X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242612002

Well Details

Well ID: 0394242612002
Loading map...
Location: 00/12-26-039-24W4/2
Location Alias: 00/12-26-39-24 W4M
Location Alias 2: 00/12-26-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 26
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 12-26-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0031395
License Date: 1966-12-02
License Status: RecCertified
Spud Date: 1966-12-10
Final Drill Date: 1966-12-23
Well Total Depth: 1912.30 m
Surface Hole Latitude: 52.385077
Surface Hole Longitude: -113.360281

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-12-02 Obtained License
1966-12-23 Finished Drilling
1966-12-23 Well Mode changed to Drilled and Cased
1966-12-24 Production Casing Operation Performed
1967-01-06 Perforation Treatment Performed - Bullet Perforation
1967-01-07 Perforation Treatment Performed - Acid Wash - No Pressure
1967-01-10 Perforation Treatment Performed - Bullet Perforation
1967-01-11 Perforation Treatment Performed - Acid Wash - No Pressure
1967-01-11 Well Began Production
1967-01-11 Well Fluid changed to Crude Oil
1967-01-11 Well Mode changed to Flowing
1976-10-07 Well Fluid changed to Crude Oil
1976-10-07 Well Mode changed to Pumping
1987-07-04 Perforation Treatment Performed - Cement Squeeze
1987-07-07 Perforation Treatment Performed - Jet Perforation
1987-07-08 Perforation Treatment Performed - Acid Wash - No Pressure
1989-02-11 Perforation Treatment Performed - Cement Squeeze
1989-02-15 Perforation Treatment Performed - Jet Perforation
1989-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-22 Perforation Treatment Performed - Jet Perforation
1989-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-01 Perforation Treatment Performed - Cement Squeeze
1989-03-01 Plug Back Performed
1989-03-01 Well Fluid changed to Crude Oil
1989-03-01 Well Mode changed to Abandoned Zone
1991-04-04 Perforation Treatment Performed - Jet Perforation
1991-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-15 Well Log Performed
2001-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-16 Perforation Treatment Performed - Cement Squeeze
2001-06-16 Plug Back Performed
2001-06-17 Perforation Treatment Performed - Cement Plug
2001-06-17 Perforation Treatment Performed - Jet Perforation
2001-06-17 Perforation Treatment Performed - Remedial Casing
2001-06-17 Well Log Performed
2001-06-18 Perforation Treatment Performed - Cement Plug
2001-06-18 Perforation Treatment Performed - Jet Perforation
2001-06-18 Perforation Treatment Performed - Remedial Casing
2001-06-18 Well Log Performed
2001-07-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-01-06 Bullet Perforation 1886.10 1889.80 7
1989-02-16 Acid Treatment 1882.00 1883.00 0
1989-02-22 Perforation 1840.50 1843.00 13
1989-02-23 Acid Treatment 1840.50 1843.00 0
1989-03-01 Cement Squeeze 1840.50 1843.00 0
1991-04-04 Perforation 1878.00 1880.50 18
1991-04-11 Acid Treatment 1878.00 1880.50 0
2001-06-16 Cement Squeeze 1878.00 1880.50 0
2001-06-16 Packing Device Capped w/Cement 1804.60 1868.00 0
2001-06-17 Perforation 609.60 610.60 13
2001-06-17 Remedial Casing Cementing 609.60 610.60 0
1967-01-07 Acid Wash 1886.10 1889.80 0
2001-06-17 Cement Plug 511.00 610.60 0
2001-06-18 Perforation 253.00 254.00 13
2001-06-18 Remedial Casing Cementing 253.00 254.00 0
2001-06-18 Cement Plug 192.00 254.00 0
1967-01-10 Bullet Perforation 1852.30 1855.30 7
1967-01-11 Acid Wash 1852.30 1855.30 0
1987-07-04 Cement Squeeze 1852.30 1855.30 0
1987-07-07 Perforation 1843.50 1845.50 13
1987-07-08 Acid Wash 1843.50 1845.50 0
1989-02-11 Cement Squeeze 1843.50 1889.80 0
1989-02-15 Perforation 1882.00 1883.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 1271 0.0 0.0 0.0
1968 3034 0.0 0.0 0.0
1969 2431 0.0 0.0 0.0
1970 3393 0.0 0.0 0.0
1971 7623 0.0 0.0 0.0
1972 7597 0.0 0.0 0.0
1973 7442 0.0 0.0 0.0
1974 6154 0.0 0.0 0.0
1975 6965 0.0 0.0 0.0
1976 6796 0.0 0.0 0.0
1977 7673 0.0 0.0 0.0
1978 7500 0.0 0.0 0.0
1979 8249 0.0 0.0 0.0
1980 7563 0.0 0.0 0.0
1981 8687 0.0 0.0 0.0
1982 7583 0.0 0.0 0.0
1983 8237 0.0 0.0 0.0
1984 7954 0.0 0.0 0.0
1985 2880 0.0 0.0 0.0
1987 3572 0.0 0.0 0.0
1988 8183 0.0 0.0 0.0
1989 747 0.0 0.0 0.0

For data sources see[5]

References