If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395092604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.410538,"lon":-115.194243,"icon":""}]} |
Location: 00/04-26-039-09W5/0 | |
Location Alias: 00/04-26-39-09 W5M | |
Location Alias 2: 00/04-26-039-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 09 | |
Section: 26 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ FERRIER 4-26-39-9 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0488545 | |
License Date: 2018-03-12 | |
License Status: Issued | |
Spud Date: 2018-03-24 | |
Final Drill Date: 2018-04-08 | |
Well Total Depth: 5731.00 m | |
Surface Hole Latitude: 52.410538 | |
Surface Hole Longitude: -115.194243 |
Date | Event |
---|---|
2018-03-12 | Obtained License |
2018-03-26 | Surface Casing Operation Performed |
2018-03-30 | Direction Drilling Operation Performed - Deviate |
2018-04-01 | Direction Drilling Operation Performed - Horizontal |
2018-04-08 | Finished Drilling |
2018-04-08 | Well Log Performed |
2018-04-08 | Well Mode changed to Drilled and Cased |
2018-04-10 | Production Casing Operation Performed |
2018-04-10 | Rig Released |
2018-06-01 | Well Began Production |
2018-06-01 | Well Fluid changed to Crude Oil |
2018-06-01 | Well Mode changed to Flowing |
2018-06-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-06-11 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-03-24 | Trinidad Drilling Ltd. | 53 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-03-30 | 1842.90 | Deviate (5 - 79 degrees) |
2018-04-01 | 2632.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-06-03 | Multi-Stage Fracture | 5683.20 | 5683.30 | 0 |
2018-06-04 | Multi-Stage Fracture | 5511.60 | 5511.70 | 0 |
2018-06-09 | Multi-Stage Fracture | 3777.10 | 3777.20 | 0 |
2018-06-09 | Multi-Stage Fracture | 3758.00 | 3758.10 | 0 |
2018-06-09 | Multi-Stage Fracture | 3738.90 | 3739.00 | 0 |
2018-06-10 | Multi-Stage Fracture | 3719.70 | 3719.80 | 0 |
2018-06-10 | Multi-Stage Fracture | 3700.60 | 3700.70 | 0 |
2018-06-10 | Multi-Stage Fracture | 3681.60 | 3681.70 | 0 |
2018-06-10 | Multi-Stage Fracture | 3662.70 | 3662.80 | 0 |
2018-06-10 | Multi-Stage Fracture | 3643.60 | 3643.70 | 0 |
2018-06-10 | Multi-Stage Fracture | 3624.30 | 3624.40 | 0 |
2018-06-10 | Multi-Stage Fracture | 3605.40 | 3605.50 | 0 |
2018-06-04 | Multi-Stage Fracture | 5492.60 | 5492.70 | 0 |
2018-06-10 | Multi-Stage Fracture | 3586.50 | 3586.60 | 0 |
2018-06-10 | Multi-Stage Fracture | 3567.60 | 3567.70 | 0 |
2018-06-10 | Multi-Stage Fracture | 3548.50 | 3548.60 | 0 |
2018-06-10 | Multi-Stage Fracture | 3529.30 | 3529.40 | 0 |
2018-06-10 | Multi-Stage Fracture | 3510.50 | 3510.60 | 0 |
2018-06-10 | Multi-Stage Fracture | 3491.30 | 3491.40 | 0 |
2018-06-10 | Multi-Stage Fracture | 3472.30 | 3472.40 | 0 |
2018-06-10 | Multi-Stage Fracture | 3453.10 | 3453.20 | 0 |
2018-06-10 | Multi-Stage Fracture | 3433.90 | 3434.00 | 0 |
2018-06-10 | Multi-Stage Fracture | 3415.10 | 3415.20 | 0 |
2018-06-04 | Multi-Stage Fracture | 5473.50 | 5473.60 | 0 |
2018-06-10 | Multi-Stage Fracture | 3395.90 | 3396.00 | 0 |
2018-06-10 | Multi-Stage Fracture | 3376.80 | 3376.90 | 0 |
2018-06-10 | Multi-Stage Fracture | 3357.60 | 3357.70 | 0 |
2018-06-10 | Multi-Stage Fracture | 3338.40 | 3338.50 | 0 |
2018-06-10 | Multi-Stage Fracture | 3319.20 | 3319.30 | 0 |
2018-06-10 | Multi-Stage Fracture | 3300.10 | 3300.20 | 0 |
2018-06-10 | Multi-Stage Fracture | 3281.00 | 3281.10 | 0 |
2018-06-10 | Multi-Stage Fracture | 3262.60 | 3262.70 | 0 |
2018-06-10 | Multi-Stage Fracture | 3243.60 | 3243.70 | 0 |
2018-06-10 | Multi-Stage Fracture | 3224.40 | 3224.50 | 0 |
2018-06-05 | Multi-Stage Fracture | 5454.40 | 5454.50 | 0 |
2018-06-10 | Multi-Stage Fracture | 3205.20 | 3205.30 | 0 |
2018-06-10 | Multi-Stage Fracture | 3185.90 | 3186.00 | 0 |
2018-06-10 | Multi-Stage Fracture | 3166.80 | 3166.90 | 0 |
2018-06-10 | Multi-Stage Fracture | 3147.70 | 3147.80 | 0 |
2018-06-10 | Multi-Stage Fracture | 3128.40 | 3128.50 | 0 |
2018-06-10 | Multi-Stage Fracture | 3109.30 | 3109.40 | 0 |
2018-06-11 | Multi-Stage Fracture | 3090.10 | 3090.20 | 0 |
2018-06-11 | Multi-Stage Fracture | 3070.90 | 3071.00 | 0 |
2018-06-11 | Multi-Stage Fracture | 3051.60 | 3051.70 | 0 |
2018-06-11 | Multi-Stage Fracture | 3032.50 | 3032.60 | 0 |
2018-06-05 | Multi-Stage Fracture | 5435.20 | 5435.30 | 0 |
2018-06-11 | Multi-Stage Fracture | 3013.70 | 3013.80 | 0 |
2018-06-11 | Multi-Stage Fracture | 2994.70 | 2994.80 | 0 |
2018-06-11 | Multi-Stage Fracture | 2975.40 | 2975.50 | 0 |
2018-06-11 | Multi-Stage Fracture | 2956.20 | 2956.30 | 0 |
2018-06-11 | Multi-Stage Fracture | 2937.20 | 2937.30 | 0 |
2018-06-11 | Multi-Stage Fracture | 2918.10 | 2918.20 | 0 |
2018-06-11 | Multi-Stage Fracture | 2898.90 | 2899.00 | 0 |
2018-06-11 | Multi-Stage Fracture | 2879.60 | 2879.70 | 0 |
2018-06-11 | Multi-Stage Fracture | 2860.60 | 2860.70 | 0 |
2018-06-11 | Multi-Stage Fracture | 2841.30 | 2841.40 | 0 |
2018-06-05 | Multi-Stage Fracture | 5416.00 | 5416.10 | 0 |
2018-06-11 | Multi-Stage Fracture | 2822.10 | 2822.20 | 0 |
2018-06-11 | Multi-Stage Fracture | 2802.90 | 2803.00 | 0 |
2018-06-11 | Multi-Stage Fracture | 2783.80 | 2783.90 | 0 |
2018-06-11 | Multi-Stage Fracture | 2764.80 | 2764.90 | 0 |
2018-06-11 | Multi-Stage Fracture | 2745.70 | 2745.80 | 0 |
2018-06-11 | Multi-Stage Fracture | 2726.50 | 2726.60 | 0 |
2018-06-11 | Multi-Stage Fracture | 2707.60 | 2707.70 | 0 |
2018-06-11 | Multi-Stage Fracture | 2688.30 | 2688.40 | 0 |
2018-06-11 | Multi-Stage Fracture | 2669.30 | 2669.40 | 0 |
2018-06-05 | Multi-Stage Fracture | 5397.00 | 5397.10 | 0 |
2018-06-05 | Multi-Stage Fracture | 5378.20 | 5378.30 | 0 |
2018-06-05 | Multi-Stage Fracture | 5359.20 | 5359.30 | 0 |
2018-06-05 | Multi-Stage Fracture | 5339.90 | 5340.00 | 0 |
2018-06-04 | Multi-Stage Fracture | 5664.10 | 5664.20 | 0 |
2018-06-05 | Multi-Stage Fracture | 5320.80 | 5320.90 | 0 |
2018-06-05 | Multi-Stage Fracture | 5301.70 | 5301.80 | 0 |
2018-06-05 | Multi-Stage Fracture | 5282.60 | 5282.70 | 0 |
2018-06-05 | Multi-Stage Fracture | 5263.30 | 5263.40 | 0 |
2018-06-05 | Multi-Stage Fracture | 5244.30 | 5244.40 | 0 |
2018-06-06 | Multi-Stage Fracture | 5225.20 | 5225.30 | 0 |
2018-06-06 | Multi-Stage Fracture | 5205.90 | 5206.00 | 0 |
2018-06-06 | Multi-Stage Fracture | 5186.70 | 5186.80 | 0 |
2018-06-06 | Multi-Stage Fracture | 5167.70 | 5167.80 | 0 |
2018-06-06 | Multi-Stage Fracture | 5148.40 | 5148.50 | 0 |
2018-06-04 | Multi-Stage Fracture | 5644.90 | 5645.00 | 0 |
2018-06-06 | Multi-Stage Fracture | 5129.40 | 5129.50 | 0 |
2018-06-06 | Multi-Stage Fracture | 5110.20 | 5110.30 | 0 |
2018-06-06 | Multi-Stage Fracture | 5091.20 | 5091.30 | 0 |
2018-06-06 | Multi-Stage Fracture | 5072.30 | 5072.40 | 0 |
2018-06-06 | Multi-Stage Fracture | 5053.20 | 5053.30 | 0 |
2018-06-06 | Multi-Stage Fracture | 5034.10 | 5034.20 | 0 |
2018-06-06 | Multi-Stage Fracture | 5015.20 | 5015.30 | 0 |
2018-06-06 | Multi-Stage Fracture | 4996.50 | 4996.60 | 0 |
2018-06-07 | Multi-Stage Fracture | 4958.20 | 4958.30 | 0 |
2018-06-07 | Multi-Stage Fracture | 4939.20 | 4939.30 | 0 |
2018-06-04 | Multi-Stage Fracture | 5626.20 | 5626.30 | 0 |
2018-06-07 | Multi-Stage Fracture | 4920.00 | 4920.10 | 0 |
2018-06-07 | Multi-Stage Fracture | 4900.90 | 4901.00 | 0 |
2018-06-07 | Multi-Stage Fracture | 4881.70 | 4881.80 | 0 |
2018-06-07 | Multi-Stage Fracture | 4862.90 | 4863.00 | 0 |
2018-06-08 | Multi-Stage Fracture | 4843.70 | 4843.80 | 0 |
2018-06-08 | Multi-Stage Fracture | 4824.50 | 4824.60 | 0 |
2018-06-08 | Multi-Stage Fracture | 4805.30 | 4805.40 | 0 |
2018-06-08 | Multi-Stage Fracture | 4786.20 | 4786.30 | 0 |
2018-06-08 | Multi-Stage Fracture | 4767.30 | 4767.40 | 0 |
2018-06-08 | Multi-Stage Fracture | 4748.10 | 4748.20 | 0 |
2018-06-04 | Multi-Stage Fracture | 5607.20 | 5607.30 | 0 |
2018-06-08 | Multi-Stage Fracture | 4728.90 | 4729.00 | 0 |
2018-06-08 | Multi-Stage Fracture | 4710.00 | 4710.10 | 0 |
2018-06-08 | Multi-Stage Fracture | 4690.80 | 4690.90 | 0 |
2018-06-08 | Multi-Stage Fracture | 4672.10 | 4672.20 | 0 |
2018-06-08 | Multi-Stage Fracture | 4652.90 | 4653.00 | 0 |
2018-06-08 | Multi-Stage Fracture | 4634.00 | 4634.10 | 0 |
2018-06-08 | Multi-Stage Fracture | 4614.80 | 4614.90 | 0 |
2018-06-08 | Multi-Stage Fracture | 4596.00 | 4596.10 | 0 |
2018-06-08 | Multi-Stage Fracture | 4577.10 | 4577.20 | 0 |
2018-06-08 | Multi-Stage Fracture | 4557.90 | 4558.00 | 0 |
2018-06-04 | Multi-Stage Fracture | 5588.10 | 5588.20 | 0 |
2018-06-08 | Multi-Stage Fracture | 4538.70 | 4538.80 | 0 |
2018-06-08 | Multi-Stage Fracture | 4519.50 | 4519.60 | 0 |
2018-06-08 | Multi-Stage Fracture | 4500.60 | 4500.70 | 0 |
2018-06-08 | Multi-Stage Fracture | 4481.10 | 4481.20 | 0 |
2018-06-08 | Multi-Stage Fracture | 4462.70 | 4462.80 | 0 |
2018-06-08 | Multi-Stage Fracture | 4443.80 | 4443.90 | 0 |
2018-06-08 | Multi-Stage Fracture | 4424.40 | 4424.50 | 0 |
2018-06-09 | Multi-Stage Fracture | 4405.40 | 4405.50 | 0 |
2018-06-09 | Multi-Stage Fracture | 4386.20 | 4386.30 | 0 |
2018-06-09 | Multi-Stage Fracture | 4367.30 | 4367.40 | 0 |
2018-06-04 | Multi-Stage Fracture | 5568.90 | 5569.00 | 0 |
2018-06-09 | Multi-Stage Fracture | 4348.20 | 4348.30 | 0 |
2018-06-09 | Multi-Stage Fracture | 4328.80 | 4328.90 | 0 |
2018-06-09 | Multi-Stage Fracture | 4309.70 | 4309.80 | 0 |
2018-06-09 | Multi-Stage Fracture | 4291.00 | 4291.10 | 0 |
2018-06-09 | Multi-Stage Fracture | 4271.70 | 4271.80 | 0 |
2018-06-09 | Multi-Stage Fracture | 4252.60 | 4252.70 | 0 |
2018-06-09 | Multi-Stage Fracture | 4233.60 | 4233.70 | 0 |
2018-06-09 | Multi-Stage Fracture | 4214.30 | 4214.40 | 0 |
2018-06-09 | Multi-Stage Fracture | 4195.10 | 4195.20 | 0 |
2018-06-09 | Multi-Stage Fracture | 4175.90 | 4176.00 | 0 |
2018-06-04 | Multi-Stage Fracture | 5549.70 | 5549.80 | 0 |
2018-06-09 | Multi-Stage Fracture | 4156.90 | 4157.00 | 0 |
2018-06-09 | Multi-Stage Fracture | 4138.20 | 4138.30 | 0 |
2018-06-09 | Multi-Stage Fracture | 4119.20 | 4119.30 | 0 |
2018-06-09 | Multi-Stage Fracture | 4100.20 | 4100.30 | 0 |
2018-06-09 | Multi-Stage Fracture | 4080.90 | 4081.00 | 0 |
2018-06-09 | Multi-Stage Fracture | 4061.90 | 4062.00 | 0 |
2018-06-09 | Multi-Stage Fracture | 4042.80 | 4042.90 | 0 |
2018-06-09 | Multi-Stage Fracture | 4023.60 | 4023.70 | 0 |
2018-06-09 | Multi-Stage Fracture | 4004.30 | 4004.40 | 0 |
2018-06-09 | Multi-Stage Fracture | 3985.40 | 3985.50 | 0 |
2018-06-04 | Multi-Stage Fracture | 5530.60 | 5530.70 | 0 |
2018-06-09 | Multi-Stage Fracture | 3966.30 | 3966.40 | 0 |
2018-06-09 | Multi-Stage Fracture | 3497.50 | 3497.60 | 0 |
2018-06-09 | Multi-Stage Fracture | 3928.60 | 3928.70 | 0 |
2018-06-09 | Multi-Stage Fracture | 3909.70 | 3909.80 | 0 |
2018-06-09 | Multi-Stage Fracture | 3890.50 | 3890.60 | 0 |
2018-06-09 | Multi-Stage Fracture | 3871.60 | 3871.70 | 0 |
2018-06-09 | Multi-Stage Fracture | 3853.30 | 3853.40 | 0 |
2018-06-09 | Multi-Stage Fracture | 3834.10 | 3834.20 | 0 |
2018-06-09 | Multi-Stage Fracture | 3815.10 | 3815.20 | 0 |
2018-06-09 | Multi-Stage Fracture | 3796.20 | 3796.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-06-03 | 2018-06-11 | 2,350 | 20,859 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 85.2898 | N/A | |||
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 12.2565 | N/A | ||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 2.1588 | N/A | ||
X-CIDE 450 | BJ Services | Bactericide/Biocide | Glutaraldehyde | 111-30-8 | 100 | 0.0264 | N/A | |
Methanol | 67-56-1 | 100 | 0.0264 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0264 | N/A | ||||
CC-2 | BJ Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0613 | N/A | |
Non-hazardous | Not Available | 100 | 0.0613 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0613 | N/A | ||||
D-3 | BJ Services | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0521 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0521 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0521 | N/A | ||||
ThinFrac MP | BJ Services | Friction Reducer | Anionic terpolymer | 12054 | 100 | 0.1604 | N/A | |
Oxyalkylated alcohol | 12054 | 100 | 0.1604 | N/A | ||||
Petroleum distillates | 64742-47-8 | 100 | 0.1604 | N/A | ||||
Sodium chloride | 7647-14-5 | 100 | 0.1604 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1604 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-06-04 | 2018-06-11 | Surface Water - River | 20175 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 4420 | 0.0 | 0.0 | 0.0 |
2019 | 8397 | 0.0 | 0.0 | 0.0 |
2020 | 2134 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-04-11 | No Incident Encountered | 0.00 | 0.00 |
2018-06-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]