If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395082902000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.379182,"lon":-115.114552,"icon":""}]} |
Location: 00/02-29-039-08W5/0 | |
Location Alias: 00/02-29-39-08 W5M | |
Location Alias 2: 00/02-29-039-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 08 | |
Section: 29 | |
County/Municipality: Clearwater County | |
Well Name: WESTROCK FERRIER 2-29-39-8 | |
Operator Name: Enerplus Corporation | |
License Number: 0077295 | |
License Date: 1979-08-03 | |
License Status: Issued | |
Spud Date: 1980-08-17 | |
Final Drill Date: 1980-10-02 | |
Well Total Depth: 2927.00 m | |
Surface Hole Latitude: 52.379182 | |
Surface Hole Longitude: -115.114552 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-08-03 | Obtained License |
1980-08-17 | Lost Circulation Occurred |
1980-10-02 | Finished Drilling |
1980-10-02 | Well Log Performed |
1980-10-02 | Well Mode changed to Drilled and Cased |
1980-10-05 | Production Casing Operation Performed |
1980-10-25 | Perforation Treatment Performed - Jet Perforation |
1980-10-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-10-31 | Perforation Treatment Performed - Jet Perforation |
1980-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-11-05 | Perforation Treatment Performed - Jet Perforation |
1980-11-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-11-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-11-08 | Perforation Treatment Performed - Jet Perforation |
1980-11-09 | Perforation Treatment Performed - Fractured |
1980-11-12 | Well Began Production |
1980-11-12 | Well Fluid changed to Crude Oil |
1980-11-12 | Well Mode changed to Flowing |
1981-03-01 | Well Fluid changed to Crude Oil |
1981-03-01 | Well Mode changed to Suspended |
1982-10-23 | Well Fluid changed to Crude Oil |
1982-10-23 | Well Mode changed to Flowing |
2012-10-09 | Well Fluid changed to Crude Oil |
2012-10-09 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-10-25 | Perforation | 2890.00 | 2892.00 | 7 |
1980-11-04 | Packing Device Capped w/Cement | 2822.00 | 2833.00 | 0 |
1980-11-05 | Perforation | 2741.00 | 2744.50 | 7 |
1980-11-06 | Acid Treatment | 2741.00 | 2744.50 | 0 |
1980-11-07 | Packing Device Capped w/Cement | 2725.00 | 2733.00 | 0 |
1980-11-08 | Perforation | 2238.50 | 2240.00 | 7 |
1980-11-08 | Perforation | 2240.50 | 2244.00 | 7 |
1980-11-09 | Fracture | 2238.50 | 2244.00 | 0 |
1980-10-25 | Perforation | 2893.00 | 2894.00 | 7 |
1980-10-25 | Perforation | 2895.00 | 2897.00 | 7 |
1980-10-26 | Acid Treatment | 2890.00 | 2897.00 | 0 |
1980-10-28 | Acid Treatment | 2890.00 | 2897.00 | 0 |
1980-10-30 | Packing Device Capped w/Cement | 2877.00 | 2885.00 | 0 |
1980-10-31 | Perforation | 2842.00 | 2844.50 | 7 |
1980-10-31 | Perforation | 2847.50 | 2850.00 | 7 |
1980-11-02 | Acid Treatment | 2842.00 | 2850.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 287 | 0.0 | 0.0 | 0.0 |
1982 | 1695 | 0.0 | 0.0 | 0.0 |
1983 | 8528 | 0.0 | 0.0 | 0.0 |
1984 | 8230 | 0.0 | 0.0 | 0.0 |
1985 | 8525 | 0.0 | 0.0 | 0.0 |
1986 | 8351 | 0.0 | 0.0 | 0.0 |
1987 | 8182 | 0.0 | 0.0 | 0.0 |
1988 | 8561 | 0.0 | 0.0 | 0.0 |
1989 | 8577 | 0.0 | 0.0 | 0.0 |
1990 | 7990 | 0.0 | 0.0 | 0.0 |
1991 | 7923 | 0.0 | 0.0 | 0.0 |
1992 | 7898 | 0.0 | 0.0 | 0.0 |
1993 | 8141 | 0.0 | 0.0 | 0.0 |
1994 | 8160 | 0.0 | 0.0 | 0.0 |
1995 | 8580 | 0.0 | 0.0 | 0.0 |
1996 | 8565 | 0.0 | 0.0 | 0.0 |
1997 | 8592 | 0.0 | 0.0 | 0.0 |
1998 | 8367 | 0.0 | 0.0 | 0.0 |
1999 | 8501 | 0.0 | 0.0 | 0.0 |
2000 | 7258 | 0.0 | 0.0 | 0.0 |
2001 | 7990 | 0.0 | 0.0 | 0.0 |
2002 | 7295 | 0.0 | 0.0 | 0.0 |
2003 | 8584 | 0.0 | 0.0 | 0.0 |
2004 | 8715 | 0.0 | 0.0 | 0.0 |
2005 | 8544 | 0.0 | 0.0 | 0.0 |
2006 | 8486 | 0.0 | 0.0 | 0.0 |
2007 | 8556 | 0.0 | 0.0 | 0.0 |
2008 | 8252 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8351 | 0.0 | 0.0 | 0.0 |
2011 | 8147 | 0.0 | 0.0 | 0.0 |
2012 | 8172 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 7906 | 0.0 | 0.0 | 0.0 |
2015 | 4709 | 0.0 | 0.0 | 0.0 |
2016 | 6287 | 0.0 | 0.0 | 0.0 |
2017 | 6840 | 0.0 | 0.0 | 0.0 |
2018 | 6912 | 0.0 | 0.0 | 0.0 |
2019 | 8208 | 0.0 | 0.0 | 0.0 |
2020 | 2039 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-08-17 | Lost Circulation | 1.00 | 1.00 |
For data sources see[6]