If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394131211003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.342653,"lon":-111.749295,"icon":""}]} |
| Location: 00/11-12-039-13W4/3 | |
| Location Alias: 00/11-12-39-13 W4M | |
| Location Alias 2: 00/11-12-039-13 W4/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 13 | |
| Section: 12 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: ACL PROVOST 11-12-39-13 | |
| Operator Name: Karve Energy Inc. | |
| License Number: 0060548 | |
| License Date: 1976-10-07 | |
| License Status: Suspension | |
| Spud Date: 1976-10-12 | |
| Final Drill Date: 1976-10-15 | |
| Well Total Depth: 1012.50 m | |
| Surface Hole Latitude: 52.342653 | |
| Surface Hole Longitude: -111.749295 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1976-10-07 | Obtained License |
| 1976-10-15 | Drill Stem Test Performed |
| 1976-10-15 | Finished Drilling |
| 1976-10-15 | Well Mode changed to Drilled and Cased |
| 1976-10-16 | Drill Stem Test Performed |
| 1976-10-17 | Production Casing Operation Performed |
| 1976-11-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-11-04 | Perforation Treatment Performed - Jet Perforation |
| 1976-11-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1977-10-16 | Drill Stem Test Performed |
| 1987-01-27 | Well Log Performed |
| 1987-01-28 | Perforation Treatment Performed - Jet Perforation |
| 1987-01-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-02-07 | Perforation Treatment Performed - Fractured |
| 2001-02-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-02-24 | Plug Back Performed |
| 2001-02-24 | Well Log Performed |
| 2001-02-26 | Perforation Treatment Performed - Jet Perforation |
| 2001-02-26 | Well Log Performed |
| 2001-03-06 | Perforation Treatment Performed - Fractured |
| 2004-04-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-04-04 | Plug Back Performed |
| 2004-04-05 | Perforation Treatment Performed - Jet Perforation |
| 2004-04-05 | Well Log Performed |
| 2004-04-29 | Perforation Treatment Performed - Jet Perforation |
| 2004-04-29 | Well Log Performed |
| 2004-05-01 | Perforation Treatment Performed - Fractured |
| 2004-05-13 | Well Began Production |
| 2004-05-13 | Well Fluid changed to Gas |
| 2004-05-13 | Well Mode changed to Flowing |
| 2011-04-01 | Well Fluid changed to Gas |
| 2011-04-01 | Well Mode changed to Pumping |
| 2019-10-01 | Well Fluid changed to Gas |
| 2019-10-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1976-11-04 | Perforation | 960.10 | 963.80 | 7 |
| 2001-02-26 | Perforation | 878.40 | 879.60 | 17 |
| 2001-03-06 | Fracture | 878.40 | 884.50 | 0 |
| 2004-04-04 | Packing Device Capped w/Cement | 862.00 | 870.00 | 0 |
| 2004-04-05 | Perforation | 833.30 | 834.50 | 17 |
| 2004-04-05 | Perforation | 835.70 | 838.20 | 17 |
| 2004-04-29 | Perforation | 835.80 | 837.00 | 17 |
| 2004-04-29 | Perforation | 838.00 | 840.50 | 17 |
| 2004-05-01 | Fracture | 833.30 | 840.50 | 0 |
| 1976-11-04 | Acid Treatment | 960.10 | 963.80 | 0 |
| 1976-11-08 | Acid Treatment | 960.10 | 963.80 | 0 |
| 1987-01-28 | Perforation | 951.60 | 955.20 | 13 |
| 1987-01-28 | Perforation | 959.80 | 961.90 | 13 |
| 1987-01-29 | Acid Treatment | 951.60 | 961.90 | 0 |
| 1999-02-07 | Fracture | 951.60 | 963.80 | 0 |
| 2001-02-24 | Packing Device Capped w/Cement | 937.00 | 945.00 | 0 |
| 2001-02-26 | Perforation | 882.70 | 884.50 | 17 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 5590 | 0.0 | 0.0 | 0.0 |
| 2005 | 1576 | 0.0 | 0.0 | 0.0 |
| 2006 | 8551 | 0.0 | 0.0 | 0.0 |
| 2007 | 8759 | 0.0 | 0.0 | 0.0 |
| 2008 | 8687 | 0.0 | 0.0 | 0.0 |
| 2009 | 8690 | 0.0 | 0.0 | 0.0 |
| 2010 | 8735 | 0.0 | 0.0 | 0.0 |
| 2011 | 8015 | 0.0 | 0.0 | 0.0 |
| 2012 | 7272 | 0.0 | 0.0 | 0.0 |
| 2013 | 5712 | 0.0 | 0.0 | 0.0 |
| 2014 | 5064 | 0.0 | 0.0 | 0.0 |
| 2015 | 5232 | 0.0 | 0.0 | 0.0 |
| 2016 | 4944 | 0.0 | 0.0 | 0.0 |
| 2017 | 1512 | 0.0 | 0.0 | 0.0 |
| 2019 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]