If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404012807D02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.470833,"lon":-110.086492,"icon":""}]} |
Location: D0/07-28-040-01W4/2 | |
Location Alias: D0/07-28-40-01 W4M | |
Location Alias 2: D0/07-28-040-01 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 28 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB HAYTER 7-28-40-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0154931 | |
License Date: 1992-12-03 | |
License Status: Suspension | |
Spud Date: 1992-12-10 | |
Final Drill Date: 1992-12-12 | |
Well Total Depth: 842.00 m | |
Surface Hole Latitude: 52.470833 | |
Surface Hole Longitude: -110.086492 |
Date | Event |
---|---|
1992-01-06 | Well Log Performed |
1992-12-03 | Obtained License |
1992-12-11 | Direction Drilling Operation Performed - Deviate |
1992-12-11 | Surface Casing Operation Performed |
1992-12-12 | Finished Drilling |
1992-12-12 | Well Log Performed |
1992-12-12 | Well Mode changed to Drilled and Cased |
1992-12-13 | Production Casing Operation Performed |
1992-12-13 | Rig Released |
1992-12-20 | Perforation Treatment Performed - Jet Perforation |
1993-05-17 | Perforation Treatment Performed - Jet Perforation |
1999-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-09-14 | Plug Back Performed |
1999-09-15 | Perforation Treatment Performed - Jet Perforation |
1999-09-16 | Perforation Treatment Performed - Jet Perforation |
1999-09-18 | Perforation Treatment Performed - Fractured |
1999-09-24 | Well Began Production |
1999-09-24 | Well Fluid changed to Crude Oil |
1999-09-24 | Well Mode changed to Pumping |
2006-06-28 | Well Fluid changed to Crude Oil |
2006-06-28 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1992-12-11 | 209.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-12-20 | Perforation | 792.50 | 795.00 | 13 |
1993-05-17 | Perforation | 796.00 | 798.00 | 13 |
1999-09-14 | Packing Device Capped w/Cement | 781.00 | 789.00 | 0 |
1999-09-15 | Perforation | 751.00 | 753.00 | 13 |
1999-09-16 | Perforation | 755.00 | 758.00 | 13 |
1999-09-18 | Fracture | 751.00 | 758.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 1925 | 0.0 | 0.0 | 0.0 |
2000 | 8552 | 0.0 | 0.0 | 0.0 |
2001 | 2518 | 0.0 | 0.0 | 0.0 |
2005 | 120 | 0.0 | 0.0 | 0.0 |
For data sources see[6]