X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395010110000

Well Details

Well ID: 0395010110000
Loading map...
Location: 00/10-01-039-01W5/0
Location Alias: 00/10-01-39-01 W5M
Location Alias 2: 00/10-01-039-01 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 01
Section: 01
County/Municipality: Red Deer County
Well Name: NAL PREVO 10-1-39-1
Operator Name: NAL Resources Limited
License Number: 0409127
License Date: 2009-02-11
License Status: Suspension
Spud Date: 2009-03-06
Final Drill Date: 2009-03-07
Well Total Depth: 920.00 m
Surface Hole Latitude: 52.327003
Surface Hole Longitude: -114.008527

For data sources see[1][2]

Well History

Date Event
2009-02-11 Obtained License
2009-03-06 Surface Casing Operation Performed
2009-03-07 Finished Drilling
2009-03-07 Well Mode changed to Drilled and Cased
2009-03-08 Production Casing Operation Performed
2009-03-08 Rig Released
2009-03-08 Well Log Performed
2009-06-02 Perforation Treatment Performed - Jet Perforation
2009-06-03 Perforation Treatment Performed - Fractured
2009-06-03 Perforation Treatment Performed - Jet Perforation
2009-06-04 Perforation Treatment Performed - Fractured
2009-06-04 Perforation Treatment Performed - Jet Perforation
2009-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-12 Plug Back Performed
2009-06-12 Well Mode changed to Abandoned Zone
2009-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-13 Perforation Treatment Performed - Cement Squeeze
2009-06-13 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-06-02 Perforation 886.50 887.50 60
2009-06-13 Packing Device Capped w/Cement 502.00 510.00 0
2009-06-13 Cement Squeeze 466.00 470.00 0
2009-06-02 Perforation 538.00 540.00 60
2009-06-03 Fracture 886.50 887.50 0
2009-06-03 Fracture 538.00 540.00 0
2009-06-03 Perforation 515.00 519.00 60
2009-06-04 Perforation 466.00 470.00 60
2009-06-04 Fracture 515.00 519.00 0
2009-06-04 Fracture 466.00 470.00 0
2009-06-12 Packing Device Capped w/Cement 872.00 880.00 0

For data sources see[4]



References