If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394243503002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.391526,"lon":-113.354352,"icon":""}]} |
| Location: 00/03-35-039-24W4/2 | |
| Location Alias: 00/03-35-39-24 W4M | |
| Location Alias 2: 00/03-35-039-24 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 35 | |
| County/Municipality: Lacombe County | |
| Well Name: FAIRBORNE CLIVE 3-35-39-24 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0118499 | |
| License Date: 1985-10-22 | |
| License Status: Suspension | |
| Spud Date: 1985-10-23 | |
| Final Drill Date: 1985-11-09 | |
| Well Total Depth: 1925.00 m | |
| Surface Hole Latitude: 52.391526 | |
| Surface Hole Longitude: -113.354352 |
| Date | Event |
|---|---|
| 1985-10-22 | Obtained License |
| 1985-10-24 | Surface Casing Operation Performed |
| 1985-10-28 | Direction Drilling Operation Performed - Deviate |
| 1985-11-08 | Lost Circulation Occurred |
| 1985-11-09 | Finished Drilling |
| 1985-11-09 | Well Log Performed |
| 1985-11-09 | Well Mode changed to Drilled and Cased |
| 1985-11-10 | Drill Stem Test Performed |
| 1985-11-12 | Drill Stem Test Performed |
| 1985-11-14 | Production Casing Operation Performed |
| 1985-11-14 | Rig Released |
| 1985-12-11 | Well Log Performed |
| 1985-12-12 | Perforation Treatment Performed - Jet Perforation |
| 1985-12-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-12-13 | Well Log Performed |
| 1985-12-14 | Perforation Treatment Performed - Jet Perforation |
| 1985-12-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1986-01-20 | Well Began Production |
| 1986-01-20 | Well Fluid changed to Crude Oil |
| 1986-01-20 | Well Mode changed to Flowing |
| 1988-09-13 | Well Fluid changed to Crude Oil |
| 1988-09-13 | Well Mode changed to Pumping |
| 1991-02-09 | Perforation Treatment Performed - Cement Squeeze |
| 1991-02-12 | Perforation Treatment Performed - Cement Squeeze |
| 1991-02-16 | Perforation Treatment Performed - Jet Perforation |
| 1991-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1991-02-22 | Perforation Treatment Performed - Jet Perforation |
| 1996-08-22 | Well Fluid changed to Crude Oil |
| 1996-08-22 | Well Mode changed to Suspended |
| 1996-08-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-08-23 | Perforation Treatment Performed - Cement Squeeze |
| 1996-08-23 | Plug Back Performed |
| 1996-08-26 | Perforation Treatment Performed - Jet Perforation |
| 1996-08-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1985-10-28 | 1388.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1985-12-12 | Perforation | 1879.50 | 1880.50 | 14 |
| 1996-08-23 | Acid Treatment | 1875.00 | 1877.00 | 0 |
| 1996-08-23 | Cement Squeeze | 1835.50 | 1877.00 | 0 |
| 1996-08-26 | Perforation | 1869.50 | 1871.50 | 13 |
| 1996-08-27 | Acid Treatment | 1869.50 | 1871.50 | 0 |
| 1985-12-13 | Acid Treatment | 1879.50 | 1880.50 | 0 |
| 1985-12-14 | Perforation | 1845.50 | 1846.50 | 14 |
| 1985-12-15 | Acid Treatment | 1845.50 | 1846.50 | 0 |
| 1991-02-09 | Cement Squeeze | 1879.50 | 1880.50 | 0 |
| 1991-02-12 | Cement Squeeze | 1845.50 | 1846.50 | 0 |
| 1991-02-16 | Perforation | 1875.00 | 1877.00 | 16 |
| 1991-02-20 | Acid Treatment | 1875.00 | 1877.00 | 0 |
| 1991-02-22 | Perforation | 1835.50 | 1838.00 | 16 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1986 | 7793 | 0.0 | 0.0 | 0.0 |
| 1987 | 8368 | 0.0 | 0.0 | 0.0 |
| 1988 | 8579 | 0.0 | 0.0 | 0.0 |
| 1989 | 8164 | 0.0 | 0.0 | 0.0 |
| 1990 | 8526 | 0.0 | 0.0 | 0.0 |
| 1991 | 7358 | 0.0 | 0.0 | 0.0 |
| 1992 | 1008 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1985-11-08 | Lost Circulation | 1882.00 | 1882.00 |
For data sources see[7]