X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395052116000

Well Details

Well ID: 0395052116000
Loading map...
Location: 00/16-21-039-05W5/0
Location Alias: 00/16-21-39-05 W5M
Location Alias 2: 00/16-21-039-05 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 05
Section: 21
County/Municipality: Clearwater County
Well Name: PSEC WILLGR 16-21-39-5
Operator Name: Prairie Storm Energy Corp.
License Number: 0024649
License Date: 1963-08-09
License Status: Issued
Spud Date: 1963-08-12
Final Drill Date: 1963-08-23
Well Total Depth: 1860.80 m
Surface Hole Latitude: 52.375733
Surface Hole Longitude: -114.652572

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-08-09 Obtained License
1963-08-23 Finished Drilling
1963-08-23 Well Mode changed to Drilled and Cased
1963-08-24 Production Casing Operation Performed
1963-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-03 Perforation Treatment Performed - Fractured
1963-09-03 Perforation Treatment Performed - Jet Perforation
1963-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-04 Perforation Treatment Performed - Fractured
1963-09-18 Well Began Production
1963-09-18 Well Fluid changed to Crude Oil
1963-09-18 Well Mode changed to Flowing
1976-06-26 Well Fluid changed to Crude Oil
1976-06-26 Well Mode changed to Pumping
1976-10-26 Perforation Treatment Performed - Condensate Squeeze
1984-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-08 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-09-03 Perforation 1836.70 1837.90 13
1984-05-08 Perforation 1836.70 1837.90 13
1984-05-08 Perforation 1839.20 1840.90 13
1963-09-03 Perforation 1839.20 1841.00 13
1963-09-03 Acid Treatment 1836.70 1841.00 0
1963-09-03 Fracture 1836.70 1841.00 0
1963-09-03 Acid Treatment 1836.70 1841.00 0
1963-09-04 Acid Treatment 1836.70 1841.00 0
1963-09-04 Fracture 1836.70 1841.00 0
1976-10-26 Condensate Squeeze 1836.70 1841.00 0
1984-05-08 Acid Treatment 1836.70 1841.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1851 0.0 0.0 0.0
1968 2036 0.0 0.0 0.0
1969 1874 0.0 0.0 0.0
1970 4838 0.0 0.0 0.0
1971 6744 0.0 0.0 0.0
1972 8783 0.0 0.0 0.0
1973 8659 0.0 0.0 0.0
1974 7512 0.0 0.0 0.0
1975 7857 0.0 0.0 0.0
1976 5048 0.0 0.0 0.0
1977 8624 0.0 0.0 0.0
1978 7620 0.0 0.0 0.0
1979 5592 0.0 0.0 0.0
1980 6862 0.0 0.0 0.0
1981 7613 0.0 0.0 0.0
1982 4966 0.0 0.0 0.0
1983 8078 0.0 0.0 0.0
1984 7800 0.0 0.0 0.0
1985 7954 0.0 0.0 0.0
1986 5325 0.0 0.0 0.0
1987 1872 0.0 0.0 0.0
1988 4233 0.0 0.0 0.0
1989 5504 0.0 0.0 0.0
1990 6709 0.0 0.0 0.0
1991 6886 0.0 0.0 0.0
1992 6405 0.0 0.0 0.0
1993 6595 0.0 0.0 0.0
1994 7072 0.0 0.0 0.0
1995 7789 0.0 0.0 0.0
1996 7869 0.0 0.0 0.0
1997 8543 0.0 0.0 0.0
1998 8571 0.0 0.0 0.0
1999 7300 0.0 0.0 0.0
2000 8448 0.0 0.0 0.0
2001 8481 0.0 0.0 0.0
2002 8735 0.0 0.0 0.0
2003 6383 0.0 0.0 0.0
2004 8675 0.0 0.0 0.0
2005 8639 0.0 0.0 0.0
2006 7283 0.0 0.0 0.0
2007 7919 0.0 0.0 0.0
2008 8747 0.0 0.0 0.0
2009 8567 0.0 0.0 0.0
2010 8486 0.0 0.0 0.0
2011 8328 0.0 0.0 0.0
2012 7546 0.0 0.0 0.0
2013 8183 0.0 0.0 0.0
2014 8616 0.0 0.0 0.0
2015 8553 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8679 0.0 0.0 0.0
2019 8006 0.0 0.0 0.0
2020 1896 0.0 0.0 0.0

For data sources see[5]

References