If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395051715000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.346556,"lon":-114.678898,"icon":""}]} |
Location: 00/15-17-039-05W5/0 | |
Location Alias: 00/15-17-39-05 W5M | |
Location Alias 2: 00/15-17-039-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 05 | |
Section: 17 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA WILLGR 15-17-39-5 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0464892 | |
License Date: 2014-02-11 | |
License Status: Issued | |
Spud Date: 2014-02-23 | |
Final Drill Date: 2014-03-04 | |
Well Total Depth: 3490.00 m | |
Surface Hole Latitude: 52.346556 | |
Surface Hole Longitude: -114.678898 |
Date | Event |
---|---|
2014-02-11 | Obtained License |
2014-02-25 | Surface Casing Operation Performed |
2014-02-27 | Direction Drilling Operation Performed - Deviate |
2014-03-01 | Direction Drilling Operation Performed - Horizontal |
2014-03-04 | Finished Drilling |
2014-03-04 | Well Log Performed |
2014-03-04 | Well Mode changed to Drilled and Cased |
2014-03-06 | Perforation Treatment Performed - Open-Hole Completion |
2014-03-06 | Production Casing Operation Performed |
2014-03-06 | Rig Released |
2014-03-06 | Well Log Performed |
2014-03-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-03-31 | Well Log Performed |
2014-04-18 | Well Began Production |
2014-04-18 | Well Fluid changed to Crude Oil |
2014-04-18 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-02-23 | Trinidad Drilling Ltd. | 53 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-02-27 | 1560.50 | Deviate (5 - 79 degrees) |
2014-03-01 | 2053.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-03-06 | Open Hole/Barefoot Completion | 3485.00 | 3490.00 | 0 |
2014-03-27 | Multi-Stage Fracture | 2878.70 | 2879.20 | 0 |
2014-03-27 | Multi-Stage Fracture | 2808.70 | 2809.20 | 0 |
2014-03-27 | Multi-Stage Fracture | 2738.80 | 2739.30 | 0 |
2014-03-27 | Multi-Stage Fracture | 2668.90 | 2669.40 | 0 |
2014-03-27 | Multi-Stage Fracture | 2599.40 | 2599.90 | 0 |
2014-03-27 | Multi-Stage Fracture | 2529.80 | 2530.30 | 0 |
2014-03-27 | Multi-Stage Fracture | 2460.00 | 2460.60 | 0 |
2014-03-27 | Multi-Stage Fracture | 2367.90 | 2368.40 | 0 |
2014-03-27 | Multi-Stage Fracture | 2276.70 | 2277.30 | 0 |
2014-03-27 | Multi-Stage Fracture | 2195.80 | 2196.40 | 0 |
2014-03-27 | Multi-Stage Fracture | 3437.40 | 3437.80 | 0 |
2014-03-27 | Multi-Stage Fracture | 3368.10 | 3368.60 | 0 |
2014-03-27 | Multi-Stage Fracture | 3298.60 | 3299.20 | 0 |
2014-03-27 | Multi-Stage Fracture | 3228.70 | 3229.20 | 0 |
2014-03-27 | Multi-Stage Fracture | 3159.10 | 3159.60 | 0 |
2014-03-27 | Multi-Stage Fracture | 3089.10 | 3089.60 | 0 |
2014-03-27 | Multi-Stage Fracture | 3019.10 | 3019.60 | 0 |
2014-03-27 | Multi-Stage Fracture | 2949.10 | 2949.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-03-27 | 2014-03-27 | 1,892 | 2,727 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 79.031 | N/A | |||
RCS Pearl (20/40) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 2.6597 | N/A | ||
Polyurethane resin | 67700-43-0 | 100 | 2.6597 | N/A | ||||
Sand (30/50) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 10.6391 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 10.6391 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 10.6391 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 10.6391 | N/A | ||||
Sand (40/70) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 2.6597 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 2.6597 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 2.6597 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 2.6597 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0217 | N/A | |
Water | 7732-18-5 | 100 | 0.0217 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0679 | N/A | |
Water | 7732-18-5 | 100 | 0.0679 | N/A | ||||
Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 4.7616 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 4.7616 | N/A | ||||
CAN-2056 Gellant (G50 Microtox EC50) | Canyon | Gelling Agent | Ammonium Chloride | 12125-02-9 | 100 | 0.0848 | N/A | |
Hydrotreated Kerosene | 64742-47-8 | 100 | 0.0848 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0848 | N/A | ||||
CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.074 | N/A | |
Water | 7732-18-5 | 100 | 0.074 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-03-22 | 2014-03-23 | Municipal Water | 2850 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 6453 | 0.0 | 0.0 | 0.0 |
2015 | 7869 | 0.0 | 0.0 | 0.0 |
2016 | 8361 | 0.0 | 0.0 | 0.0 |
2017 | 8538 | 0.0 | 0.0 | 0.0 |
2018 | 6971 | 0.0 | 0.0 | 0.0 |
2019 | 5811 | 0.0 | 0.0 | 0.0 |
2020 | 1694 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-03-07 | No Incident Encountered | 0.00 | 0.00 |
2014-04-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]