X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012613060

Well Details

Well ID: 0404012613060
Loading map...
Location: 06/13-26-040-01W4/0
Location Alias: 06/13-26-40-01 W4M
Location Alias 2: 06/13-26-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: FCE ET AL 13C4 HZL HAYTER 13-26-40-1
Operator Name: Rife Resources Ltd.
License Number: 0207595
License Date: 1997-10-24
License Status: Abandoned
Spud Date: 1997-11-30
Final Drill Date: 1997-12-02
Well Total Depth: 1053.00 m
Surface Hole Latitude: 52.476362
Surface Hole Longitude: -110.046930

For data sources see[1][2]

Well History

Date Event
1997-10-24 Obtained License
1997-11-30 Direction Drilling Operation Performed - Horizontal
1997-12-02 Finished Drilling
1997-12-02 Well Log Performed
1997-12-02 Well Mode changed to Drilled and Cased
1997-12-03 Perforation Treatment Performed - Slotted Liner or Casing
1997-12-03 Production Casing Operation Performed
1997-12-03 Rig Released
1997-12-03 Well Log Performed
1997-12-10 Well Log Performed
1997-12-14 Well Log Performed
1997-12-29 Well Began Production
1997-12-29 Well Fluid changed to Crude Oil
1997-12-29 Well Mode changed to Pumping
2017-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-31 Plug Back Performed
2017-08-31 Well Fluid changed to Crude Oil
2017-08-31 Well Mode changed to Abandoned Zone
2017-09-06 Well Fluid changed to Crude Oil
2017-09-06 Well Mode changed to Abandoned
2017-09-08 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-11-30 591.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-12-03 Slotted Liner 892.10 1050.00 0
2017-08-31 Packing Device Capped w/Cement 780.60 801.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 72 0.0 0.0 0.0
1998 8294 0.0 0.0 0.0
1999 8346 0.0 0.0 0.0
2000 8009 0.0 0.0 0.0
2001 8199 0.0 0.0 0.0
2002 8348 0.0 0.0 0.0
2003 7584 0.0 0.0 0.0
2004 7413 0.0 0.0 0.0
2005 5841 0.0 0.0 0.0
2006 8168 0.0 0.0 0.0
2007 7994 0.0 0.0 0.0
2008 7592 0.0 0.0 0.0
2009 7904 0.0 0.0 0.0
2010 7995 0.0 0.0 0.0
2011 7610 0.0 0.0 0.0
2012 8222 0.0 0.0 0.0
2013 7897 0.0 0.0 0.0
2014 7793 0.0 0.0 0.0
2015 5285 0.0 0.0 0.0
2016 6388 0.0 0.0 0.0
2017 2367 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-31 No Incident Encountered 0.00 0.00

For data sources see[7]

References