X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012608000

Well Details

Well ID: 0404012608000
Loading map...
Location: 00/08-26-040-01W4/0
Location Alias: 00/08-26-40-01 W4M
Location Alias 2: 00/08-26-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: FCPI ET AL HAYTER 8D-26-40-1
Operator Name: Rife Resources Ltd.
License Number: 0084864
License Date: 1980-08-12
License Status: Abandoned
Spud Date: 1980-08-24
Final Drill Date: 1980-08-27
Well Total Depth: 794.00 m
Surface Hole Latitude: 52.469413
Surface Hole Longitude: -110.030629

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-12 Obtained License
1980-08-27 Finished Drilling
1980-08-27 Well Mode changed to Drilled and Cased
1980-08-28 Production Casing Operation Performed
1980-08-28 Well Log Performed
1980-09-02 Perforation Treatment Performed - Jet Perforation
1980-09-16 Well Began Production
1980-09-16 Well Fluid changed to Crude Oil
1980-09-16 Well Mode changed to Pumping
1983-11-23 Perforation Treatment Performed - Visqueeze
1983-12-09 Perforation Treatment Performed - Jet Perforation
1983-12-09 Well Log Performed
1994-05-13 Well Log Performed
2003-11-30 Well Fluid changed to Crude Oil
2003-11-30 Well Mode changed to Suspended
2007-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-07 Plug Back Performed
2007-03-07 Well Fluid changed to Crude Oil
2007-03-07 Well Mode changed to Abandoned Zone
2007-06-11 Well Abandoned
2007-06-11 Well Fluid changed to Crude Oil
2007-06-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-02 Perforation 770.50 772.50 13
1983-11-23 Visqueeze 770.50 772.50 0
1983-12-09 Perforation 771.00 773.00 13
2007-03-07 Packing Device Capped w/Cement 752.00 760.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1843 0.0 0.0 0.0
1981 6643 0.0 0.0 0.0
1982 5018 0.0 0.0 0.0
1983 5785 0.0 0.0 0.0
1984 8124 0.0 0.0 0.0
1985 8133 0.0 0.0 0.0
1986 8629 0.0 0.0 0.0
1987 8362 0.0 0.0 0.0
1988 8681 0.0 0.0 0.0
1989 8449 0.0 0.0 0.0
1990 7458 0.0 0.0 0.0
1991 7483 0.0 0.0 0.0
1992 7037 0.0 0.0 0.0
1993 7896 0.0 0.0 0.0
1994 8460 0.0 0.0 0.0
1995 7702 0.0 0.0 0.0
1996 7369 0.0 0.0 0.0
1997 7476 0.0 0.0 0.0
1998 8052 0.0 0.0 0.0
1999 7049 0.0 0.0 0.0
2000 2596 0.0 0.0 0.0

For data sources see[5]

References