If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394260703000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.333879,"lon":-113.740906,"icon":""}]} |
| Location: 00/03-07-039-26W4/0 | |
| Location Alias: 00/03-07-39-26 W4M | |
| Location Alias 2: 00/03-07-039-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 07 | |
| County/Municipality: Red Deer County | |
| Well Name: IMPERIAL RED DEER 3-7V-39-26 | |
| Operator Name: Imperial Oil Limited | |
| License Number: 0012771 | |
| License Date: 1956-12-06 | |
| License Status: RecExempt | |
| Spud Date: 1956-12-12 | |
| Final Drill Date: 1956-12-29 | |
| Well Total Depth: 1547.20 m | |
| Surface Hole Latitude: 52.333879 | |
| Surface Hole Longitude: -113.740906 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1956-01-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1956-01-19 | Perforation Treatment Performed - Jet Perforation |
| 1956-12-06 | Obtained License |
| 1956-12-12 | Direction Drilling Operation Performed - 98 |
| 1956-12-29 | Finished Drilling |
| 1956-12-29 | Production Casing Operation Performed |
| 1956-12-29 | Well Mode changed to Drilled and Cased |
| 1957-01-24 | Well Began Production |
| 1957-01-24 | Well Fluid changed to Crude Oil |
| 1957-01-24 | Well Mode changed to Pumping |
| 1962-04-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1962-05-16 | Well Abandoned |
| 1962-05-16 | Well Fluid changed to Crude Oil |
| 1962-05-16 | Well Mode changed to Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1956-12-12 | 1065.60 | Conversion |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1956-01-19 | Perforation | 1528.60 | 1530.40 | 13 |
| 1956-01-19 | Acid Treatment | 1528.60 | 1530.40 | 0 |
| 1962-04-13 | Packing Device Capped w/Cement | 1474.30 | 1474.30 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]