If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395082709030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.388063,"lon":-115.089187,"icon":""}]} |
Location: 03/09-27-039-08W5/0 | |
Location Alias: 03/09-27-39-08 W5M | |
Location Alias 2: 03/09-27-039-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 08 | |
Section: 27 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ FERRIER 9-27-39-8 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0495352 | |
License Date: 2019-08-06 | |
License Status: Issued | |
Spud Date: 2019-09-10 | |
Final Drill Date: 2019-09-18 | |
Well Total Depth: 4084.00 m | |
Surface Hole Latitude: 52.388063 | |
Surface Hole Longitude: -115.089187 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-09-10 | Stampede Drilling A Division Of Matrix Energy Technologi | 5 | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2019-09-11 | 704.50 | Deviate (5 - 79 degrees) |
2019-09-16 | 2602.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-09-25 | Multi-Stage Fracture | 4043.00 | 4043.10 | 0 |
2019-09-25 | Multi-Stage Fracture | 3830.10 | 3830.20 | 0 |
2019-09-25 | Multi-Stage Fracture | 3806.40 | 3806.50 | 0 |
2019-09-25 | Multi-Stage Fracture | 3782.60 | 3782.70 | 0 |
2019-09-25 | Multi-Stage Fracture | 3759.00 | 3759.10 | 0 |
2019-09-25 | Multi-Stage Fracture | 3735.30 | 3735.40 | 0 |
2019-09-25 | Multi-Stage Fracture | 3711.60 | 3711.70 | 0 |
2019-09-25 | Multi-Stage Fracture | 3687.80 | 3687.90 | 0 |
2019-09-25 | Multi-Stage Fracture | 3664.10 | 3664.20 | 0 |
2019-09-25 | Multi-Stage Fracture | 3640.50 | 3640.60 | 0 |
2019-09-25 | Multi-Stage Fracture | 3617.00 | 3617.10 | 0 |
2019-09-25 | Multi-Stage Fracture | 4019.40 | 4019.50 | 0 |
2019-09-25 | Multi-Stage Fracture | 3593.30 | 3593.40 | 0 |
2019-09-25 | Multi-Stage Fracture | 3569.70 | 3569.80 | 0 |
2019-09-25 | Multi-Stage Fracture | 3546.10 | 3546.20 | 0 |
2019-09-25 | Multi-Stage Fracture | 3522.40 | 3522.50 | 0 |
2019-09-25 | Multi-Stage Fracture | 3498.90 | 3499.00 | 0 |
2019-09-25 | Multi-Stage Fracture | 3475.20 | 3475.30 | 0 |
2019-09-25 | Multi-Stage Fracture | 3451.50 | 3451.60 | 0 |
2019-09-25 | Multi-Stage Fracture | 3427.80 | 3427.90 | 0 |
2019-09-25 | Multi-Stage Fracture | 3404.00 | 3404.10 | 0 |
2019-09-25 | Multi-Stage Fracture | 3380.30 | 3380.40 | 0 |
2019-09-25 | Multi-Stage Fracture | 3995.80 | 3995.90 | 0 |
2019-09-25 | Multi-Stage Fracture | 3356.60 | 3356.70 | 0 |
2019-09-25 | Multi-Stage Fracture | 3332.80 | 3332.90 | 0 |
2019-09-26 | Multi-Stage Fracture | 3309.10 | 3309.20 | 0 |
2019-09-26 | Multi-Stage Fracture | 3285.40 | 3285.50 | 0 |
2019-09-26 | Multi-Stage Fracture | 3261.70 | 3261.80 | 0 |
2019-09-26 | Multi-Stage Fracture | 3238.00 | 3238.10 | 0 |
2019-09-26 | Multi-Stage Fracture | 3214.30 | 3214.40 | 0 |
2019-09-26 | Multi-Stage Fracture | 3190.60 | 3190.70 | 0 |
2019-09-26 | Multi-Stage Fracture | 3166.90 | 3167.00 | 0 |
2019-09-26 | Multi-Stage Fracture | 3143.20 | 3143.30 | 0 |
2019-09-25 | Multi-Stage Fracture | 3972.10 | 3972.20 | 0 |
2019-09-26 | Multi-Stage Fracture | 3119.60 | 3119.70 | 0 |
2019-09-26 | Multi-Stage Fracture | 3096.00 | 3096.10 | 0 |
2019-09-26 | Multi-Stage Fracture | 3072.30 | 3072.40 | 0 |
2019-09-26 | Multi-Stage Fracture | 3048.60 | 3048.70 | 0 |
2019-09-26 | Multi-Stage Fracture | 3024.90 | 3025.00 | 0 |
2019-09-26 | Multi-Stage Fracture | 3001.30 | 3001.40 | 0 |
2019-09-26 | Multi-Stage Fracture | 2977.50 | 2977.60 | 0 |
2019-09-26 | Multi-Stage Fracture | 2953.80 | 2953.90 | 0 |
2019-09-26 | Multi-Stage Fracture | 2930.20 | 2930.30 | 0 |
2019-09-26 | Multi-Stage Fracture | 2906.50 | 2906.60 | 0 |
2019-09-25 | Multi-Stage Fracture | 3948.40 | 3948.50 | 0 |
2019-09-26 | Multi-Stage Fracture | 2882.70 | 2882.80 | 0 |
2019-09-26 | Multi-Stage Fracture | 2859.10 | 2859.20 | 0 |
2019-09-26 | Multi-Stage Fracture | 2835.30 | 2835.40 | 0 |
2019-09-26 | Multi-Stage Fracture | 2811.60 | 2811.70 | 0 |
2019-09-26 | Multi-Stage Fracture | 2788.00 | 2788.10 | 0 |
2019-09-26 | Multi-Stage Fracture | 2764.20 | 2764.30 | 0 |
2019-09-26 | Multi-Stage Fracture | 2740.50 | 2740.60 | 0 |
2019-09-26 | Multi-Stage Fracture | 2716.90 | 2717.00 | 0 |
2019-09-25 | Multi-Stage Fracture | 3924.70 | 3924.80 | 0 |
2019-09-25 | Multi-Stage Fracture | 3901.00 | 3901.10 | 0 |
2019-09-25 | Multi-Stage Fracture | 3877.40 | 3877.50 | 0 |
2019-09-25 | Multi-Stage Fracture | 3853.60 | 3853.70 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-09-25 | 2019-09-26 | 2,235 | 5,722 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 93.1049 | N/A | |||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 6.6555 | N/A | ||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.3626 | N/A | ||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0786 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0786 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0498 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0498 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0632 | N/A | |
Methanol | 67-56-1 | 100 | 0.0632 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0632 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-09-25 | 2019-09-26 | Surface Water - River | 4138 |
2019-08-30 | 2019-09-09 | Oilfield Produced Water | 715 |
2019-09-01 | 2019-09-05 | Oilfield Produced Water | 255 |
2019-08-30 | 2019-09-26 | Oilfield Produced Water | 1142 |
2019-09-09 | 2019-09-09 | Oilfield Produced Water | 12 |
2019-08-30 | 2019-08-31 | Oilfield Produced Water | 46 |
2019-09-01 | 2019-09-05 | Oilfield Produced Water | 60 |
2019-08-31 | 2019-09-25 | Oilfield Produced Water | 119 |
2019-09-01 | 2019-09-05 | Oilfield Produced Water | 893 |
2019-08-31 | 2019-09-08 | Oilfield Produced Water | 651 |
2019-09-09 | 2019-09-26 | Oilfield Produced Water | 2192 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 2067 | 0.0 | 0.0 | 0.0 |
2020 | 2163 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-09-20 | No Incident Encountered | 0.00 | 0.00 |
2019-10-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]