X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395041911002

Well Details

Well ID: 0395041911002
Loading map...
Location: 00/11-19-039-04W5/2
Location Alias: 00/11-19-39-04 W5M
Location Alias 2: 00/11-19-039-04 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 04
Section: 19
County/Municipality: Clearwater County
Well Name: PSEC MEDRIV 11-19-39-4
Operator Name: Prairie Storm Energy Corp.
License Number: 0048458
License Date: 1973-12-21
License Status: Suspension
Spud Date: 1974-01-05
Final Drill Date: 1974-01-21
Well Total Depth: 2324.10 m
Surface Hole Latitude: 52.372716
Surface Hole Longitude: -114.569153

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-12-21 Obtained License
1974-01-21 Finished Drilling
1974-01-21 Well Mode changed to Drilled and Cased
1974-01-23 Drill Stem Test Performed
1974-01-24 Drill Stem Test Performed
1974-01-25 Production Casing Operation Performed
1974-02-07 Perforation Treatment Performed - Fractured
1974-02-07 Perforation Treatment Performed - Jet Perforation
2001-11-28 Well Log Performed
2001-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-04 Perforation Treatment Performed - Cement Plug
2001-12-04 Plug Back Performed
2001-12-06 Perforation Treatment Performed - Jet Perforation
2001-12-06 Well Log Performed
2001-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-07 Perforation Treatment Performed - Remedial Casing
2011-08-25 Perforation Treatment Performed - Jet Perforation
2011-09-04 Perforation Treatment Performed - Remedial Casing
2011-09-09 Perforation Treatment Performed - Jet Perforation
2011-09-11 Well Log Performed
2011-09-12 Perforation Treatment Performed - Jet Perforation
2011-09-15 Perforation Treatment Performed - Fractured
2019-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-18 Plug Back Performed
2019-09-18 Well Mode changed to Abandoned Zone
2019-09-19 Perforation Treatment Performed - Cement Squeeze
2019-09-19 Perforation Treatment Performed - Jet Perforation
2019-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-20 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-02-07 Perforation 2229.00 2230.50 20
2011-09-04 Remedial Casing Cementing 515.00 516.00 0
2011-09-09 Perforation 2229.00 2230.50 17
2011-09-12 Perforation 2249.10 2252.10 17
2011-09-15 Fracture 2249.10 2252.10 0
2019-09-18 Packing Device Capped w/Cement 2234.00 2242.00 0
2019-09-19 Perforation 2229.00 2230.50 20
2019-09-19 Cement Squeeze 2229.00 2230.50 0
2019-09-20 Packing Device Capped w/Cement 2115.60 2216.00 0
1974-02-07 Fracture 2229.00 2230.50 0
2001-12-04 Packing Device Capped w/Cement 2219.00 2227.00 0
2001-12-04 Cement Plug 1228.90 1313.50 0
2001-12-06 Perforation 515.00 516.00 14
2001-12-07 Remedial Casing Cementing 515.00 516.00 0
2001-12-07 Packing Device Capped w/Cement 493.30 505.30 0
2001-12-07 Packing Device Capped w/Cement 264.10 276.70 0
2011-08-25 Perforation 515.00 516.00 14

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-20 No Incident Encountered 0.00 0.00

For data sources see[5]

References