If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404012713D00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.475964,"lon":-110.075796,"icon":""}]} |
Location: D0/13-27-040-01W4/0 | |
Location Alias: D0/13-27-40-01 W4M | |
Location Alias 2: D0/13-27-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 27 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB HAYTER 13-27-40-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0179562 | |
License Date: 1995-07-27 | |
License Status: Suspension | |
Spud Date: 1995-08-31 | |
Final Drill Date: 1995-09-03 | |
Well Total Depth: 887.00 m | |
Surface Hole Latitude: 52.475964 | |
Surface Hole Longitude: -110.075796 |
Date | Event |
---|---|
1995-07-27 | Obtained License |
1995-09-01 | Direction Drilling Operation Performed - Deviate |
1995-09-01 | Surface Casing Operation Performed |
1995-09-03 | Finished Drilling |
1995-09-03 | Production Casing Operation Performed |
1995-09-03 | Rig Released |
1995-09-03 | Well Log Performed |
1995-09-03 | Well Mode changed to Drilled and Cased |
1995-09-11 | Perforation Treatment Performed - Jet Perforation |
1995-09-29 | Well Began Production |
1995-09-29 | Well Fluid changed to Crude Oil |
1995-09-29 | Well Mode changed to Pumping |
1995-10-05 | Perforation Treatment Performed - Jet Perforation |
1995-10-06 | Perforation Treatment Performed - Cement Squeeze |
1995-10-11 | Perforation Treatment Performed - Jet Perforation |
1995-10-24 | Well Log Performed |
2000-06-06 | Well Fluid changed to Crude Oil |
2000-06-06 | Well Mode changed to Suspended |
2004-06-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-09-01 | 224.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-09-11 | Perforation | 812.00 | 815.00 | 13 |
1995-09-11 | Perforation | 816.00 | 818.00 | 13 |
1995-10-05 | Perforation | 828.00 | 829.00 | 13 |
1995-10-06 | Cement Squeeze | 828.00 | 829.00 | 0 |
1995-10-11 | Perforation | 816.00 | 818.00 | 13 |
1995-10-11 | Perforation | 812.00 | 815.00 | 13 |
2004-06-09 | Packing Device Capped w/Cement | 795.50 | 803.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 1977 | 0.0 | 0.0 | 0.0 |
1996 | 8298 | 0.0 | 0.0 | 0.0 |
1997 | 7630 | 0.0 | 0.0 | 0.0 |
1998 | 5434 | 0.0 | 0.0 | 0.0 |
1999 | 3351 | 0.0 | 0.0 | 0.0 |
For data sources see[6]