X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242314002

Well Details

Well ID: 0394242314002
Loading map...
Location: 00/14-23-039-24W4/2
Location Alias: 00/14-23-39-24 W4M
Location Alias 2: 00/14-23-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 23
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 14-23-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0104574
License Date: 1983-12-07
License Status: Suspension
Spud Date: 1983-12-08
Final Drill Date: 1983-12-22
Well Total Depth: 1935.00 m
Surface Hole Latitude: 52.373698
Surface Hole Longitude: -113.354372

For data sources see[1][2]

Well History

Date Event
1983-12-07 Obtained License
1983-12-22 Finished Drilling
1983-12-22 Well Log Performed
1983-12-22 Well Mode changed to Drilled and Cased
1983-12-24 Production Casing Operation Performed
1984-01-09 Well Log Performed
1984-01-11 Perforation Treatment Performed - Jet Perforation
1984-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-14 Perforation Treatment Performed - Jet Perforation
1984-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-17 Well Began Production
1984-01-17 Well Fluid changed to Crude Oil
1984-01-17 Well Mode changed to Pumping
1988-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-20 Well Log Performed
1993-05-21 Perforation Treatment Performed - Cement Squeeze
1993-05-26 Well Log Performed
1993-05-27 Perforation Treatment Performed - Jet Perforation
1993-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-28 Well Log Performed
1993-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-29 Perforation Treatment Performed - Jet Perforation
1993-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-02 Well Log Performed
1993-06-03 Perforation Treatment Performed - Jet Perforation
1993-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-08 Perforation Treatment Performed - Cement Squeeze
1993-06-08 Plug Back Performed
1993-06-08 Well Fluid changed to Crude Oil
1993-06-08 Well Mode changed to Abandoned Zone
1996-03-20 Well Log Performed
1996-03-22 Perforation Treatment Performed - Cement Squeeze
1996-03-25 Well Log Performed
1996-03-27 Perforation Treatment Performed - Jet Perforation
1996-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-05 Plug Back Performed
1996-05-05 Well Fluid changed to Crude Oil
1996-05-05 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-01-11 Perforation 1892.50 1893.50 14
1993-05-29 Perforation 1850.00 1851.00 17
1993-05-29 Acid Treatment 1850.00 1851.00 0
1993-06-02 Acid Treatment 1850.00 1851.00 0
1993-06-03 Perforation 1847.00 1850.00 17
1993-06-04 Acid Treatment 1847.00 1851.00 0
1993-06-08 Cement Squeeze 1847.00 1851.00 0
1996-03-22 Cement Squeeze 1888.50 1889.50 0
1996-03-27 Perforation 1876.50 1878.50 20
1996-05-05 Packing Device Capped w/Cement 1863.00 1871.00 0
1984-01-12 Acid Treatment 1892.50 1893.50 0
1984-01-14 Perforation 1857.50 1858.00 8
1984-01-17 Acid Treatment 1857.50 1858.00 0
1988-07-14 Acid Treatment 1892.50 1893.50 0
1993-05-21 Cement Squeeze 1892.50 1893.50 0
1993-05-21 Cement Squeeze 1857.50 1858.00 0
1993-05-27 Perforation 1888.50 1889.50 17
1993-05-28 Acid Treatment 1888.50 1889.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 6537 0.0 0.0 0.0
1985 6118 0.0 0.0 0.0
1986 4194 0.0 0.0 0.0
1987 8380 0.0 0.0 0.0
1988 5927 0.0 0.0 0.0
1989 8377 0.0 0.0 0.0
1990 8426 0.0 0.0 0.0
1991 7526 0.0 0.0 0.0
1992 8528 0.0 0.0 0.0
1993 3263 0.0 0.0 0.0

For data sources see[5]

References