X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395093604000

Well Details

Well ID: 0395093604000
Loading map...
Location: 00/04-36-039-09W5/0
Location Alias: 00/04-36-39-09 W5M
Location Alias 2: 00/04-36-039-09 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 09
Section: 36
County/Municipality: Clearwater County
Well Name: YANGARRA HZ FERRIER 4-36-39-9
Operator Name: Yangarra Resources Corp.
License Number: 0486853
License Date: 2017-12-06
License Status: Issued
Spud Date: 2017-12-17
Final Drill Date: 2018-01-06
Well Total Depth: 4035.00 m
Surface Hole Latitude: 52.409627
Surface Hole Longitude: -115.172565

For data sources see[1][2]

Well History

Date Event
2017-12-06 Obtained License
2017-12-19 Surface Casing Operation Performed
2017-12-31 Well Log Performed
2018-01-01 Direction Drilling Operation Performed - Deviate
2018-01-03 Direction Drilling Operation Performed - Horizontal
2018-01-06 Finished Drilling
2018-01-06 Well Log Performed
2018-01-06 Well Mode changed to Drilled and Cased
2018-01-08 Production Casing Operation Performed
2018-01-08 Rig Released
2018-01-17 Well Log Performed
2018-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-17 Well Began Production
2018-02-17 Well Fluid changed to Crude Oil
2018-02-17 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-17 Trinidad Drilling Ltd. 42 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-01 1932.50 Deviate (5 - 79 degrees)
2018-01-03 2544.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-01-25 Multi-Stage Fracture 3986.60 3986.70 0
2018-01-26 Multi-Stage Fracture 3833.00 3833.10 0
2018-01-26 Multi-Stage Fracture 3815.80 3815.90 0
2018-01-26 Multi-Stage Fracture 3798.50 3798.60 0
2018-01-26 Multi-Stage Fracture 3781.20 3781.30 0
2018-01-26 Multi-Stage Fracture 3764.00 3764.10 0
2018-01-26 Multi-Stage Fracture 3746.80 3746.90 0
2018-01-26 Multi-Stage Fracture 3729.60 3729.70 0
2018-01-26 Multi-Stage Fracture 3712.40 3712.50 0
2018-01-26 Multi-Stage Fracture 3695.30 3695.40 0
2018-01-26 Multi-Stage Fracture 3677.90 3678.00 0
2018-01-25 Multi-Stage Fracture 3970.00 3970.10 0
2018-01-26 Multi-Stage Fracture 3660.60 3660.70 0
2018-01-26 Multi-Stage Fracture 3643.40 3643.50 0
2018-01-26 Multi-Stage Fracture 3626.10 3626.20 0
2018-01-26 Multi-Stage Fracture 3608.80 3608.90 0
2018-01-26 Multi-Stage Fracture 3591.60 3591.70 0
2018-01-26 Multi-Stage Fracture 3574.40 3574.50 0
2018-01-26 Multi-Stage Fracture 3557.10 3557.20 0
2018-01-26 Multi-Stage Fracture 3539.90 3540.00 0
2018-01-26 Multi-Stage Fracture 3522.70 3522.80 0
2018-01-26 Multi-Stage Fracture 3505.60 3505.70 0
2018-01-25 Multi-Stage Fracture 3953.60 3953.70 0
2018-01-26 Multi-Stage Fracture 3488.20 3488.30 0
2018-01-26 Multi-Stage Fracture 3470.80 3470.90 0
2018-01-26 Multi-Stage Fracture 3453.40 3453.50 0
2018-01-26 Multi-Stage Fracture 3436.10 3436.20 0
2018-01-26 Multi-Stage Fracture 3418.70 3418.80 0
2018-01-26 Multi-Stage Fracture 3401.40 3401.50 0
2018-01-26 Multi-Stage Fracture 3384.10 3384.20 0
2018-01-26 Multi-Stage Fracture 3366.70 3366.80 0
2018-01-26 Multi-Stage Fracture 3349.60 3349.70 0
2018-01-27 Multi-Stage Fracture 3332.70 3332.80 0
2018-01-25 Multi-Stage Fracture 3936.30 3936.40 0
2018-01-27 Multi-Stage Fracture 3315.60 3315.70 0
2018-01-27 Multi-Stage Fracture 3298.30 3298.40 0
2018-01-27 Multi-Stage Fracture 3280.90 3281.00 0
2018-01-27 Multi-Stage Fracture 3263.80 3263.90 0
2018-01-27 Multi-Stage Fracture 3246.60 3246.70 0
2018-01-27 Multi-Stage Fracture 3229.30 3229.40 0
2018-01-27 Multi-Stage Fracture 3211.80 3211.90 0
2018-01-27 Multi-Stage Fracture 3194.50 3194.60 0
2018-01-27 Multi-Stage Fracture 3177.90 3178.00 0
2018-01-27 Multi-Stage Fracture 3160.90 3161.00 0
2018-01-25 Multi-Stage Fracture 3919.20 3919.30 0
2018-01-27 Multi-Stage Fracture 3143.70 3143.80 0
2018-01-27 Multi-Stage Fracture 3126.30 3126.40 0
2018-01-27 Multi-Stage Fracture 3108.20 3108.30 0
2018-01-27 Multi-Stage Fracture 3090.80 3090.90 0
2018-01-27 Multi-Stage Fracture 3073.40 3073.50 0
2018-01-27 Multi-Stage Fracture 3055.90 3056.00 0
2018-01-27 Multi-Stage Fracture 3038.60 3038.70 0
2018-01-27 Multi-Stage Fracture 3021.50 3021.60 0
2018-01-27 Multi-Stage Fracture 3004.30 3004.40 0
2018-01-27 Multi-Stage Fracture 2987.00 2987.10 0
2018-01-25 Multi-Stage Fracture 3902.00 3902.10 0
2018-01-27 Multi-Stage Fracture 2969.90 2970.00 0
2018-01-27 Multi-Stage Fracture 2952.70 2952.80 0
2018-01-27 Multi-Stage Fracture 2935.50 2935.60 0
2018-01-27 Multi-Stage Fracture 2918.60 2918.70 0
2018-01-27 Multi-Stage Fracture 2901.10 2901.20 0
2018-01-27 Multi-Stage Fracture 2883.90 2884.00 0
2018-01-27 Multi-Stage Fracture 2866.60 2866.70 0
2018-01-27 Multi-Stage Fracture 2849.50 2849.60 0
2018-01-27 Multi-Stage Fracture 2832.20 2832.30 0
2018-01-27 Multi-Stage Fracture 2814.90 2815.00 0
2018-01-25 Multi-Stage Fracture 3884.90 3885.00 0
2018-01-27 Multi-Stage Fracture 2797.80 2797.90 0
2018-01-27 Multi-Stage Fracture 2780.50 2780.60 0
2018-01-27 Multi-Stage Fracture 2763.10 2763.20 0
2018-01-27 Multi-Stage Fracture 2746.00 2746.10 0
2018-01-27 Multi-Stage Fracture 2728.70 2728.80 0
2018-01-28 Multi-Stage Fracture 2711.40 2711.50 0
2018-01-28 Multi-Stage Fracture 2694.10 2694.20 0
2018-01-28 Multi-Stage Fracture 2676.80 2676.90 0
2018-01-28 Multi-Stage Fracture 2659.60 2659.70 0
2018-01-28 Multi-Stage Fracture 2642.30 2642.40 0
2018-01-25 Multi-Stage Fracture 3867.50 3867.60 0
2018-01-28 Multi-Stage Fracture 2624.90 2625.00 0
2018-01-28 Multi-Stage Fracture 2607.60 2607.70 0
2018-01-28 Multi-Stage Fracture 2590.20 2590.30 0
2018-01-26 Multi-Stage Fracture 3850.20 3850.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-25 2018-01-28 2,323 9,140 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 84.254 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 13.2021 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 2.3058 N/A
X-CIDE 450 BJ Services Bactericide/Biocide Glutaraldehyde 111-30-8 100 0.027 N/A
Methanol 67-56-1 100 0.027 N/A
Water 7732-18-5 100 0.027 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.0648 N/A
Non-hazardous Not Available 100 0.0648 N/A
Water 7732-18-5 100 0.0648 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0569 N/A
Isopropanol 67-63-0 100 0.0569 N/A
Methanol 67-56-1 100 0.0569 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.1791 N/A
Oxyalkylated alcohol 9014 100 0.1791 N/A
Petroleum distillates 64742-47-8 100 0.1791 N/A
Polyacrylate 9014 100 0.1791 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-25 2018-01-28 Surface Water - River 8557

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6089 0.0 0.0 0.0
2019 7511 0.0 0.0 0.0
2020 2096 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-09 No Incident Encountered 0.00 0.00
2018-02-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References