-15 | Well Mode changed to Pumping |
2010-12-09 | Well Fluid changed to Crude Oil |
2010-12-09 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-11-21 | 231.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-01-16 | Perforation | 968.00 | 970.40 | 20 |
2008-01-18 | Cement Squeeze | 968.00 | 970.40 | 0 |
2008-01-23 | Perforation | 981.00 | 983.40 | 20 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 7166 | 0.0 | 0.0 | 0.0 |
2009 | 8244 | 0.0 | 0.0 | 0.0 |
For data sources see[6]