X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012612B02

Well Details

Well ID: 0404012612B02
Loading map...
Location: B0/12-26-040-01W4/2
Location Alias: B0/12-26-40-01 W4M
Location Alias 2: B0/12-26-040-01 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: FCPI ET AL HAYTER 12B-26-40-1
Operator Name: Rife Resources Ltd.
License Number: 0115164
License Date: 1985-06-06
License Status: Abandoned
Spud Date: 1985-06-16
Final Drill Date: 1985-06-18
Well Total Depth: 784.80 m
Surface Hole Latitude: 52.471870
Surface Hole Longitude: -110.051268

For data sources see[1][2]

Well History

Date Event
1985-06-06 Obtained License
1985-06-17 Surface Casing Operation Performed
1985-06-18 Finished Drilling
1985-06-18 Well Log Performed
1985-06-18 Well Mode changed to Drilled and Cased
1985-06-19 Drill Stem Test Performed
1985-06-19 Production Casing Operation Performed
1985-06-20 Rig Released
1985-06-25 Perforation Treatment Performed - Jet Perforation
1985-06-25 Well Log Performed
1985-08-15 Perforation Treatment Performed - Open-Hole Completion
1985-08-20 Perforation Treatment Performed - Jet Perforation
1985-08-20 Well Log Performed
1985-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-12-06 Plug Back Performed
1985-12-07 Perforation Treatment Performed - Jet Perforation
1985-12-10 Perforation Treatment Performed - Jet Perforation
1985-12-11 Perforation Treatment Performed - Fractured
1985-12-14 Well Began Production
1985-12-14 Well Fluid changed to Crude Oil
1985-12-14 Well Mode changed to Pumping
1994-09-23 Perforation Treatment Performed - Cement Squeeze
1994-09-23 Plug Back Performed
1994-09-23 Well Fluid changed to Crude Oil
1994-09-23 Well Mode changed to Abandoned Zone
1994-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-25 Perforation Treatment Performed - Cement Squeeze
1994-09-25 Perforation Treatment Performed - Jet Perforation
1994-09-25 Perforation Treatment Performed - Open-Hole Completion
1994-09-25 Plug Back Performed
1994-11-12 Well Log Performed
2017-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-12 Plug Back Performed
2017-09-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-06-25 Perforation 770.00 781.40 13
1994-09-25 Open Hole/Barefoot Completion 782.30 784.80 0
1994-09-25 Perforation 778.80 782.80 13
1994-09-25 Acid Treatment 770.00 784.80 0
1994-09-25 Cement Squeeze 770.00 784.80 0
2017-08-12 Packing Device Capped w/Cement 526.00 534.00 0
1985-08-15 Open Hole/Barefoot Completion 782.30 784.80 0
1985-08-20 Perforation 778.80 782.80 13
1985-12-06 Packing Device Capped w/Cement 756.00 765.00 0
1985-12-07 Perforation 735.00 736.50 13
1985-12-10 Perforation 735.00 736.50 13
1985-12-11 Fracture 735.00 736.50 0
1994-09-23 Cement Squeeze 735.00 736.50 0
1994-09-25 Perforation 770.00 781.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 448 0.0 0.0 0.0
1986 8617 0.0 0.0 0.0
1987 8759 0.0 0.0 0.0
1988 8779 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 8663 0.0 0.0 0.0
1991 7991 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8039 0.0 0.0 0.0
1994 5519 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References