If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404012713C00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.477266,"lon":-110.075282,"icon":""}]} |
Location: C0/13-27-040-01W4/0 | |
Location Alias: C0/13-27-40-01 W4M | |
Location Alias 2: C0/13-27-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 27 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB HAYTER 13-27-40-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0105577 | |
License Date: 1984-01-30 | |
License Status: Suspension | |
Spud Date: 1984-02-15 | |
Final Drill Date: 1984-02-17 | |
Well Total Depth: 787.20 m | |
Surface Hole Latitude: 52.477266 | |
Surface Hole Longitude: -110.075282 |
Date | Event |
---|---|
1984-01-30 | Obtained License |
1984-02-17 | Finished Drilling |
1984-02-17 | Production Casing Operation Performed |
1984-02-17 | Well Log Performed |
1984-02-17 | Well Mode changed to Drilled and Cased |
1984-02-28 | Perforation Treatment Performed - Jet Perforation |
1984-02-28 | Well Log Performed |
1984-03-02 | Well Began Production |
1984-03-02 | Well Fluid changed to Crude Oil |
1984-03-02 | Well Mode changed to Pumping |
1994-02-28 | Well Fluid changed to Crude Oil |
1994-02-28 | Well Mode changed to Suspended |
1995-06-02 | Well Fluid changed to Crude Oil |
1995-06-02 | Well Mode changed to Pumping |
2004-06-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-12-31 | Well Fluid changed to Crude Oil |
2007-12-31 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-02-28 | Perforation | 772.00 | 775.00 | 13 |
2004-06-08 | Packing Device Capped w/Cement | 756.50 | 764.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 7211 | 0.0 | 0.0 | 0.0 |
1985 | 7686 | 0.0 | 0.0 | 0.0 |
1986 | 8105 | 0.0 | 0.0 | 0.0 |
1987 | 7365 | 0.0 | 0.0 | 0.0 |
1988 | 8496 | 0.0 | 0.0 | 0.0 |
1989 | 8279 | 0.0 | 0.0 | 0.0 |
1990 | 8229 | 0.0 | 0.0 | 0.0 |
1991 | 8382 | 0.0 | 0.0 | 0.0 |
1992 | 5757 | 0.0 | 0.0 | 0.0 |
1995 | 4862 | 0.0 | 0.0 | 0.0 |
1996 | 8534 | 0.0 | 0.0 | 0.0 |
1997 | 8490 | 0.0 | 0.0 | 0.0 |
1998 | 8173 | 0.0 | 0.0 | 0.0 |
1999 | 8622 | 0.0 | 0.0 | 0.0 |
2000 | 8695 | 0.0 | 0.0 | 0.0 |
2001 | 8300 | 0.0 | 0.0 | 0.0 |
2002 | 7277 | 0.0 | 0.0 | 0.0 |
For data sources see[5]