If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0395083013002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.389006,"lon":-115.147334,"icon":""}]} |
| Location: 00/13-30-039-08W5/2 | |
| Location Alias: 00/13-30-39-08 W5M | |
| Location Alias 2: 00/13-30-039-08 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 5 | |
| Range: 08 | |
| Section: 30 | |
| County/Municipality: Clearwater County | |
| Well Name: KAISER ET AL FERRIER 13-30-39-8 | |
| Operator Name: Enerplus Corporation | |
| License Number: 0184894 | |
| License Date: 1996-01-23 | |
| License Status: Issued | |
| Spud Date: 1996-02-11 | |
| Final Drill Date: 1996-04-16 | |
| Well Total Depth: 3004.00 m | |
| Surface Hole Latitude: 52.389006 | |
| Surface Hole Longitude: -115.147334 |
| Date | Event |
|---|---|
| 1996-01-23 | Obtained License |
| 1996-02-17 | Surface Casing Operation Performed |
| 1996-02-24 | Lost Circulation Occurred |
| 1996-03-06 | Lost Circulation Occurred |
| 1996-03-11 | Lost Circulation Occurred |
| 1996-03-14 | Lost Circulation Occurred |
| 1996-03-27 | Intermediate Casing Operation Performed |
| 1996-04-16 | Finished Drilling |
| 1996-04-16 | Well Log Performed |
| 1996-04-16 | Well Mode changed to Drilled and Cased |
| 1996-04-19 | Drill Stem Test Performed |
| 1996-04-22 | Liner Casing Operation Performed |
| 1996-04-24 | Rig Released |
| 1996-07-16 | Perforation Treatment Performed - Jet Perforation |
| 1996-07-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-07-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-07-18 | Perforation Treatment Performed - Jet Perforation |
| 1996-07-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-07-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-05-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-05-27 | Perforation Treatment Performed - Jet Perforation |
| 1997-05-27 | Plug Back Performed |
| 1997-05-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-06-18 | Perforation Treatment Performed - Fractured |
| 2000-05-15 | Perforation Treatment Performed - Jet Perforation |
| 2000-05-15 | Well Log Performed |
| 2000-05-15 | Well Mode changed to Drilled and Cased |
| 2000-05-18 | Perforation Treatment Performed - Fractured |
| 2001-03-01 | Well Began Production |
| 2001-03-01 | Well Fluid changed to Gas |
| 2001-03-01 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1996-07-16 | Perforation | 2957.00 | 2962.00 | 13 |
| 1997-05-29 | Acid Treatment | 2861.00 | 2876.00 | 0 |
| 1997-06-18 | Fracture | 2861.00 | 2876.00 | 0 |
| 2000-05-15 | Perforation | 2788.00 | 2791.00 | 7 |
| 2000-05-18 | Fracture | 2788.00 | 2791.00 | 0 |
| 1996-07-17 | Acid Treatment | 2957.00 | 2962.00 | 0 |
| 1996-07-18 | Perforation | 2968.50 | 2970.00 | 13 |
| 1996-07-18 | Acid Treatment | 2957.00 | 2970.00 | 0 |
| 1996-07-27 | Acid Treatment | 2957.00 | 2970.00 | 0 |
| 1996-07-29 | Acid Treatment | 2957.00 | 2970.00 | 0 |
| 1997-05-27 | Packing Device Capped w/Cement | 2922.00 | 2930.00 | 0 |
| 1997-05-27 | Perforation | 2861.00 | 2862.50 | 13 |
| 1997-05-27 | Perforation | 2874.50 | 2876.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2001 | 6424 | 0.0 | 0.0 | 0.0 |
| 2002 | 8044 | 0.0 | 0.0 | 0.0 |
| 2003 | 8589 | 0.0 | 0.0 | 0.0 |
| 2004 | 8726 | 0.0 | 0.0 | 0.0 |
| 2005 | 8663 | 0.0 | 0.0 | 0.0 |
| 2006 | 8411 | 0.0 | 0.0 | 0.0 |
| 2007 | 8438 | 0.0 | 0.0 | 0.0 |
| 2008 | 8567 | 0.0 | 0.0 | 0.0 |
| 2009 | 8458 | 0.0 | 0.0 | 0.0 |
| 2010 | 7943 | 0.0 | 0.0 | 0.0 |
| 2011 | 8423 | 0.0 | 0.0 | 0.0 |
| 2012 | 8779 | 0.0 | 0.0 | 0.0 |
| 2013 | 8077 | 0.0 | 0.0 | 0.0 |
| 2014 | 6204 | 0.0 | 0.0 | 0.0 |
| 2015 | 4853 | 0.0 | 0.0 | 0.0 |
| 2016 | 4895 | 0.0 | 0.0 | 0.0 |
| 2017 | 8711 | 0.0 | 0.0 | 0.0 |
| 2018 | 5711 | 0.0 | 0.0 | 0.0 |
| 2019 | 6048 | 0.0 | 0.0 | 0.0 |
| 2020 | 1512 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1996-02-24 | Lost Circulation | 1280.00 | 1507.00 |
| 1996-03-06 | Lost Circulation | 1775.00 | 2007.00 |
| 1996-03-11 | Lost Circulation | 2484.00 | 2518.00 |
| 1996-03-14 | Lost Circulation | 2554.00 | 2554.00 |
For data sources see[6]