If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394243514002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.403254,"lon":-113.355472,"icon":""}]} |
| Location: 00/14-35-039-24W4/2 | |
| Location Alias: 00/14-35-39-24 W4M | |
| Location Alias 2: 00/14-35-039-24 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 35 | |
| County/Municipality: Lacombe County | |
| Well Name: FAIRBORNE CLIVE 14-35-39-24 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0082633 | |
| License Date: 1980-05-07 | |
| License Status: Suspension | |
| Spud Date: 1980-05-21 | |
| Final Drill Date: 1980-06-07 | |
| Well Total Depth: 1891.00 m | |
| Surface Hole Latitude: 52.403254 | |
| Surface Hole Longitude: -113.355472 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1980-05-07 | Obtained License |
| 1980-05-21 | Lost Circulation Occurred |
| 1980-06-07 | Finished Drilling |
| 1980-06-07 | Well Log Performed |
| 1980-06-07 | Well Mode changed to Drilled and Cased |
| 1980-06-08 | Drill Stem Test Performed |
| 1980-06-10 | Drill Stem Test Performed |
| 1980-06-11 | Drill Stem Test Performed |
| 1980-06-13 | Production Casing Operation Performed |
| 1980-07-09 | Perforation Treatment Performed - Jet Perforation |
| 1980-07-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-07-15 | Perforation Treatment Performed - Jet Perforation |
| 1980-07-15 | Well Began Production |
| 1980-07-15 | Well Fluid changed to Crude Oil |
| 1980-07-15 | Well Mode changed to Pumping |
| 1980-07-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-08-26 | Perforation Treatment Performed - Cement Squeeze |
| 1993-09-02 | Perforation Treatment Performed - Jet Perforation |
| 1993-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-09-03 | Well Log Performed |
| 1996-09-05 | Perforation Treatment Performed - Cement Squeeze |
| 1996-09-05 | Plug Back Performed |
| 1996-09-06 | Perforation Treatment Performed - Cement Squeeze |
| 1996-09-06 | Plug Back Performed |
| 1996-09-06 | Well Fluid changed to Crude Oil |
| 1996-09-06 | Well Mode changed to Abandoned and Whipstocked |
| 1996-09-09 | Perforation Treatment Performed - Jet Perforation |
| 1996-09-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-09-11 | Plug Back Performed |
| 1996-10-03 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1980-07-09 | Perforation | 1866.50 | 1869.50 | 13 |
| 1996-09-09 | Perforation | 1855.00 | 1858.00 | 13 |
| 1996-09-11 | Packing Device Capped w/Cement | 1838.50 | 1847.00 | 0 |
| 1980-07-11 | Acid Treatment | 1866.50 | 1869.50 | 0 |
| 1980-07-15 | Perforation | 1837.00 | 1843.00 | 13 |
| 1980-07-16 | Acid Treatment | 1837.00 | 1843.00 | 0 |
| 1993-08-26 | Cement Squeeze | 1837.00 | 1843.00 | 0 |
| 1993-09-02 | Perforation | 1833.00 | 1835.50 | 13 |
| 1993-11-15 | Acid Treatment | 1833.00 | 1835.50 | 0 |
| 1996-09-05 | Cement Squeeze | 1866.50 | 1869.50 | 0 |
| 1996-09-06 | Cement Squeeze | 1833.00 | 1835.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1980 | 1686 | 0.0 | 0.0 | 0.0 |
| 1981 | 8471 | 0.0 | 0.0 | 0.0 |
| 1982 | 8110 | 0.0 | 0.0 | 0.0 |
| 1983 | 8519 | 0.0 | 0.0 | 0.0 |
| 1984 | 8306 | 0.0 | 0.0 | 0.0 |
| 1985 | 8561 | 0.0 | 0.0 | 0.0 |
| 1986 | 8227 | 0.0 | 0.0 | 0.0 |
| 1987 | 8356 | 0.0 | 0.0 | 0.0 |
| 1988 | 8681 | 0.0 | 0.0 | 0.0 |
| 1989 | 8169 | 0.0 | 0.0 | 0.0 |
| 1990 | 7358 | 0.0 | 0.0 | 0.0 |
| 1991 | 7728 | 0.0 | 0.0 | 0.0 |
| 1992 | 8147 | 0.0 | 0.0 | 0.0 |
| 1993 | 8095 | 0.0 | 0.0 | 0.0 |
| 1994 | 8521 | 0.0 | 0.0 | 0.0 |
| 1995 | 8206 | 0.0 | 0.0 | 0.0 |
| 1996 | 5694 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1980-05-21 | Lost Circulation | 20.00 | 61.00 |
For data sources see[6]