X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395031806000

Well Details

Well ID: 0395031806000
Loading map...
Location: 00/06-18-039-03W5/0
Location Alias: 00/06-18-39-03 W5M
Location Alias 2: 00/06-18-039-03 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 18
County/Municipality: Lacombe County
Well Name: NAL MEDR 6-18-39-3
Operator Name: NAL Resources Limited
License Number: 0026193
License Date: 1964-06-02
License Status: Issued
Spud Date: 1964-06-07
Final Drill Date: 1964-06-20
Well Total Depth: 2222.90 m
Surface Hole Latitude: 52.354362
Surface Hole Longitude: -114.425207

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-06-01 Production Casing Operation Performed
1964-06-02 Obtained License
1964-06-20 Finished Drilling
1964-06-20 Well Mode changed to Drilled and Cased
1964-06-21 Drill Stem Test Performed
1964-06-22 Drill Stem Test Performed
1964-06-25 Perforation Treatment Performed - Jet Perforation
1964-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-27 Perforation Treatment Performed - Fractured
1964-07-12 Well Began Production
1964-07-12 Well Fluid changed to Crude Oil
1964-07-12 Well Mode changed to Flowing
1966-07-05 Perforation Treatment Performed - Bullet Perforation
1966-07-06 Perforation Treatment Performed - Acid Wash - No Pressure
1966-07-09 Perforation Treatment Performed - Acid Wash - No Pressure
1966-07-09 Perforation Treatment Performed - Bullet Perforation
1966-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-05-30 Well Fluid changed to Crude Oil
1975-05-30 Well Mode changed to Pumping
1982-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-16 Perforation Treatment Performed - Jet Perforation
1982-12-16 Well Fluid changed to Crude Oil
1982-12-16 Well Mode changed to Suspended
1989-06-29 Well Log Performed
1989-07-04 Perforation Treatment Performed - Jet Perforation
1989-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-15 Perforation Treatment Performed - Chemical Squeeze
1993-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-17 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-06-25 Perforation 2170.20 2171.70 13
1982-12-16 Acid Treatment 2141.40 2144.20 0
1989-07-04 Perforation 2140.90 2145.80 13
1989-07-05 Acid Treatment 2140.90 2145.80 0
1993-06-15 Chemical Squeeze 2140.90 2145.80 0
1993-06-17 Acid Treatment 2140.90 2145.80 0
2003-09-17 Fracture 2141.40 2144.20 0
1964-06-27 Acid Treatment 2170.20 2171.70 0
1964-06-27 Fracture 2170.20 2171.70 0
1966-07-05 Bullet Perforation 2199.40 2201.30 7
1966-07-06 Acid Wash 2199.40 2201.30 0
1966-07-09 Bullet Perforation 2190.90 2195.20 7
1966-07-09 Acid Wash 2190.90 2201.30 0
1966-07-14 Packing Device Capped w/Cement 2185.40 2185.40 0
1982-12-16 Perforation 2141.40 2144.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8273 0.0 0.0 0.0
1968 7982 0.0 0.0 0.0
1969 3634 0.0 0.0 0.0
1970 3559 0.0 0.0 0.0
1971 5960 0.0 0.0 0.0
1972 8295 0.0 0.0 0.0
1973 8606 0.0 0.0 0.0
1974 2062 0.0 0.0 0.0
1975 1824 0.0 0.0 0.0
1976 8459 0.0 0.0 0.0
1977 8558 0.0 0.0 0.0
1978 8680 0.0 0.0 0.0
1979 8085 0.0 0.0 0.0
1980 8573 0.0 0.0 0.0
1981 7576 0.0 0.0 0.0
1982 1830 0.0 0.0 0.0

For data sources see[5]

References