X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395041807000

Well Details

Well ID: 0395041807000
Loading map...
Location: 00/07-18-039-04W5/0
Location Alias: 00/07-18-39-04 W5M
Location Alias 2: 00/07-18-039-04 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 04
Section: 18
County/Municipality: Clearwater County
Well Name: PSEC MEDRIV 7-18-39-4
Operator Name: Prairie Storm Energy Corp.
License Number: 0444923
License Date: 2012-03-14
License Status: Issued
Spud Date: 2012-07-09
Final Drill Date: 2012-07-30
Well Total Depth: 4102.00 m
Surface Hole Latitude: 52.359382
Surface Hole Longitude: -114.534861

For data sources see[1][2]

Well History

Date Event
2012-03-14 Obtained License
2012-07-12 Surface Casing Operation Performed
2012-07-13 Well Log Performed
2012-07-14 Direction Drilling Operation Performed - Deviate
2012-07-17 Direction Drilling Operation Performed - Horizontal
2012-07-20 Intermediate Casing Operation Performed
2012-07-23 Well Log Performed
2012-07-30 Finished Drilling
2012-07-30 Well Log Performed
2012-07-30 Well Mode changed to Drilled and Cased
2012-08-01 Liner Casing Operation Performed
2012-08-02 Rig Released
2012-08-14 Well Log Performed
2012-08-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-20 Perforation Treatment Performed - Open-Hole Completion
2012-09-06 Well Log Performed
2012-09-15 Well Began Production
2012-09-15 Well Fluid changed to Crude Oil
2012-09-15 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-09 Bonanza Drilling Inc. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-14 1668.00 Deviate (5 - 79 degrees)
2012-07-17 2485.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-20 Open Hole/Barefoot Completion 4089.00 4102.00 0
2012-08-20 Multi-Stage Fracture 3084.10 3084.20 0
2012-08-20 Multi-Stage Fracture 2969.40 2969.50 0
2012-08-20 Multi-Stage Fracture 2881.40 2881.50 0
2012-08-20 Multi-Stage Fracture 2780.00 2780.10 0
2012-08-20 Multi-Stage Fracture 2678.70 2678.80 0
2012-08-20 Multi-Stage Fracture 3992.60 3992.70 0
2012-08-20 Multi-Stage Fracture 3904.60 3904.70 0
2012-08-20 Multi-Stage Fracture 3678.80 3678.90 0
2012-08-20 Multi-Stage Fracture 3590.90 3591.00 0
2012-08-20 Multi-Stage Fracture 3476.20 3476.30 0
2012-08-20 Multi-Stage Fracture 3374.90 3375.00 0
2012-08-20 Multi-Stage Fracture 3273.50 3273.60 0
2012-08-20 Multi-Stage Fracture 3185.50 3185.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2321 0.0 0.0 0.0
2013 8347 0.0 0.0 0.0
2014 8552 0.0 0.0 0.0
2015 8655 0.0 0.0 0.0
2016 8651 0.0 0.0 0.0
2017 8376 0.0 0.0 0.0
2018 6897 0.0 0.0 0.0
2019 8009 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-02 No Incident Encountered 0.00 0.00
2012-09-17 No Incident Encountered 0.00 0.00

For data sources see[8]

References