X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395031614002

Well Details

Well ID: 0395031614002
Loading map...
Location: 00/14-16-039-03W5/2
Location Alias: 00/14-16-39-03 W5M
Location Alias 2: 00/14-16-039-03 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 16
County/Municipality: Eckville
Well Name: CVE MEDRIV 14-16-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0021777
License Date: 1961-12-05
License Status: RecCertified
Spud Date: 1961-12-27
Final Drill Date: 1962-01-21
Well Total Depth: 2171.70 m
Surface Hole Latitude: 52.361935
Surface Hole Longitude: -114.377698

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-12-05 Obtained License
1962-01-21 Finished Drilling
1962-01-21 Well Mode changed to Drilled and Cased
1962-01-22 Production Casing Operation Performed
1962-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-23 Perforation Treatment Performed - Acid Wash - No Pressure
1962-01-23 Perforation Treatment Performed - Jet Perforation
1962-02-03 Perforation Treatment Performed - Fractured
1984-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-01 Plug Back Performed
1984-09-02 Perforation Treatment Performed - Jet Perforation
1984-09-02 Well Began Production
1984-09-02 Well Fluid changed to Crude Oil
1984-09-02 Well Mode changed to Flowing
1997-07-16 Well Log Performed
1997-07-23 Perforation Treatment Performed - Cement Squeeze
1997-07-23 Plug Back Performed
1997-07-24 Perforation Treatment Performed - Jet Perforation
1997-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-25 Plug Back Performed
1997-07-26 Perforation Treatment Performed - Jet Perforation
1997-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-30 Perforation Treatment Performed - Cement Plug
1998-07-30 Perforation Treatment Performed - Jet Perforation
1998-07-30 Perforation Treatment Performed - Remedial Casing
1998-07-30 Plug Back Performed
1998-07-30 Well Fluid changed to Crude Oil
1998-07-30 Well Log Performed
1998-07-30 Well Mode changed to Abandoned Zone
1998-07-31 Well Abandoned
1998-07-31 Well Fluid changed to Crude Oil
1998-07-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-01-23 Perforation 2144.30 2147.90 7
1997-07-26 Perforation 2133.00 2135.70 18
1997-07-28 Acid Treatment 2133.00 2135.70 0
1998-07-30 Packing Device Capped w/Cement 2112.00 2120.00 0
1998-07-30 Perforation 365.70 366.70 13
1998-07-30 Remedial Casing Cementing 365.70 366.70 0
1998-07-30 Cement Plug 330.00 366.70 0
1962-01-23 Acid Wash 2144.30 2147.90 0
1962-01-23 Acid Treatment 2144.30 2147.90 0
1962-02-03 Fracture 2144.30 2147.90 0
1984-09-01 Packing Device Capped w/Cement 2126.50 2135.00 0
1984-09-02 Perforation 1915.30 1916.60 13
1997-07-23 Cement Squeeze 1915.30 1916.60 0
1997-07-24 Perforation 2144.30 2147.90 7
1997-07-25 Packing Device Capped w/Cement 2140.00 2143.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1436 0.0 0.0 0.0
1985 3468 0.0 0.0 0.0
1986 4616 0.0 0.0 0.0
1987 2975 0.0 0.0 0.0
1988 410 0.0 0.0 0.0

For data sources see[5]

References