If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394241405002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.353637,"lon":-113.359002,"icon":""}]} |
| Location: 00/05-14-039-24W4/2 | |
| Location Alias: 00/05-14-39-24 W4M | |
| Location Alias 2: 00/05-14-039-24 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 14 | |
| County/Municipality: Lacombe County | |
| Well Name: FAIRBORNE CLIVE 5-14-39-24 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0133129 | |
| License Date: 1988-03-15 | |
| License Status: Suspension | |
| Spud Date: 1988-03-26 | |
| Final Drill Date: 1988-04-09 | |
| Well Total Depth: 1943.00 m | |
| Surface Hole Latitude: 52.353637 | |
| Surface Hole Longitude: -113.359002 |
| Date | Event |
|---|---|
| 1988-03-15 | Obtained License |
| 1988-03-28 | Surface Casing Operation Performed |
| 1988-04-09 | Finished Drilling |
| 1988-04-09 | Well Mode changed to Drilled and Cased |
| 1988-04-10 | Well Log Performed |
| 1988-04-11 | Production Casing Operation Performed |
| 1988-04-11 | Rig Released |
| 1988-04-15 | Well Log Performed |
| 1988-04-17 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1988-04-17 | Perforation Treatment Performed - Jet Perforation |
| 1988-04-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-04-18 | Perforation Treatment Performed - Jet Perforation |
| 1988-04-19 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1988-05-19 | Well Began Production |
| 1988-05-19 | Well Fluid changed to Crude Oil |
| 1988-05-19 | Well Mode changed to Pumping |
| 1991-03-07 | Perforation Treatment Performed - Cement Squeeze |
| 1991-03-08 | Perforation Treatment Performed - Cement Squeeze |
| 1991-03-14 | Perforation Treatment Performed - Jet Perforation |
| 1991-03-16 | Perforation Treatment Performed - Cement Squeeze |
| 1991-03-19 | Well Log Performed |
| 1991-03-20 | Perforation Treatment Performed - Jet Perforation |
| 1991-03-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1991-03-22 | Perforation Treatment Performed - Jet Perforation |
| 1991-03-22 | Well Log Performed |
| 1991-03-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-03-02 | Well Log Performed |
| 1995-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-03-04 | Perforation Treatment Performed - Cement Squeeze |
| 1995-03-04 | Plug Back Performed |
| 1995-03-08 | Well Log Performed |
| 1995-03-09 | Perforation Treatment Performed - Jet Perforation |
| 1996-05-01 | Well Fluid changed to Crude Oil |
| 1996-05-01 | Well Mode changed to Suspended |
| 1996-12-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1988-04-17 | Perforation | 1913.00 | 1915.00 | 13 |
| 1991-03-20 | Perforation | 1907.40 | 1908.40 | 16 |
| 1991-03-21 | Acid Treatment | 1907.40 | 1908.40 | 0 |
| 1991-03-22 | Perforation | 1877.50 | 1878.50 | 16 |
| 1991-03-23 | Acid Treatment | 1877.50 | 1878.50 | 0 |
| 1995-03-04 | Acid Treatment | 1907.40 | 1908.40 | 0 |
| 1995-03-04 | Cement Squeeze | 1907.40 | 1908.40 | 0 |
| 1995-03-04 | Cement Squeeze | 1877.50 | 1878.50 | 0 |
| 1995-03-09 | Perforation | 1898.00 | 1900.00 | 13 |
| 1995-03-09 | Perforation | 1901.00 | 1902.50 | 13 |
| 1996-12-18 | Acid Treatment | 1898.00 | 1902.50 | 0 |
| 1988-04-17 | Acid Wash | 1913.00 | 1915.00 | 0 |
| 1988-04-18 | Acid Treatment | 1913.00 | 1915.00 | 0 |
| 1988-04-18 | Perforation | 1878.00 | 1880.00 | 14 |
| 1988-04-19 | Acid Wash | 1878.00 | 1880.00 | 0 |
| 1991-03-07 | Cement Squeeze | 1913.00 | 1915.00 | 0 |
| 1991-03-08 | Cement Squeeze | 1878.00 | 1880.00 | 0 |
| 1991-03-14 | Perforation | 1907.50 | 1910.50 | 18 |
| 1991-03-16 | Cement Squeeze | 1907.50 | 1910.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1988 | 4878 | 0.0 | 0.0 | 0.0 |
| 1989 | 7474 | 0.0 | 0.0 | 0.0 |
| 1990 | 8450 | 0.0 | 0.0 | 0.0 |
| 1991 | 6471 | 0.0 | 0.0 | 0.0 |
| 1992 | 4032 | 0.0 | 0.0 | 0.0 |
For data sources see[5]