If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395050716003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.345264,"lon":-114.702688,"icon":""}]} |
Location: 00/16-07-039-05W5/3 | |
Location Alias: 00/16-07-39-05 W5M | |
Location Alias 2: 00/16-07-039-05 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 05 | |
Section: 07 | |
County/Municipality: Clearwater County | |
Well Name: ANDERSON WILLGR 16-7-39-5 | |
Operator Name: Response Energy Corporation | |
License Number: 0112790 | |
License Date: 1985-01-23 | |
License Status: Suspension | |
Spud Date: 1985-02-04 | |
Final Drill Date: 1985-02-22 | |
Well Total Depth: 2430.00 m | |
Surface Hole Latitude: 52.345264 | |
Surface Hole Longitude: -114.702688 |
Date | Event |
---|---|
1975-03-13 | Well Log Performed |
1985-01-23 | Obtained License |
1985-02-08 | Surface Casing Operation Performed |
1985-02-18 | Drill Stem Test Performed |
1985-02-22 | Finished Drilling |
1985-02-23 | Well Log Performed |
1985-02-24 | Drill Stem Test Performed |
1985-02-26 | Production Casing Operation Performed |
1985-02-26 | Rig Released |
1985-03-06 | Perforation Treatment Performed - Jet Perforation |
1985-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-03-09 | Perforation Treatment Performed - Fractured |
1985-03-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-03-13 | Perforation Treatment Performed - Jet Perforation |
1985-03-13 | Well Log Performed |
1985-03-15 | Perforation Treatment Performed - Fractured |
1985-10-27 | Perforation Treatment Performed - Jet Perforation |
1985-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-11-06 | Perforation Treatment Performed - Jet Perforation |
1985-11-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-11-14 | Perforation Treatment Performed - Fractured |
1985-11-21 | Well Mode changed to Drilled and Cased |
1999-11-29 | Perforation Treatment Performed - Cement Squeeze |
1999-11-29 | Perforation Treatment Performed - Jet Perforation |
1999-11-29 | Plug Back Performed |
1999-12-01 | Perforation Treatment Performed - Cement Squeeze |
1999-12-01 | Plug Back Performed |
1999-12-04 | Perforation Treatment Performed - Jet Perforation |
1999-12-06 | Perforation Treatment Performed - Fractured |
2000-02-12 | Well Began Production |
2000-02-12 | Well Fluid changed to Crude Oil |
2000-02-12 | Well Mode changed to Pumping |
2000-02-13 | Well Fluid changed to Crude Oil |
2000-02-13 | Well Mode changed to Pumping |
2003-10-31 | Well Fluid changed to Crude Oil |
2003-10-31 | Well Mode changed to Suspended |
2009-07-12 | Perforation Treatment Performed - Jet Perforation |
2009-07-13 | Perforation Treatment Performed - Jet Perforation |
2009-07-14 | Perforation Treatment Performed - Fractured |
2009-07-27 | Well Structure changed to Commingled |
2009-08-20 | Perforation Treatment Performed - Jet Perforation |
2009-08-21 | Perforation Treatment Performed - Chemical Squeeze |
2009-09-01 | Perforation Treatment Performed - Fractured |
2009-09-02 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-03-06 | Perforation | 2390.00 | 2392.00 | 13 |
1985-10-29 | Acid Treatment | 2115.50 | 2137.00 | 0 |
1985-11-06 | Perforation | 2076.00 | 2085.00 | 13 |
1985-11-07 | Acid Treatment | 2076.00 | 2085.00 | 0 |
1985-11-14 | Fracture | 2076.00 | 2137.00 | 0 |
1999-11-29 | Perforation | 2201.00 | 2203.50 | 13 |
1999-11-29 | Cement Squeeze | 2201.00 | 2203.50 | 0 |
1999-11-29 | Cement Squeeze | 2115.50 | 2137.00 | 0 |
1999-12-01 | Cement Squeeze | 2076.00 | 2085.00 | 0 |
1999-12-04 | Perforation | 2367.00 | 2371.50 | 13 |
1999-12-06 | Fracture | 2367.00 | 2371.50 | 0 |
1985-03-07 | Acid Treatment | 2390.00 | 2392.00 | 0 |
2009-07-12 | Perforation | 2120.00 | 2122.00 | 6 |
2009-07-12 | Perforation | 2128.00 | 2130.00 | 6 |
2009-07-12 | Perforation | 2132.50 | 2134.00 | 6 |
2009-07-13 | Perforation | 2075.50 | 2080.50 | 6 |
2009-07-13 | Perforation | 2080.50 | 2085.50 | 6 |
2009-07-14 | Fracture | 2075.50 | 2085.50 | 0 |
2009-08-20 | Perforation | 2200.50 | 2203.50 | 17 |
2009-08-21 | Chemical Squeeze | 2200.50 | 2203.50 | 0 |
2009-09-01 | Fracture | 2200.50 | 2203.50 | 0 |
2009-09-02 | Perforation | 2092.00 | 2096.00 | 17 |
1985-03-09 | Fracture | 2390.00 | 2392.00 | 0 |
1985-03-13 | Packing Device Capped w/Cement | 2376.00 | 2384.00 | 0 |
1985-03-13 | Perforation | 2201.00 | 2203.50 | 13 |
1985-03-15 | Fracture | 2201.00 | 2203.50 | 0 |
1985-10-27 | Perforation | 2115.50 | 2117.50 | 13 |
1985-10-27 | Perforation | 2120.50 | 2123.50 | 13 |
1985-10-27 | Perforation | 2127.00 | 2137.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 7455 | 0.0 | 0.0 | 0.0 |
2001 | 8714 | 0.0 | 0.0 | 0.0 |
2002 | 8700 | 0.0 | 0.0 | 0.0 |
2003 | 959 | 0.0 | 0.0 | 0.0 |
For data sources see[5]