If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394143204000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.390744,"lon":-111.990993,"icon":""}]} |
| Location: 00/04-32-039-14W4/0 | |
| Location Alias: 00/04-32-39-14 W4M | |
| Location Alias 2: 00/04-32-039-14 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 14 | |
| Section: 32 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: ACL PROVOST 4-32-39-14 | |
| Operator Name: Battle River Energy Ltd. | |
| License Number: 0152577 | |
| License Date: 1992-05-28 | |
| License Status: Issued | |
| Spud Date: 1992-06-02 | |
| Final Drill Date: 1992-06-05 | |
| Well Total Depth: 1104.00 m | |
| Surface Hole Latitude: 52.390744 | |
| Surface Hole Longitude: -111.990993 |
| Date | Event |
|---|---|
| 1992-05-28 | Obtained License |
| 1992-06-03 | Surface Casing Operation Performed |
| 1992-06-05 | Finished Drilling |
| 1992-06-05 | Well Log Performed |
| 1992-06-05 | Well Mode changed to Drilled and Cased |
| 1992-06-06 | Drill Stem Test Performed |
| 1992-06-06 | Production Casing Operation Performed |
| 1992-06-06 | Rig Released |
| 1992-08-12 | Well Log Performed |
| 1992-08-13 | Perforation Treatment Performed - Jet Perforation |
| 1992-08-13 | Well Log Performed |
| 1992-08-15 | Perforation Treatment Performed - Jet Perforation |
| 1992-08-15 | Well Log Performed |
| 1992-08-16 | Perforation Treatment Performed - Fractured |
| 1992-08-16 | Well Log Performed |
| 1992-08-17 | Perforation Treatment Performed - Jet Perforation |
| 1992-08-17 | Well Log Performed |
| 1992-08-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-08-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-08-23 | Perforation Treatment Performed - Jet Perforation |
| 1993-10-01 | Well Began Production |
| 1993-10-01 | Well Fluid changed to Gas |
| 1993-10-01 | Well Mode changed to Flowing |
| 1995-01-01 | Well Fluid changed to Gas |
| 1995-01-01 | Well Mode changed to Suspended |
| 1995-11-01 | Well Fluid changed to Gas |
| 1995-11-01 | Well Mode changed to Flowing |
| 2000-09-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2000-09-11 | Perforation Treatment Performed - Jet Perforation |
| 2000-09-11 | Plug Back Performed |
| 2000-09-11 | Well Log Performed |
| 2000-09-25 | Perforation Treatment Performed - Fractured |
| 2000-10-02 | Well Fluid changed to Gas |
| 2000-10-02 | Well Mode changed to Flowing |
| 2004-07-01 | Well Fluid changed to Gas |
| 2004-07-01 | Well Mode changed to Pumping |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1992-08-13 | Perforation | 1072.00 | 1073.50 | 13 |
| 2000-09-11 | Perforation | 891.00 | 896.00 | 17 |
| 2000-09-25 | Fracture | 891.00 | 896.00 | 0 |
| 1992-08-15 | Perforation | 1060.50 | 1061.00 | 13 |
| 1992-08-15 | Perforation | 1062.00 | 1063.00 | 13 |
| 1992-08-16 | Fracture | 1062.00 | 1073.50 | 0 |
| 1992-08-17 | Perforation | 1055.00 | 1056.00 | 13 |
| 1992-08-19 | Acid Treatment | 1055.00 | 1056.00 | 0 |
| 1992-08-22 | Packing Device Capped w/Cement | 1045.00 | 1053.00 | 0 |
| 1992-08-23 | Perforation | 1025.00 | 1027.00 | 13 |
| 2000-09-11 | Packing Device Capped w/Cement | 1007.00 | 1015.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1993 | 2186 | 0.0 | 0.0 | 0.0 |
| 1994 | 7856 | 0.0 | 0.0 | 0.0 |
| 1995 | 1409 | 0.0 | 0.0 | 0.0 |
| 1996 | 2247 | 0.0 | 0.0 | 0.0 |
| 1997 | 225 | 0.0 | 0.0 | 0.0 |
| 1998 | 20 | 0.0 | 0.0 | 0.0 |
| 2000 | 48 | 0.0 | 0.0 | 0.0 |
| 2004 | 4267 | 0.0 | 0.0 | 0.0 |
| 2005 | 8567 | 0.0 | 0.0 | 0.0 |
| 2006 | 8497 | 0.0 | 0.0 | 0.0 |
| 2007 | 8281 | 0.0 | 0.0 | 0.0 |
| 2008 | 8496 | 0.0 | 0.0 | 0.0 |
| 2009 | 8592 | 0.0 | 0.0 | 0.0 |
| 2010 | 8615 | 0.0 | 0.0 | 0.0 |
| 2011 | 8544 | 0.0 | 0.0 | 0.0 |
| 2012 | 8303 | 0.0 | 0.0 | 0.0 |
| 2013 | 4296 | 0.0 | 0.0 | 0.0 |
| 2014 | 5184 | 0.0 | 0.0 | 0.0 |
| 2015 | 5472 | 0.0 | 0.0 | 0.0 |
| 2016 | 4777 | 0.0 | 0.0 | 0.0 |
| 2017 | 4392 | 0.0 | 0.0 | 0.0 |
| 2018 | 5856 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]