X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395072204000

Well Details

Well ID: 0395072204000
Loading map...
Location: 00/04-22-039-07W5/0
Location Alias: 00/04-22-39-07 W5M
Location Alias 2: 00/04-22-039-07 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 07
Section: 22
County/Municipality: Rocky Mountain House
Well Name: CNRL ET AL FERRIER 4-22-39-7
Operator Name: Canadian Natural Resources Limited
License Number: 0028215
License Date: 1965-05-14
License Status: Issued
Spud Date: 1965-05-19
Final Drill Date: 1965-06-07
Well Total Depth: 2398.80 m
Surface Hole Latitude: 52.364904
Surface Hole Longitude: -114.934160

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-05-14 Obtained License
1965-06-07 Finished Drilling
1965-06-07 Well Mode changed to Drilled and Cased
1965-06-08 Drill Stem Test Performed
1965-06-10 Production Casing Operation Performed
1965-06-15 Perforation Treatment Performed - Jet Perforation
1965-06-16 Perforation Treatment Performed - Acid Wash - No Pressure
1965-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-07-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-07-03 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-07-03 Perforation Treatment Performed - Acid Wash - No Pressure
1965-07-03 Perforation Treatment Performed - Fractured
1965-07-06 Well Began Production
1965-07-06 Well Fluid changed to Crude Oil
1965-07-06 Well Mode changed to Flowing
1986-08-21 Well Began Injection
1986-08-21 Well Fluid changed to Water
1986-08-21 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-06-15 Perforation 2382.60 2384.50 13
1965-06-16 Acid Wash 2382.60 2384.50 0
1965-06-18 Acid Treatment 2382.60 2384.50 0
1965-07-02 Packing Device Capped w/Cement 2316.50 2316.50 0
1965-07-03 Hydra Jet Perforation 2077.20 2077.20 0
1965-07-03 Hydra Jet Perforation 2077.50 2077.50 0
1965-07-03 Acid Wash 2077.20 2077.50 0
1965-07-03 Fracture 2077.20 2077.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4264 0.0 0.0 0.0
1968 2845 0.0 0.0 0.0
1969 5286 0.0 0.0 0.0
1970 4396 0.0 0.0 0.0
1971 7021 0.0 0.0 0.0
1972 7919 0.0 0.0 0.0
1973 6838 0.0 0.0 0.0
1974 7215 0.0 0.0 0.0
1975 6635 0.0 0.0 0.0
1976 6240 0.0 0.0 0.0
1977 7319 0.0 0.0 0.0
1978 3174 0.0 0.0 0.0
1980 1354 0.0 0.0 0.0
1981 2815 0.0 0.0 0.0
1982 1013 0.0 0.0 0.0
1983 192 0.0 0.0 0.0
1985 1056 0.0 0.0 0.0
1986 1391 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References