X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394260707002

Well Details

Well ID: 0394260707002
Loading map...
Location: 00/07-07-039-26W4/2
Location Alias: 00/07-07-39-26 W4M
Location Alias 2: 00/07-07-039-26 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 26
Section: 07
County/Municipality: Red Deer County
Well Name: NALR JOFFRE 7-7-39-26
Operator Name: NAL Resources Limited
License Number: 0011384
License Date: 1956-05-02
License Status: RecCertified
Spud Date: 1957-01-15
Final Drill Date: 1957-03-02
Well Total Depth: 2177.20 m
Surface Hole Latitude: 52.337577
Surface Hole Longitude: -113.732254

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-05-02 Obtained License
1957-01-28 Drill Stem Test Performed
1957-01-29 Drill Stem Test Performed
1957-02-08 Drill Stem Test Performed
1957-02-09 Drill Stem Test Performed
1957-03-02 Drill Stem Test Performed
1957-03-02 Finished Drilling
1957-03-02 Well Mode changed to Drilled and Cased
1957-03-05 Production Casing Operation Performed
1957-03-07 Perforation Treatment Performed - Jet Perforation
1957-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-27 Perforation Treatment Performed - Cement Squeeze
1978-04-28 Perforation Treatment Performed - Jet Perforation
1978-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-06-20 Perforation Treatment Performed - Cement Plug
1983-06-20 Perforation Treatment Performed - Cement Squeeze
1983-06-22 Well Log Performed
1983-06-23 Perforation Treatment Performed - Jet Perforation
1983-07-28 Perforation Treatment Performed - Cement Squeeze
1983-07-30 Perforation Treatment Performed - Jet Perforation
1983-08-26 Perforation Treatment Performed - Jet Perforation
1984-01-15 Well Began Production
1984-01-15 Well Fluid changed to Crude Oil
1984-01-15 Well Mode changed to Pumping
1984-04-01 Well Fluid changed to Crude Oil
1984-04-01 Well Mode changed to Suspended
1984-06-18 Well Log Performed
1992-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-17 Perforation Treatment Performed - Jet Perforation
1992-06-17 Plug Back Performed
1992-06-17 Well Log Performed
1992-06-22 Perforation Treatment Performed - Cement Plug
1992-06-22 Perforation Treatment Performed - Remedial Casing
1992-06-22 Well Fluid changed to Crude Oil
1992-06-22 Well Mode changed to Abandoned
1992-09-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-03-07 Perforation 2134.50 2143.00 13
1983-06-23 Perforation 1773.10 1776.10 13
1983-07-28 Cement Squeeze 1768.80 1776.10 0
1983-07-30 Perforation 1755.00 1757.00 13
1983-08-26 Perforation 1766.50 1769.50 13
1992-06-17 Packing Device Capped w/Cement 1736.30 1744.30 0
1992-06-17 Packing Device Capped w/Cement 595.00 603.00 0
1992-06-17 Perforation 222.00 222.50 13
1992-06-22 Remedial Casing Cementing 222.00 222.50 0
1992-06-22 Cement Plug 130.00 222.50 0
1957-03-08 Acid Treatment 2134.50 2143.00 0
1978-04-27 Cement Squeeze 2134.50 2143.00 0
1978-04-28 Perforation 2128.10 2133.60 0
1978-05-01 Acid Treatment 2128.10 2133.60 0
1983-06-20 Cement Squeeze 2128.10 2133.60 0
1983-06-20 Packing Device Capped w/Cement 2090.00 2115.00 0
1983-06-20 Cement Plug 1787.80 1852.10 0
1983-06-23 Perforation 1768.80 1771.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 684 0.0 0.0 0.0

For data sources see[5]

References