X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395080908000

Well Details

Well ID: 0395080908000
Loading map...
Location: 00/08-09-039-08W5/0
Location Alias: 00/08-09-39-08 W5M
Location Alias 2: 00/08-09-039-08 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 08
Section: 09
County/Municipality: Clearwater County
Well Name: PETRUS FERRIER 8-9-39-8
Operator Name: Petrus Resources Corp.
License Number: 0108501
License Date: 1984-07-31
License Status: Abandoned
Spud Date: 1984-08-01
Final Drill Date: 1984-08-24
Well Total Depth: 2905.00 m
Surface Hole Latitude: 52.340818
Surface Hole Longitude: -115.086625

For data sources see[1][2]

Well History

Date Event
1984-07-31 Obtained License
1984-08-03 Surface Casing Operation Performed
1984-08-05 Lost Circulation Occurred
1984-08-24 Finished Drilling
1984-08-24 Well Log Performed
1984-08-25 Well Log Performed
1984-08-26 Lost Circulation Occurred
1984-08-30 Production Casing Operation Performed
1984-09-01 Rig Released
1984-09-19 Well Log Performed
1984-09-20 Perforation Treatment Performed - Jet Perforation
1984-09-20 Well Log Performed
1984-09-21 Perforation Treatment Performed - Fractured
1984-09-29 Well Mode changed to Drilled and Cased
1984-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-30 Plug Back Performed
1984-09-30 Well Log Performed
1984-09-30 Well Mode changed to Abandoned Zone
1984-10-05 Perforation Treatment Performed - Jet Perforation
1984-10-06 Perforation Treatment Performed - Fractured
1984-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-13 Plug Back Performed
1984-10-13 Well Log Performed
1984-10-15 Perforation Treatment Performed - Jet Perforation
1984-10-16 Perforation Treatment Performed - Fractured
1984-10-16 Perforation Treatment Performed - Jet Perforation
1984-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-25 Perforation Treatment Performed - Jet Perforation
1984-10-25 Plug Back Performed
1984-10-25 Well Log Performed
1984-10-29 Well Log Performed
1984-10-30 Perforation Treatment Performed - Remedial Casing
1984-10-31 Well Log Performed
1984-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-02 Perforation Treatment Performed - Remedial Casing
1984-11-08 Perforation Treatment Performed - Jet Perforation
1984-11-09 Perforation Treatment Performed - Fractured
1985-11-19 Well Log Performed
2000-07-29 Well Log Performed
2000-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-31 Perforation Treatment Performed - Jet Perforation
2001-02-05 Well Log Performed
2001-02-06 Perforation Treatment Performed - Jet Perforation
2001-02-06 Well Log Performed
2001-02-08 Perforation Treatment Performed - Fractured
2008-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-27 Plug Back Performed
2008-11-28 Well Log Performed
2008-11-29 Perforation Treatment Performed - Jet Perforation
2008-11-29 Perforation Treatment Performed - Remedial Casing
2008-11-29 Well Log Performed
2008-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-30 Perforation Treatment Performed - Jet Perforation
2008-11-30 Perforation Treatment Performed - Remedial Casing
2008-11-30 Well Log Performed
2008-12-02 Well Log Performed
2008-12-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-20 Perforation 2839.00 2844.50 13
1984-10-16 Fracture 2726.00 2739.00 0
1984-10-25 Packing Device Capped w/Cement 2707.00 2715.00 0
1984-10-25 Perforation 2269.00 2269.00 0
1984-10-25 Perforation 2219.00 2219.00 0
1984-10-30 Remedial Casing Cementing 2269.00 2269.00 0
1984-11-02 Acid Treatment 2219.00 2219.00 0
1984-11-02 Remedial Casing Cementing 2219.00 2219.00 0
1984-11-08 Perforation 2240.00 2241.00 13
1984-11-08 Perforation 2242.00 2243.00 13
1984-11-09 Fracture 2240.00 2243.00 0
1984-09-20 Perforation 2851.50 2855.00 13
2000-07-31 Perforation 2240.00 2243.00 17
2000-07-31 Acid Treatment 2240.00 2243.00 0
2001-02-06 Perforation 2281.00 2282.50 17
2001-02-08 Fracture 2281.00 2282.50 0
2008-11-27 Packing Device Capped w/Cement 2194.00 2275.00 0
2008-11-29 Perforation 797.00 798.00 13
2008-11-29 Remedial Casing Cementing 797.00 798.00 0
2008-11-30 Perforation 600.00 601.00 15
2008-11-30 Packing Device Capped w/Cement 569.00 590.00 0
2008-11-30 Remedial Casing Cementing 600.00 601.00 0
1984-09-21 Fracture 2839.00 2855.00 0
1984-09-30 Packing Device Capped w/Cement 2822.00 2830.00 0
1984-10-05 Perforation 2779.50 2780.50 13
1984-10-06 Fracture 2779.50 2780.50 0
1984-10-13 Packing Device Capped w/Cement 2757.00 2765.00 0
1984-10-15 Perforation 2732.00 2739.00 7
1984-10-16 Perforation 2726.00 2732.00 7

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-08-05 Lost Circulation 566.00 2758.00
1984-08-26 Lost Circulation 2905.00 2905.00

For data sources see[5]

References