X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395053506003

Well Details

Well ID: 0395053506003
Loading map...
Location: 00/06-35-039-05W5/3
Location Alias: 00/06-35-39-05 W5M
Location Alias 2: 00/06-35-039-05 W5/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 05
Section: 35
County/Municipality: Clearwater County
Well Name: TANDEM WILLGR 6-35-39-5
Operator Name: Incipient Exploration Ltd.
License Number: 0187011
License Date: 1996-03-27
License Status: Suspension
Spud Date: 1996-05-03
Final Drill Date: 1996-05-15
Well Total Depth: 2400.00 m
Surface Hole Latitude: 52.397805
Surface Hole Longitude: -114.617597

For data sources see[1][2]

Well History

Date Event
1996-03-27 Obtained License
1996-05-05 Surface Casing Operation Performed
1996-05-15 Finished Drilling
1996-05-15 Well Log Performed
1996-05-15 Well Mode changed to Drilled and Cased
1996-05-17 Production Casing Operation Performed
1996-05-18 Rig Released
1996-05-27 Perforation Treatment Performed - Jet Perforation
1996-05-29 Perforation Treatment Performed - Fractured
1996-06-13 Perforation Treatment Performed - Chemical Squeeze
2010-05-27 Well Log Performed
2010-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-28 Perforation Treatment Performed - Jet Perforation
2010-05-28 Plug Back Performed
2010-05-28 Well Log Performed
2010-11-05 Perforation Treatment Performed - Fractured
2010-12-03 Well Began Production
2010-12-03 Well Fluid changed to Gas
2010-12-03 Well Mode changed to Flowing
2012-02-01 Well Fluid changed to Gas
2012-02-01 Well Mode changed to Suspended
2012-12-01 Well Fluid changed to Gas
2012-12-01 Well Mode changed to Flowing
2015-06-01 Well Fluid changed to Gas
2015-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-05-27 Perforation 2265.00 2269.00 57
2010-11-05 Fracture 570.50 571.50 0
2010-11-05 Fracture 583.00 584.00 0
2010-11-05 Fracture 612.00 613.00 0
2010-11-05 Fracture 765.00 766.00 0
2010-11-05 Fracture 826.00 827.00 0
1996-05-29 Fracture 2265.00 2269.00 0
1996-06-13 Chemical Squeeze 2265.00 2269.00 0
2010-05-28 Perforation 612.00 613.00 17
2010-05-28 Perforation 583.00 584.00 17
2010-05-28 Perforation 570.50 571.50 17
2010-05-28 Perforation 765.00 766.00 17
2010-05-28 Packing Device Capped w/Cement 2252.00 2260.00 0
2010-05-28 Perforation 826.00 827.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 678 0.0 0.0 0.0
2011 8696 0.0 0.0 0.0
2012 1440 0.0 0.0 0.0
2013 8515 0.0 0.0 0.0
2014 6714 0.0 0.0 0.0
2015 3527 0.0 0.0 0.0

For data sources see[5]

References