If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395093604030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.409493,"lon":-115.172051,"icon":""}]} |
Location: 03/04-36-039-09W5/0 | |
Location Alias: 03/04-36-39-09 W5M | |
Location Alias 2: 03/04-36-039-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 09 | |
Section: 36 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ 103 FERRIER 4-36-39-9 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0492173 | |
License Date: 2018-11-22 | |
License Status: Issued | |
Spud Date: 2018-12-08 | |
Final Drill Date: 2018-12-17 | |
Well Total Depth: 3996.00 m | |
Surface Hole Latitude: 52.409493 | |
Surface Hole Longitude: -115.172051 |
Date | Event |
---|---|
2018-11-22 | Obtained License |
2018-12-09 | Surface Casing Operation Performed |
2018-12-13 | Direction Drilling Operation Performed - Deviate |
2018-12-14 | Direction Drilling Operation Performed - Horizontal |
2018-12-17 | Finished Drilling |
2018-12-17 | Well Log Performed |
2018-12-17 | Well Mode changed to Drilled and Cased |
2018-12-19 | Production Casing Operation Performed |
2018-12-19 | Rig Released |
2019-04-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-04-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-04-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-05-01 | Well Began Production |
2019-05-01 | Well Fluid changed to Crude Oil |
2019-05-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-12-08 | Stampede Drilling A Division Of Matrix Energy Technologi | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-12-13 | 1954.10 | Deviate (5 - 79 degrees) |
2018-12-14 | 2501.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-04-27 | Multi-Stage Fracture | 3952.30 | 3952.40 | 0 |
2019-04-27 | Multi-Stage Fracture | 3792.10 | 3792.20 | 0 |
2019-04-27 | Multi-Stage Fracture | 3774.20 | 3774.30 | 0 |
2019-04-27 | Multi-Stage Fracture | 3756.30 | 3756.40 | 0 |
2019-04-27 | Multi-Stage Fracture | 3738.50 | 3738.60 | 0 |
2019-04-27 | Multi-Stage Fracture | 3720.60 | 3720.70 | 0 |
2019-04-27 | Multi-Stage Fracture | 3702.60 | 3702.70 | 0 |
2019-04-27 | Multi-Stage Fracture | 3684.80 | 3684.90 | 0 |
2019-04-27 | Multi-Stage Fracture | 3667.10 | 3667.20 | 0 |
2019-04-27 | Multi-Stage Fracture | 3649.30 | 3649.40 | 0 |
2019-04-27 | Multi-Stage Fracture | 3631.40 | 3631.50 | 0 |
2019-04-27 | Multi-Stage Fracture | 3934.60 | 3934.70 | 0 |
2019-04-27 | Multi-Stage Fracture | 3613.60 | 3613.70 | 0 |
2019-04-27 | Multi-Stage Fracture | 3595.60 | 3595.70 | 0 |
2019-04-27 | Multi-Stage Fracture | 3577.70 | 3577.80 | 0 |
2019-04-27 | Multi-Stage Fracture | 3559.80 | 3559.90 | 0 |
2019-04-27 | Multi-Stage Fracture | 3541.90 | 3542.00 | 0 |
2019-04-27 | Multi-Stage Fracture | 3524.10 | 3524.20 | 0 |
2019-04-27 | Multi-Stage Fracture | 3506.20 | 3506.30 | 0 |
2019-04-27 | Multi-Stage Fracture | 3488.20 | 3488.30 | 0 |
2019-04-27 | Multi-Stage Fracture | 3470.40 | 3470.50 | 0 |
2019-04-28 | Multi-Stage Fracture | 3452.60 | 3452.70 | 0 |
2019-04-27 | Multi-Stage Fracture | 3916.80 | 3916.90 | 0 |
2019-04-28 | Multi-Stage Fracture | 3434.80 | 3434.90 | 0 |
2019-04-28 | Multi-Stage Fracture | 3416.90 | 3417.00 | 0 |
2019-04-28 | Multi-Stage Fracture | 3399.00 | 3399.10 | 0 |
2019-04-28 | Multi-Stage Fracture | 3381.10 | 3381.20 | 0 |
2019-04-28 | Multi-Stage Fracture | 3363.30 | 3363.40 | 0 |
2019-04-28 | Multi-Stage Fracture | 3345.60 | 3345.70 | 0 |
2019-04-28 | Multi-Stage Fracture | 3327.70 | 3327.80 | 0 |
2019-04-28 | Multi-Stage Fracture | 3309.90 | 3310.00 | 0 |
2019-04-28 | Multi-Stage Fracture | 3292.00 | 3292.10 | 0 |
2019-04-28 | Multi-Stage Fracture | 3274.10 | 3274.20 | 0 |
2019-04-27 | Multi-Stage Fracture | 3899.00 | 3899.10 | 0 |
2019-04-28 | Multi-Stage Fracture | 3256.30 | 3256.40 | 0 |
2019-04-28 | Multi-Stage Fracture | 3238.40 | 3238.50 | 0 |
2019-04-28 | Multi-Stage Fracture | 3220.60 | 3220.70 | 0 |
2019-04-28 | Multi-Stage Fracture | 3202.80 | 3202.90 | 0 |
2019-04-28 | Multi-Stage Fracture | 3185.00 | 3185.10 | 0 |
2019-04-28 | Multi-Stage Fracture | 3167.20 | 3167.30 | 0 |
2019-04-28 | Multi-Stage Fracture | 3149.40 | 3149.50 | 0 |
2019-04-28 | Multi-Stage Fracture | 3131.50 | 3131.60 | 0 |
2019-04-28 | Multi-Stage Fracture | 3113.60 | 3113.70 | 0 |
2019-04-28 | Multi-Stage Fracture | 3095.80 | 3095.90 | 0 |
2019-04-27 | Multi-Stage Fracture | 3881.20 | 3881.30 | 0 |
2019-04-28 | Multi-Stage Fracture | 3078.00 | 3078.10 | 0 |
2019-04-28 | Multi-Stage Fracture | 3060.20 | 3060.30 | 0 |
2019-04-28 | Multi-Stage Fracture | 3042.40 | 3042.50 | 0 |
2019-04-28 | Multi-Stage Fracture | 3024.50 | 3024.60 | 0 |
2019-04-28 | Multi-Stage Fracture | 3006.70 | 3006.80 | 0 |
2019-04-28 | Multi-Stage Fracture | 2988.90 | 2989.00 | 0 |
2019-04-28 | Multi-Stage Fracture | 2971.10 | 2971.20 | 0 |
2019-04-28 | Multi-Stage Fracture | 2953.30 | 2953.40 | 0 |
2019-04-28 | Multi-Stage Fracture | 2935.60 | 2935.70 | 0 |
2019-04-28 | Multi-Stage Fracture | 2917.70 | 2917.80 | 0 |
2019-04-27 | Multi-Stage Fracture | 3863.40 | 3863.50 | 0 |
2019-04-28 | Multi-Stage Fracture | 2899.80 | 2899.90 | 0 |
2019-04-28 | Multi-Stage Fracture | 2881.90 | 2882.00 | 0 |
2019-04-28 | Multi-Stage Fracture | 2864.00 | 2864.10 | 0 |
2019-04-28 | Multi-Stage Fracture | 2846.20 | 2846.30 | 0 |
2019-04-28 | Multi-Stage Fracture | 2828.20 | 2828.30 | 0 |
2019-04-28 | Multi-Stage Fracture | 2810.60 | 2810.70 | 0 |
2019-04-28 | Multi-Stage Fracture | 2792.90 | 2793.00 | 0 |
2019-04-28 | Multi-Stage Fracture | 2775.20 | 2775.30 | 0 |
2019-04-28 | Multi-Stage Fracture | 2757.40 | 2757.50 | 0 |
2019-04-28 | Multi-Stage Fracture | 2739.50 | 2739.60 | 0 |
2019-04-27 | Multi-Stage Fracture | 3845.60 | 3845.70 | 0 |
2019-04-29 | Multi-Stage Fracture | 2721.70 | 2721.80 | 0 |
2019-04-29 | Multi-Stage Fracture | 2703.80 | 2703.90 | 0 |
2019-04-29 | Multi-Stage Fracture | 2686.00 | 2686.10 | 0 |
2019-04-29 | Multi-Stage Fracture | 2668.40 | 2668.50 | 0 |
2019-04-29 | Multi-Stage Fracture | 2650.50 | 2650.60 | 0 |
2019-04-29 | Multi-Stage Fracture | 2632.70 | 2632.80 | 0 |
2019-04-29 | Multi-Stage Fracture | 2614.80 | 2614.90 | 0 |
2019-04-29 | Multi-Stage Fracture | 2596.90 | 2597.00 | 0 |
2019-04-29 | Multi-Stage Fracture | 2578.90 | 2579.00 | 0 |
2019-04-29 | Multi-Stage Fracture | 2561.00 | 2561.10 | 0 |
2019-04-27 | Multi-Stage Fracture | 3827.70 | 3827.80 | 0 |
2019-04-27 | Multi-Stage Fracture | 3809.90 | 3810.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-04-27 | 2019-04-29 | 2,327 | 7,605 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 94.3379 | N/A | |||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.3437 | N/A | ||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.3859 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0086 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0086 | N/A | ||||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0775 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0775 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0483 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0483 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.062 | N/A | |
Methanol | 67-56-1 | 100 | 0.062 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.062 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-04-27 | 2019-04-29 | Surface Water - River | 7370 |
2019-04-27 | 2019-04-28 | Oilfield Produced Water | 91 |
2019-04-27 | 2019-04-28 | Oilfield Produced Water | 60 |
2019-04-27 | 2019-04-28 | Oilfield Produced Water | 60 |
2019-04-27 | 2019-04-27 | Oilfield Produced Water | 29 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 5574 | 0.0 | 0.0 | 0.0 |
2020 | 2143 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-12-19 | No Incident Encountered | 0.00 | 0.00 |
2019-05-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]