If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404012609B00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.471417,"lon":-110.033474,"icon":""}]} |
Location: B0/09-26-040-01W4/0 | |
Location Alias: B0/09-26-40-01 W4M | |
Location Alias 2: B0/09-26-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 26 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: RIFE ET AL HAYTER 9B-26-40-1 | |
Operator Name: Rife Resources Ltd. | |
License Number: 0115153 | |
License Date: 1985-06-06 | |
License Status: Abandoned | |
Spud Date: 1985-06-27 | |
Final Drill Date: 1985-06-28 | |
Well Total Depth: 780.00 m | |
Surface Hole Latitude: 52.471417 | |
Surface Hole Longitude: -110.033474 |
Date | Event |
---|---|
1985-06-06 | Obtained License |
1985-06-27 | Surface Casing Operation Performed |
1985-06-28 | Finished Drilling |
1985-06-28 | Well Mode changed to Drilled and Cased |
1985-06-29 | Production Casing Operation Performed |
1985-06-29 | Well Log Performed |
1985-06-30 | Rig Released |
1985-07-05 | Perforation Treatment Performed - Jet Perforation |
1985-07-05 | Well Log Performed |
1985-07-10 | Well Began Production |
1985-07-10 | Well Fluid changed to Crude Oil |
1985-07-10 | Well Mode changed to Pumping |
1994-04-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-04-25 | Plug Back Performed |
1994-04-25 | Well Fluid changed to Crude Oil |
1994-04-25 | Well Mode changed to Abandoned and Whipstocked |
2011-06-22 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-07-05 | Perforation | 770.50 | 774.00 | 13 |
1985-07-05 | Perforation | 767.50 | 769.00 | 13 |
1994-04-25 | Packing Device Capped w/Cement | 755.00 | 763.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 4200 | 0.0 | 0.0 | 0.0 |
1986 | 8352 | 0.0 | 0.0 | 0.0 |
1987 | 8639 | 0.0 | 0.0 | 0.0 |
1988 | 8547 | 0.0 | 0.0 | 0.0 |
1989 | 8258 | 0.0 | 0.0 | 0.0 |
1990 | 8254 | 0.0 | 0.0 | 0.0 |
1991 | 6312 | 0.0 | 0.0 | 0.0 |
1992 | 2185 | 0.0 | 0.0 | 0.0 |
1993 | 216 | 0.0 | 0.0 | 0.0 |
For data sources see[5]