X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395050102000

Well Details

Well ID: 0395050102000
Loading map...
Location: 00/02-01-039-05W5/0
Location Alias: 00/02-01-39-05 W5M
Location Alias 2: 00/02-01-039-05 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 05
Section: 01
County/Municipality: Clearwater County
Well Name: FBRL ET AL MEDRIV 2-1-39-5
Operator Name: Ferrybank Resources Ltd.
License Number: 0028622
License Date: 1965-07-23
License Status: Issued
Spud Date: 1965-07-29
Final Drill Date: 1965-08-24
Well Total Depth: 2481.70 m
Surface Hole Latitude: 52.321118
Surface Hole Longitude: -114.586450

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-07-23 Obtained License
1965-08-20 Drill Stem Test Performed
1965-08-24 Finished Drilling
1965-08-24 Well Mode changed to Drilled and Cased
1965-08-27 Production Casing Operation Performed
1965-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-11 Perforation Treatment Performed - Acid Wash - No Pressure
1965-09-11 Perforation Treatment Performed - Jet Perforation
1965-09-17 Perforation Treatment Performed - Cement Squeeze
1965-09-19 Perforation Treatment Performed - Bullet Perforation
1965-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-25 Perforation Treatment Performed - Fractured
1965-11-02 Well Began Production
1965-11-02 Well Fluid changed to Crude Oil
1965-11-02 Well Mode changed to Pumping
1968-08-15 Perforation Treatment Performed - Cement Squeeze
1968-08-15 Well Fluid changed to Crude Oil
1968-08-15 Well Mode changed to Abandoned Zone
1968-08-19 Perforation Treatment Performed - Acid Wash - No Pressure
1968-08-19 Perforation Treatment Performed - Jet Perforation
1969-08-01 Perforation Treatment Performed - Cement Plug

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-09-11 Perforation 1846.80 1847.40 10
1968-08-15 Cement Squeeze 1846.80 1849.20 0
1968-08-19 Perforation 2358.50 2361.00 7
1968-08-19 Perforation 2361.60 2363.40 7
1968-08-19 Acid Wash 2358.50 2363.40 0
1969-08-01 Cement Plug 2231.70 2380.50 0
1965-09-11 Perforation 1848.30 1849.20 10
1965-09-11 Acid Wash 1846.80 1849.20 0
1965-09-11 Acid Treatment 1846.80 1849.20 0
1965-09-17 Cement Squeeze 1846.80 1849.20 0
1965-09-19 Bullet Perforation 1846.80 1847.40 10
1965-09-19 Bullet Perforation 1848.30 1849.20 10
1965-09-21 Acid Treatment 1846.80 1849.20 0
1965-09-25 Fracture 1846.80 1849.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0

For data sources see[5]

References