X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012606002

Well Details

Well ID: 0404012606002
Loading map...
Location: 00/06-26-040-01W4/2
Location Alias: 00/06-26-40-01 W4M
Location Alias 2: 00/06-26-040-01 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: FCPI ET AL HAYTER 6D-26-40-1
Operator Name: Rife Resources Ltd.
License Number: 0084848
License Date: 1980-08-11
License Status: Abandoned
Spud Date: 1980-09-19
Final Drill Date: 1980-09-22
Well Total Depth: 801.00 m
Surface Hole Latitude: 52.469417
Surface Hole Longitude: -110.042624

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-11 Obtained License
1980-09-22 Finished Drilling
1980-09-22 Well Mode changed to Drilled and Cased
1980-09-24 Production Casing Operation Performed
1980-10-08 Perforation Treatment Performed - Jet Perforation
1981-05-12 Perforation Treatment Performed - Cement Squeeze
1981-05-12 Perforation Treatment Performed - Jet Perforation
1988-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-27 Perforation Treatment Performed - Jet Perforation
1988-01-27 Plug Back Performed
1988-01-28 Perforation Treatment Performed - Fractured
1988-02-01 Well Began Production
1988-02-01 Well Fluid changed to Crude Oil
1988-02-01 Well Mode changed to Pumping
1990-03-29 Well Fluid changed to Crude Oil
1990-03-29 Well Mode changed to Suspended
1994-08-12 Well Log Performed
1994-08-30 Perforation Treatment Performed - Cement Squeeze
1994-08-30 Plug Back Performed
1994-08-30 Well Fluid changed to Crude Oil
1994-08-30 Well Mode changed to Abandoned Zone
1994-09-01 Perforation Treatment Performed - Jet Perforation
1994-09-02 Perforation Treatment Performed - Cement Squeeze
1994-09-02 Plug Back Performed
2017-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-12 Plug Back Performed
2017-09-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-08 Perforation 766.10 770.50 13
2017-08-12 Packing Device Capped w/Cement 642.00 650.00 0
1981-05-12 Perforation 780.00 781.50 13
1981-05-12 Cement Squeeze 780.00 781.50 0
1988-01-27 Packing Device Capped w/Cement 752.00 760.00 0
1988-01-27 Perforation 721.00 725.00 13
1988-01-28 Fracture 721.00 725.00 0
1994-08-30 Cement Squeeze 721.00 725.00 0
1994-09-01 Perforation 766.10 770.50 13
1994-09-02 Cement Squeeze 766.10 770.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 5923 0.0 0.0 0.0
1989 767 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References