X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012609D00

Well Details

Well ID: 0404012609D00
Loading map...
Location: D0/09-26-040-01W4/0
Location Alias: D0/09-26-40-01 W4M
Location Alias 2: D0/09-26-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: FCE ET AL 9D2 HZL HAYTER 9-26-40-1
Operator Name: Rife Resources Ltd.
License Number: 0200322
License Date: 1997-04-15
License Status: Abandoned
Spud Date: 1997-05-01
Final Drill Date: 1997-05-19
Well Total Depth: 1192.00 m
Surface Hole Latitude: 52.473215
Surface Hole Longitude: -110.038474

For data sources see[1][2]

Well History

Date Event
1997-04-15 Obtained License
1997-05-01 Surface Casing Operation Performed
1997-05-17 Direction Drilling Operation Performed - Horizontal
1997-05-19 Finished Drilling
1997-05-19 Well Log Performed
1997-05-19 Well Mode changed to Drilled and Cased
1997-05-20 Liner Casing Operation Performed
1997-05-20 Perforation Treatment Performed - Slotted Liner or Casing
1997-05-20 Rig Released
1997-05-26 Well Log Performed
1997-05-27 Well Log Performed
1997-06-06 Well Began Production
1997-06-06 Well Fluid changed to Crude Oil
1997-06-06 Well Mode changed to Pumping
2017-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-09-11 Plug Back Performed
2017-09-11 Well Fluid changed to Crude Oil
2017-09-11 Well Mode changed to Abandoned Zone
2017-11-20 Well Abandoned
2017-11-20 Well Fluid changed to Crude Oil
2017-11-20 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-05-17 590.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-05-20 Slotted Liner 865.00 1192.00 0
2017-09-11 Packing Device Capped w/Cement 774.90 793.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4588 0.0 0.0 0.0
1998 8228 0.0 0.0 0.0
1999 8416 0.0 0.0 0.0
2000 7849 0.0 0.0 0.0
2001 7728 0.0 0.0 0.0
2002 8085 0.0 0.0 0.0
2003 8138 0.0 0.0 0.0
2004 8206 0.0 0.0 0.0
2005 8119 0.0 0.0 0.0
2006 7760 0.0 0.0 0.0
2007 8080 0.0 0.0 0.0
2008 7765 0.0 0.0 0.0
2009 8412 0.0 0.0 0.0
2010 5278 0.0 0.0 0.0
2011 6905 0.0 0.0 0.0
2012 6624 0.0 0.0 0.0
2013 6856 0.0 0.0 0.0
2014 8096 0.0 0.0 0.0
2015 8402 0.0 0.0 0.0
2016 8298 0.0 0.0 0.0
2017 2463 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References