X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395031610002

Well Details

Well ID: 0395031610002
Loading map...
Location: 00/10-16-039-03W5/2
Location Alias: 00/10-16-39-03 W5M
Location Alias 2: 00/10-16-039-03 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 16
County/Municipality: Eckville
Well Name: CVE MEDRIV 10-16-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0022472
License Date: 1962-05-29
License Status: Abandoned
Spud Date: 1962-06-05
Final Drill Date: 1962-06-22
Well Total Depth: 2186.90 m
Surface Hole Latitude: 52.357344
Surface Hole Longitude: -114.370443

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-05-29 Obtained License
1962-06-20 Drill Stem Test Performed
1962-06-21 Drill Stem Test Performed
1962-06-22 Drill Stem Test Performed
1962-06-22 Finished Drilling
1962-06-22 Well Mode changed to Drilled and Cased
1962-06-23 Production Casing Operation Performed
1962-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-24 Perforation Treatment Performed - Acid Wash - No Pressure
1962-06-24 Perforation Treatment Performed - Jet Perforation
1963-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1963-08-01 Perforation Treatment Performed - Bullet Perforation
1963-08-14 Well Began Production
1963-08-14 Well Fluid changed to Crude Oil
1963-08-14 Well Mode changed to Pumping
1963-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-05-18 Well Log Performed
1984-05-19 Well Log Performed
1984-05-20 Perforation Treatment Performed - Jet Perforation
1984-05-20 Well Fluid changed to Crude Oil
1984-05-20 Well Mode changed to Abandoned Zone
1987-05-08 Well Log Performed
1987-05-09 Perforation Treatment Performed - Jet Perforation
1987-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-04 Perforation Treatment Performed - Cement Squeeze
1999-08-04 Plug Back Performed
1999-08-07 Perforation Treatment Performed - Jet Perforation
1999-08-07 Well Log Performed
1999-08-09 Perforation Treatment Performed - Fractured
2019-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-27 Perforation Treatment Performed - Jet Perforation
2019-10-27 Plug Back Performed
2019-10-27 Well Log Performed
2019-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-28 Perforation Treatment Performed - Cement Squeeze
2019-10-28 Perforation Treatment Performed - Jet Perforation
2019-10-28 Well Log Performed
2019-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-29 Perforation Treatment Performed - Cement Squeeze
2019-10-29 Perforation Treatment Performed - Jet Perforation
2019-10-29 Well Log Performed
2019-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-30 Perforation Treatment Performed - Cement Squeeze
2019-10-30 Perforation Treatment Performed - Jet Perforation
2019-10-30 Well Log Performed
2019-11-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-06-24 Perforation 2156.20 2168.30 7
1987-05-09 Perforation 1895.50 1897.00 13
1987-05-10 Acid Treatment 1895.50 1898.20 0
1999-08-04 Cement Squeeze 1895.00 1898.20 0
1999-08-07 Perforation 2094.60 2101.30 17
1999-08-09 Fracture 2094.60 2101.30 0
2019-10-27 Packing Device Capped w/Cement 2077.90 2085.90 0
2019-10-27 Perforation 1006.00 1007.00 13
2019-10-27 Packing Device Capped w/Cement 1878.90 1886.90 0
2019-10-28 Perforation 513.00 514.00 13
2019-10-28 Cement Squeeze 1006.00 1007.00 0
1962-06-24 Acid Wash 2156.20 2168.30 0
2019-10-28 Packing Device Capped w/Cement 990.80 999.80 0
2019-10-29 Packing Device Capped w/Cement 390.90 398.90 0
2019-10-29 Perforation 404.00 405.00 13
2019-10-29 Packing Device Capped w/Cement 498.90 506.90 0
2019-10-29 Cement Squeeze 404.00 405.00 0
2019-10-30 Cement Squeeze 219.00 220.00 0
2019-10-30 Packing Device Capped w/Cement 205.90 213.90 0
2019-10-30 Perforation 219.00 220.00 13
1962-06-24 Acid Treatment 2156.20 2168.30 0
1963-08-01 Packing Device Capped w/Cement 2151.90 2151.90 0
1963-08-01 Bullet Perforation 2125.10 2126.90 7
1963-08-01 Acid Treatment 2125.10 2126.90 0
1963-12-07 Acid Treatment 2125.10 2126.90 0
1984-05-18 Packing Device Capped w/Cement 2107.00 2115.00 0
1984-05-20 Perforation 1897.00 1898.20 15

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1981 122 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References