If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395083013002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/13-30-039-08W5/2 | |
Location Alias: 00/13-30-39-08 W5M | |
Location Alias 2: 00/13-30-039-08 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 08 | |
Section: 30 | |
County/Municipality: Clearwater County | |
Well Name: KAISER ET AL FERRIER 13-30-39-8 | |
Operator Name: Enerplus Corporation | |
License Number: 0184894 | |
License Date: 1996-01-23 | |
License Status: Issued | |
Spud Date: 1996-02-11 | |
Final Drill Date: 1996-04-16 | |
Well Total Depth: 3004.00 m | |
Surface Hole Latitude: 52.389006 | |
Surface Hole Longitude: -115.147334 |
Date | Event |
---|---|
1996-01-23 | Obtained License |
1996-02-17 | Surface Casing Operation Performed |
1996-02-24 | Lost Circulation Occurred |
1996-03-06 | Lost Circulation Occurred |
1996-03-11 | Lost Circulation Occurred |
1996-03-14 | Lost Circulation Occurred |
1996-03-27 | Intermediate Casing Operation Performed |
1996-04-16 | Finished Drilling |
1996-04-16 | Well Log Performed |
1996-04-16 | Well Mode changed to Drilled and Cased |
1996-04-19 | Drill Stem Test Performed |
1996-04-22 | Liner Casing Operation Performed |
1996-04-24 | Rig Released |
1996-07-16 | Perforation Treatment Performed - Jet Perforation |
1996-07-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-07-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-07-18 | Perforation Treatment Performed - Jet Perforation |
1996-07-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-07-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-05-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-05-27 | Perforation Treatment Performed - Jet Perforation |
1997-05-27 | Plug Back Performed |
1997-05-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-06-18 | Perforation Treatment Performed - Fractured |
2000-05-15 | Perforation Treatment Performed - Jet Perforation |
2000-05-15 | Well Log Performed |
2000-05-15 | Well Mode changed to Drilled and Cased |
2000-05-18 | Perforation Treatment Performed - Fractured |
2001-03-01 | Well Began Production |
2001-03-01 | Well Fluid changed to Gas |
2001-03-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-07-16 | Perforation | 2957.00 | 2962.00 | 13 |
1997-05-29 | Acid Treatment | 2861.00 | 2876.00 | 0 |
1997-06-18 | Fracture | 2861.00 | 2876.00 | 0 |
2000-05-15 | Perforation | 2788.00 | 2791.00 | 7 |
2000-05-18 | Fracture | 2788.00 | 2791.00 | 0 |
1996-07-17 | Acid Treatment | 2957.00 | 2962.00 | 0 |
1996-07-18 | Perforation | 2968.50 | 2970.00 | 13 |
1996-07-18 | Acid Treatment | 2957.00 | 2970.00 | 0 |
1996-07-27 | Acid Treatment | 2957.00 | 2970.00 | 0 |
1996-07-29 | Acid Treatment | 2957.00 | 2970.00 | 0 |
1997-05-27 | Packing Device Capped w/Cement | 2922.00 | 2930.00 | 0 |
1997-05-27 | Perforation | 2861.00 | 2862.50 | 13 |
1997-05-27 | Perforation | 2874.50 | 2876.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 6424 | 0.0 | 0.0 | 0.0 |
2002 | 8044 | 0.0 | 0.0 | 0.0 |
2003 | 8589 | 0.0 | 0.0 | 0.0 |
2004 | 8726 | 0.0 | 0.0 | 0.0 |
2005 | 8663 | 0.0 | 0.0 | 0.0 |
2006 | 8411 | 0.0 | 0.0 | 0.0 |
2007 | 8438 | 0.0 | 0.0 | 0.0 |
2008 | 8567 | 0.0 | 0.0 | 0.0 |
2009 | 8458 | 0.0 | 0.0 | 0.0 |
2010 | 7943 | 0.0 | 0.0 | 0.0 |
2011 | 8423 | 0.0 | 0.0 | 0.0 |
2012 | 8779 | 0.0 | 0.0 | 0.0 |
2013 | 8077 | 0.0 | 0.0 | 0.0 |
2014 | 6204 | 0.0 | 0.0 | 0.0 |
2015 | 4853 | 0.0 | 0.0 | 0.0 |
2016 | 4895 | 0.0 | 0.0 | 0.0 |
2017 | 8711 | 0.0 | 0.0 | 0.0 |
2018 | 5711 | 0.0 | 0.0 | 0.0 |
2019 | 6048 | 0.0 | 0.0 | 0.0 |
2020 | 1512 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1996-02-24 | Lost Circulation | 1280.00 | 1507.00 |
1996-03-06 | Lost Circulation | 1775.00 | 2007.00 |
1996-03-11 | Lost Circulation | 2484.00 | 2518.00 |
1996-03-14 | Lost Circulation | 2554.00 | 2554.00 |
For data sources see[6]