If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395080816000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.334571,"lon":-115.108619,"icon":""}]} |
Location: 00/16-08-039-08W5/0 | |
Location Alias: 00/16-08-39-08 W5M | |
Location Alias 2: 00/16-08-039-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 08 | |
Section: 08 | |
County/Municipality: Clearwater County | |
Well Name: PETRUS HZ FERRIER 16-8-39-8 | |
Operator Name: Petrus Resources Corp. | |
License Number: 0481083 | |
License Date: 2016-11-01 | |
License Status: Issued | |
Spud Date: 2017-03-12 | |
Final Drill Date: 2017-03-21 | |
Well Total Depth: 3893.00 m | |
Surface Hole Latitude: 52.334571 | |
Surface Hole Longitude: -115.108619 |
Date | Event |
---|---|
2016-11-01 | Obtained License |
2017-03-14 | Surface Casing Operation Performed |
2017-03-16 | Direction Drilling Operation Performed - Deviate |
2017-03-17 | Direction Drilling Operation Performed - Horizontal |
2017-03-21 | Finished Drilling |
2017-03-21 | Well Log Performed |
2017-03-21 | Well Mode changed to Drilled and Cased |
2017-03-23 | Production Casing Operation Performed |
2017-03-23 | Rig Released |
2017-03-29 | Perforation Treatment Performed - Jet Perforation |
2017-03-29 | Well Log Performed |
2017-05-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-05-04 | Perforation Treatment Performed - Jet Perforation |
2017-05-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-05-26 | Well Fluid changed to Gas |
2017-05-26 | Well Mode changed to Testing |
2017-06-01 | Well Began Production |
2017-06-01 | Well Fluid changed to Gas |
2017-06-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-03-12 | Horizon Drilling Inc. | 47 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-03-16 | 1411.60 | Deviate (5 - 79 degrees) |
2017-03-17 | 2411.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-03-29 | Perforation | 3874.20 | 3874.80 | 8 |
2017-05-03 | Multi-Stage Fracture | 3504.20 | 3506.10 | 0 |
2017-05-03 | Multi-Stage Fracture | 3459.00 | 3460.90 | 0 |
2017-05-04 | Multi-Stage Fracture | 3413.50 | 3415.40 | 0 |
2017-05-04 | Multi-Stage Fracture | 3368.50 | 3370.40 | 0 |
2017-05-04 | Multi-Stage Fracture | 3324.40 | 3326.30 | 0 |
2017-05-04 | Multi-Stage Fracture | 3278.80 | 3280.80 | 0 |
2017-05-04 | Multi-Stage Fracture | 3234.60 | 3236.50 | 0 |
2017-05-04 | Multi-Stage Fracture | 3189.50 | 3191.40 | 0 |
2017-05-04 | Multi-Stage Fracture | 3144.50 | 3146.40 | 0 |
2017-05-04 | Multi-Stage Fracture | 3100.70 | 3102.80 | 0 |
2017-05-03 | Multi-Stage Fracture | 3858.20 | 3860.20 | 0 |
2017-05-04 | Multi-Stage Fracture | 3055.70 | 3057.60 | 0 |
2017-05-04 | Multi-Stage Fracture | 3010.90 | 3012.80 | 0 |
2017-05-04 | Multi-Stage Fracture | 2967.00 | 2968.90 | 0 |
2017-05-04 | Multi-Stage Fracture | 2921.50 | 2923.40 | 0 |
2017-05-04 | Multi-Stage Fracture | 2876.10 | 2878.00 | 0 |
2017-05-04 | Multi-Stage Fracture | 2831.10 | 2833.00 | 0 |
2017-05-04 | Multi-Stage Fracture | 2785.60 | 2787.60 | 0 |
2017-05-04 | Multi-Stage Fracture | 2741.30 | 2743.30 | 0 |
2017-05-04 | Multi-Stage Fracture | 2696.10 | 2698.00 | 0 |
2017-05-04 | Perforation | 2650.60 | 2652.20 | 8 |
2017-05-03 | Multi-Stage Fracture | 3816.30 | 3818.20 | 0 |
2017-05-04 | Multi-Stage Fracture | 2640.00 | 2640.10 | 0 |
2017-05-04 | Multi-Stage Fracture | 2605.70 | 2607.70 | 0 |
2017-05-04 | Multi-Stage Fracture | 2561.10 | 2563.00 | 0 |
2017-05-04 | Multi-Stage Fracture | 2516.00 | 2517.90 | 0 |
2017-05-04 | Multi-Stage Fracture | 2471.10 | 2473.10 | 0 |
2017-05-03 | Multi-Stage Fracture | 3773.80 | 3775.80 | 0 |
2017-05-03 | Multi-Stage Fracture | 3730.30 | 3732.20 | 0 |
2017-05-03 | Multi-Stage Fracture | 3685.10 | 3687.00 | 0 |
2017-05-03 | Multi-Stage Fracture | 3640.10 | 3642.00 | 0 |
2017-05-03 | Multi-Stage Fracture | 3594.60 | 3596.80 | 0 |
2017-05-03 | Multi-Stage Fracture | 3549.60 | 3551.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-05-03 | 2017-05-04 | 2,267 | 3,344 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | Not Available | 100 | 14.3727 | N/A | |||
Water | 7732-18-5 | 100 | 71.0989 | N/A | ||||
20/40 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 10.7455 | N/A | ||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 3.0837 | N/A | ||
15% HCL Acid | Step Energy Services | Acid | Hydrochloric Acid | 7647-01-0 | 100 | 0.3823 | N/A | |
Water | 7732-18-5 | 100 | 0.3823 | N/A | ||||
Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0073 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0073 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0073 | N/A | ||||
SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0699 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0699 | N/A | ||||
SCI-9 (Corrosion Inhibitor) | Step Energy Services | Corrosion Inhibitor | Acetophenone. thiourea. formaldehyde polymer | 68527-49-1 | 100 | 0.0019 | N/A | |
Butyl cellosolve | 111-76-2 | 100 | 0.0019 | N/A | ||||
Cinnamaldehyde | 104-55-2 | 100 | 0.0019 | N/A | ||||
Ethylene Glycol | 107-21-1 | 100 | 0.0019 | N/A | ||||
Formic Acid | 64-18-6 | 100 | 0.0019 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0019 | N/A | ||||
Polyether | Not Available | 100 | 0.0019 | N/A | ||||
SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.0766 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0766 | N/A | ||||
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0766 | N/A | ||||
SIR-2 (Iron Reducer) | Step Energy Services | Iron Control | Copper Chloride (CuCl2) | 7447-39-4 | 100 | 0.0019 | N/A | |
Ethanol. 2-amino- | 141-43-5 | 100 | 0.0019 | N/A | ||||
Ethanol. 2-mecapto | 60-24-2 | 100 | 0.0019 | N/A | ||||
SSI-1 (Scale Inhibitor) | Step Energy Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0176 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0176 | N/A | ||||
SAS-4 (Anti-Sludge) | Step Energy Services | Surfactant | 1.1' - Oxybisbenzene. tetrapropylene dervis. sulfonated | 119345-03-8 | 100 | 0.0019 | N/A | |
Alkylbenzene sulfonic acid | 27176-87-0 | 100 | 0.0019 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0019 | N/A | ||||
Xylene | 1330-20-7 | 100 | 0.0019 | N/A | ||||
SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.1392 | N/A | |
Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.1392 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.1392 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.1392 | N/A | ||||
Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.1392 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.1392 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1392 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-03-29 | 2017-03-30 | Surface Water - River | 4316 |
2017-05-04 | 2017-05-04 | Central Water Distribution Facility | 486 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 5664 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-03-23 | No Incident Encountered | 0.00 | 0.00 |
2017-05-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]