X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012611B30

Well Details

Well ID: 0404012611B30
Loading map...
Location: B3/11-26-040-01W4/0
Location Alias: B3/11-26-40-01 W4M
Location Alias 2: B3/11-26-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: FCPI ET AL 105 HAYTER 11-26-40-1
Operator Name: Rife Resources Ltd.
License Number: 0168588
License Date: 1994-07-13
License Status: Suspension
Spud Date: 1994-08-01
Final Drill Date: 1994-08-09
Well Total Depth: 1925.00 m
Surface Hole Latitude: 52.471768
Surface Hole Longitude: -110.025636

For data sources see[1][2]

Well History

Date Event
1994-02-07 Well Log Performed
1994-07-13 Obtained License
1994-08-02 Direction Drilling Operation Performed - Horizontal
1994-08-02 Surface Casing Operation Performed
1994-08-05 Intermediate Casing Operation Performed
1994-08-09 Finished Drilling
1994-08-09 Well Log Performed
1994-08-09 Well Mode changed to Drilled and Cased
1994-08-10 Liner Casing Operation Performed
1994-08-10 Perforation Treatment Performed - Slotted Liner or Casing
1994-08-10 Rig Released
1994-08-16 Well Log Performed
1994-09-01 Well Began Production
1994-09-01 Well Fluid changed to Crude Oil
1994-09-01 Well Mode changed to Pumping
2003-09-07 Liner Casing Operation Performed
2017-10-25 Well Log Performed
2017-11-13 Perforation Treatment Performed - Cement Squeeze
2017-11-13 Perforation Treatment Performed - Jet Perforation
2017-11-13 Plug Back Performed
2017-11-13 Well Fluid changed to Crude Oil
2017-11-13 Well Log Performed
2017-11-13 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-08-02 475.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-08-10 Slotted Liner 944.00 1925.00 0
2017-11-13 Perforation 527.00 529.00 20
2017-11-13 Cement Squeeze 527.00 529.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2899 0.0 0.0 0.0
1995 8562 0.0 0.0 0.0
1996 8328 0.0 0.0 0.0
1997 7568 0.0 0.0 0.0
1998 7589 0.0 0.0 0.0
1999 7802 0.0 0.0 0.0
2000 5441 0.0 0.0 0.0
2001 284 0.0 0.0 0.0
2003 1836 0.0 0.0 0.0
2004 7848 0.0 0.0 0.0
2005 7862 0.0 0.0 0.0
2006 7912 0.0 0.0 0.0
2007 7863 0.0 0.0 0.0
2008 7876 0.0 0.0 0.0
2009 8348 0.0 0.0 0.0
2010 8029 0.0 0.0 0.0
2011 8315 0.0 0.0 0.0
2012 7682 0.0 0.0 0.0
2013 8305 0.0 0.0 0.0
2014 8286 0.0 0.0 0.0
2015 5024 0.0 0.0 0.0
2016 7956 0.0 0.0 0.0
2017 2391 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-13 No Incident Encountered 0.00 0.00

For data sources see[7]

References