If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404012701050 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.468186,"lon":-110.053925,"icon":""}]} |
Location: 05/01-27-040-01W4/0 | |
Location Alias: 05/01-27-40-01 W4M | |
Location Alias 2: 05/01-27-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 27 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB HAYTER 1-27-40-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0188233 | |
License Date: 1996-05-31 | |
License Status: Amended | |
Spud Date: 1996-06-21 | |
Final Drill Date: 1996-06-25 | |
Well Total Depth: 1114.00 m | |
Surface Hole Latitude: 52.468186 | |
Surface Hole Longitude: -110.053925 |
Date | Event |
---|---|
1996-05-31 | Obtained License |
1996-06-22 | Surface Casing Operation Performed |
1996-06-23 | Direction Drilling Operation Performed - Horizontal |
1996-06-24 | Intermediate Casing Operation Performed |
1996-06-25 | Finished Drilling |
1996-06-26 | Liner Casing Operation Performed |
1996-06-26 | Perforation Treatment Performed - Open-Hole Completion |
1996-06-26 | Perforation Treatment Performed - Slotted Liner or Casing |
1996-06-27 | Rig Released |
1996-06-27 | Well Structure changed to Drain |
1996-07-23 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-06-23 | 595.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-06-26 | Slotted Liner | 870.00 | 930.00 | 0 |
1996-06-26 | Open Hole/Barefoot Completion | 930.00 | 1114.00 | 0 |
For data sources see[5]